| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.4 LAccepted-AOC | L1 | Accepted-AOC Award of Tender | |
| 2 | L2₹15.2 L+₹2.7 L (21.8%)Rejected-Finance | L2 | Rejected-Finance Hiegher Rate |
Tender Value
Refer Docs
EMD Value
₹42,000
Closing Date
28 Oct 2021, 3:00 pmClosed
EE MCD MZP
EE MCD Irrigation Coloney Fathan Mirzapur
19. Estimate for Repairing of vrb parapet at km 7.853 of ramgadhdy, Vrb cum fall repair at km 8.743, protection wall repair from km 8.738 to km 8.743, km 9.250 to km 9.252 fall cum protection wall repair, protection wall repairfrom km 11.675 to km 11
2021_UPIDC_633889_19
Tender Notice No-3-EEMCD-2021-22
Open Tender
Civil Works
Item Rate
90 days
SONEBHADRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
₹42,000
30 Jul 2022
22 Oct 2021
29 Oct 2021
22 Oct 2021
28 Oct 2021
22 Oct 2021
Amount
Dismantling of stone masonary work including cost of all material labourt&p and taxes etc.
Dismantling of cc floor including cost of all material labourt&p and taxes etc.
E/W in excavation in foundation with all types of soil including all cost of material labourt&p and taxes etc.
local Sand filling in bed with all lead lift including cost of all material labour T&P and taxes etc.
P/L C.C. 1:3:6 with all lead & Lift including all cost of Cement , materials, Labours, T&P & all Taxes
RR 1:4 Stone Masonary with Cement and coarse sand including cost of all material labourt&p etc.
P/L C.C. 1:2:4 in bed with all lead & Lift including all cost of Cement , materials, Labours, T&P & all Taxes
Cement pointing 1:2 with Cement and coarse sand including cost of all material labourt&p etc.
E.W. in back filling with all lead & Lift including all cost of , materials, Labours, T&P & all Taxes.
S/L stone stonekattal including all cost of material labourt&p and taxes etc.
CRS 1:3 Masonary with Cement and coarse sand including cost of all material labourt&p etc.
RCC Wheel guard in VRB four side including all cost of size 1.50Mx0.20Mx0.20M
Bending , Binding, Cutting & Placing of Steel reinforcement including cost of wire for RCC Slab with all lead & Lift including all cost of materials, Labours, T&P & all Taxes.
Centering & Shuttering for CC & RCC work with all lead & Lift including all cost of boulder , materials, Labours, T&P & all Taxes.
CC Slab of 1:1.5:3 with all lead & Lift including all cost of , materials, Labours, T&P & all Taxes.
RAJ ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .