| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-Finance | L1 | Accepted-Finance Lowest Rate | |
| 2 | L2₹5.0 L+₹3,393.35 (0.69%)Rejected-Finance | L2 | Rejected-Finance High Rate | |
| 3 | L3₹5.0 L+₹5,817.16 (1.18%)Rejected-Finance | L3 | Rejected-Finance High Rate |
Tender Value
₹4.8 L
EMD Value
₹9,695
Closing Date
26 Jun 2026, 5:30 pmClosed
ASSISTANT ENGINEER, PWD, DJ SD
OFFICE OF THE ASSISTANT ENGINEER, PUBLIC WORKS DIRECTORATE, DARJEELING SUB DIVISION, Lebong Cart Road, Darjeeling 7 34 101.
Repairing of damaged drain at different stretches of 22.00Km-25.00Km of Peshoke road (SH 12) under PWD, Darjeeling Division during the year 2026-2027.
2026_WBPWD_5015349_1
WBPWD/AE/DJ/NIET NO. 06 OF 2026-2027
Open Tender
CIVIL WORKS
Percentage
21 days
DARJEELING
Please Refer Tender Document
4 documents required · 4 mandatory
₹9,695
3 Jul 2026
20 Jun 2026
29 Jun 2026
20 Jun 2026
26 Jun 2026
20 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth. | - | sqm | 221.83 | - |
| 2.01 | Providing and laying Design Mix concrete for plain / reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding shuttering M15 | - | cum | 5,213.82 | - |
| 3.01 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) f)25 mm to 30 mm shuttering without staging in foundation | - | sqm | 214 | - |
| 4.01 | Add GST @ 18% | 0.58 | Units | 0.18 | ₹0.1 |
| 5.01 | Add Labour Welfare Cess @ 1% | 0.58 | Units | 0.01 | ₹0.01 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
2911ii.pdf
Tender Documents • 0.50 MB
BOQ_5084801.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .