Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.2 CrAccepted-Finance | ₹4.2 Cr | 1 | Accepted-Finance 1ST LOWEST |
| 2 | 2₹4.2 CrRejected-Finance | ₹4.2 Cr | 2 | Rejected-Finance 2ND LOWEST |
| Sl No | Description | Qty | Unit | SAI GENERAL ENGINEERING WORKS L2 | MOKSH INNOVATIONS INC. L1 |
|---|---|---|---|---|---|
| 1.00 | Ordinary jungle clearence including uprooting of grass,bush,cutting behaya,etc | 20,815.2 | Sqm. | 4 ₹83,260.8 Lowest | 4 ₹83,260.8 Lowest |
| 2.00 | Dry earth work in foundation Concrete work including lead up to 30.00 M. , lift up to 1.50 M. and back filling as required. | 756.24 | cum | 116.3 ₹87,950.71 | 114.5 ₹86,589.48 Lowest |
| 3.00 | Concrete work for C.C. 1:1.5:3 with Cement ,coarse sand stone grit nominal size in foundation including cost of all material , labour , T&P etc required for proper completion of work. | 756.24 | Cum | 7,559.02 ₹57,16,433.28 | 7,526.5 ₹56,91,840.36 Lowest |
| 4.00 | Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail ,70 cm above road /ground level,fixed on ISMC series channel vertical post ,150x75x5 mm spaced 2 m centre to center,1.80m high ,1.10 m below ground / road level all steel parts and fitments to be galvanized by hot dip process, all fittings to confirm to IS: 1367 and IS: 1364,metal beam rail to be fixed on the vertical post with a spacer of channel section 150x75x5mm,330mm long complete as per clause 810. | 12,290 | Rm. | 2,933 ₹3,60,46,570 | 2,920.5 ₹3,58,92,945 Lowest |
Tender Value
₹4.4 Cr
EMD Value
₹8.9 L
Closing Date
20 Jul 2026, 3:00 pmClosed
SE XII CIRCLE IRRIGATION WORKS LUCKNOW
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
AS PER TENDER NOTICE LOT 05
2026_UPIDC_1168704_5
04/SE-XII/2026-27
Open Tender
Civil Works
Fixed-rate
180 days
SITAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,958
₹8.9 L
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
24 Aug 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
15 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Ordinary jungle clearence including uprooting of grass,bush,cutting behaya,etc | 20,815.2 | Sqm. | - | - |
| 2 | Dry earth work in foundation Concrete work including lead up to 30.00 M. , lift up to 1.50 M. and back filling as required. | 756.24 | cum | - | - |
| 3 | Concrete work for C.C. 1:1.5:3 with Cement ,coarse sand stone grit nominal size in foundation including cost of all material , labour , T&P etc required for proper completion of work. | 756.24 | Cum | - | - |
| 4 | Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail ,70 cm above road /ground level,fixed on ISMC series channel vertical post ,150x75x5 mm spaced 2 m centre to center,1.80m high ,1.10 m below ground / road level all steel parts and fitments to be galvanized by hot dip process, all fittings to confirm to IS: 1367 and IS: 1364,metal beam rail to be fixed on the vertical post with a spacer of channel section 150x75x5mm,330mm long complete as per clause 810. | 12,290 | Rm. | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
BOQ_2192764.xls
BOQ • 0.28 MB
TD5.pdf
Tender Documents • 1.80 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].