Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹1.2 Craccepted-aoc | ₹1.2 Cr | accepted-aoc |
Tender Value
₹1.3 Cr
EMD Value
₹2 L
Closing Date
17 Apr 2026, 10:30 pmClosed
Public Works Department
PADMANABHA H R
IMPROVEMENTS OF ROADS AND DRAINS IN ST POPULATED AREA IN MYSURU TALLUK IN VARUNA VIDANASABHA CONSTITUENCY
PWD/2025-26/RD/WORK_INDENT35140
PWD/2025-26/RD/WORK_INDENT35140
Open
Roads
Two Tender Document System(Two Cover)
PWD Division Office Mysuru
7 documents required · 7 mandatory
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
3.2 (b) Mandating satisfactory completed (at least 90% of the contract value) as a prime contractor for at least one similar work to an extent of 50% of the cost of the work, such as CC Road work of value not less than Rs.65.68 Lakhs in the last five years i.e., 2021-22, 2022-23, 2023-24, 2024-25 & 2025-26.
3.2 (C) Executed in any one year i.e., 2021-22, 2022-23, 2023-24, 2024-25 & 2025-26 the following minimum quantities of work 1)Earth work excavation of 406.00 Cum, 2) Granular sub base of 781.00 Cum, 3)CC/PCC/RCC of 64.00 Cum and 4) CC pavement of 819.00 Cum
Income Tax Balance sheets and proffit and loss statement issued by the CA with Membership No. with UDIN -in the last five years i.e.,2021-22, 2022-23 2023-24, 2024-25 & 2025-26.
3.2 (a) To qualify for award of this contract, each Tenderer in his name should have in the last five years i.e. 2021-22, 2022-23 2023-24, 2024-25 & 2025-26. Achieved in at least two financial years a Minimum financial turn over (in all classes of civil engineering construction works only) of Rs.262.74lakhs.
3.3 (b) liquid assets and or availability of credit facilities of no less than Rs.131.37 Lakhs (Credit lines or letter of credit or certificates from nationalized banks for meeting the fund requirement etc. in the format to be as prescribed in the bid document.
Annual Turnover Certificate issued by the CA with Membership No. with UDIN -in the last five years i.e.,2021-22, 2022-23 2023-24, 2024-25 & 2025-26.
List of existing commitments and ongoing works
₹3,290
₹2 L
17 Apr 2026
1 Apr 2026
18 Apr 2026
16 Apr 2026
8 Apr 2026
MELLAHALLI ROAD
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Granular Sub-Base - Plant Mix Method - Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material...
Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC ...
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 150...
Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak p...
Concrete Works - Cutting transverse contraction joints 3 to 4 mm wide and depth 60mm in concrete slab using concrete cutting machine with diamond studded saw within 4-8 hours of casting of bay...
MELLAHALLI DRAIN
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
AYARAHALLI ROAD
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut ...
Surface Drains in Soil - Construction of unlined surface drains of average cross- sectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated mate...
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (R...
Compacting Original Ground - Compacting original ground supporting embankment - Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of emba...
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transporta...
Granular Sub-Base - Plant Mix Method - Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material...
Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC ...
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 150...
Construction of Subgrade and Earthen Shoulders - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting...
Concrete Works - Cutting transverse contraction joints 3 to 4 mm wide and depth 60mm in concrete slab using concrete cutting machine with diamond studded saw within 4-8 hours of casting of bay...
AYARAHALLI CULVERT
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
PIPE CULVERTS - Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row - Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding...
IMPROVEMENTS OF ROADS AND DRAINS IN ST POPULATED AREA IN MYSURU TALLUK IN VARUNA VIDANASABHA CONSTITUENCY
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut ...
Granular Sub-Base - Plant Mix Method - Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material...
Surface Drains in Soil - Construction of unlined surface drains of average cross- sectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated mate...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (R...
Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 150...
Compacting Original Ground - Compacting original ground supporting embankment - Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of emba...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
PIPE CULVERTS - Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row - Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding...
Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak p...
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transporta...
Concrete Works - Cutting transverse contraction joints 3 to 4 mm wide and depth 60mm in concrete slab using concrete cutting machine with diamond studded saw within 4-8 hours of casting of bay...
Construction of Subgrade and Earthen Shoulders - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BId doc 35140.pdf
Tender Document • 1.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .