| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAccepted-Finance | ₹1.1 L | L1 | Accepted-Finance Lowest Estimate rate Quoted |
| 2 | L2₹1.2 L+₹10,587.03 (9.33%)Rejected-Finance | ₹1.2 L+₹10,587.03 (9.33%) | L2 | Rejected-Finance Lowest Estimate rate Quoted but Highest Then the L1 |
| 3 | L3₹1.2 L+₹11,020.38 (9.71%)Rejected-Finance | ₹1.2 L+₹11,020.38 (9.71%) | L3 | Rejected-Finance Lowest Estimate rate Quoted but Highest Then the L1 |
| Sl No | Description | Qty | Unit | S. BACKIYAM L2 | A. VIJAYAKUMAR L1 | J.SHAHUL HAMEED L3 |
|---|---|---|---|---|---|---|
| 1.00Renovation of Anganwadi Building (RCC roof) at Narikuravar Colony in Rethinakottai Panchayat | ||||||
| 2.00 | Dismantling the One Course of Pressed Tile Roof finish in cement mortar including all labour charges etc.complete | 36 | Sqm | 80 ₹2,880 | 24.5 ₹882 | 24 ₹864 Lowest |
| 3.00 | Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. | 7.2 | Sqm | 5,480 ₹39,456 | 148.4 ₹1,068.48 | 140 ₹1,008 Lowest |
| 7.00 | Pressed Tiles over the RCC roof slab in including all other labour charges etc., complete and one layer of pressed tiles set in c.m. 1:3 etc., complete.(New Tiles 10%) | 36 | Sqm | 140 ₹5,040 Lowest | 930 ₹33,480 | 1,200 ₹43,200 |
| 8.00 | White washing two coats using shell lime including cost and conveyance ofof all materials to work site and all labour charges etc. | 43.16 | Sqm | 30 ₹1,294.8 Lowest | 34.35 ₹1,482.55 | 35 ₹1,510.6 |
| 9.00 | Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer | 106.16 | Sqm | 180 ₹19,108.8 | 132.45 ₹14,060.89 Lowest | 135 ₹14,331.6 |
| 10.00 | Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer | 94.25 | Sqm | 216 ₹20,358 Lowest | 235.45 ₹22,191.16 | 235 ₹22,148.75 |
| 11.00 | Painting two coats over old iron work with ready mixxed paint of approved colour and quality including cost and conveyance of all materials towork site and all labour charges etc. complete | 29.43 | Sqm | 120 ₹3,531.6 Lowest | 140.2 ₹4,126.09 | 135 ₹3,973.05 |
| 12.00 | Special design Art work with first class quality emulsion paint including wall putty, Priming coat etc., complete. | 27.03 | Sqm | 500 ₹13,515 Lowest | 700 ₹18,921 | 685 ₹18,515.55 |
| 13.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 18,933 ₹18,933 | 17,318 ₹17,318 Lowest | 18,999 ₹18,999 |
Tender Value
₹1.5 L
EMD Value
₹1,500
Closing Date
17 Feb 2026, 3:00 pmClosed
Block Developement Officer(BP)
Panchayat Union Office,Aranthangi
Renovation of Anganwadi Building (RCC roof) at Narikuravar Colony in Rethinakottai Panchayat
2026_RDTN_655194_1
1287/2025/A2 Maintenance Work 24
Open Tender
Maintenance Works
Item Rate
180 days
ARANTHANGI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1,500
5 Mar 2026
11 Feb 2026
17 Feb 2026
11 Feb 2026
17 Feb 2026
11 Feb 2026
Renovation of Anganwadi Building (RCC roof) at Narikuravar Colony in Rethinakottai Panchayat
Dismantling the One Course of Pressed Tile Roof finish in cement mortar including all labour charges etc.complete
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers.
Pressed Tiles over the RCC roof slab in including all other labour charges etc., complete and one layer of pressed tiles set in c.m. 1:3 etc., complete.(New Tiles 10%)
White washing two coats using shell lime including cost and conveyance ofof all materials to work site and all labour charges etc.
Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer
Painting two coats over old iron work with ready mixxed paint of approved colour and quality including cost and conveyance of all materials towork site and all labour charges etc. complete
Special design Art work with first class quality emulsion paint including wall putty, Priming coat etc., complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
arg24.pdf
Tender Documents • 0.24 MB
BOQ_785567.xls
BOQ • 1.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .