Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.6 LAccepted-AOC ALAKHRAJ BHAWAN NEAR MAMTA MOTORS BHUSA MORE WARD NO 7 SINGRAULI M P 486889 | SINGRAULI | MADHYA PRADESH | 486889 | ₹18.6 L Quoted ₹15.8 L | L1 | Accepted-AOC As per TC recommendation and approval of competent authority. |
| 2 | L2₹16.0 L+₹17,167.98 (1.09%)Rejected-Finance NEW MARKET SINGRAULI DISTT SINGRAULI MP 486889 | SINGRAULI | SINGRAULI | MP | 486889 | ₹16.0 L+₹17,167.98 (1.09%) | L2 | Rejected-Finance As per TC recommendation and system generated BOQ. |
| Sl No | Description | Qty | Unit | KUNWAR & SINHA ENGINEERING WORKS L2 | M/S. ATUL ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00PART - A | |||||
| 1.01 | Supply of MS Nut & Bolt (5/8x4'' and 5/8x8'') | 850 | KG | 80 ₹68,000 Lowest | 80 ₹68,000 Lowest |
| 1.02 | Supply of GI stay wire (7/12 SWG) | 1,200 | KG | 80 ₹96,000 Lowest | 80 ₹96,000 Lowest |
| 1.03 | Supply of GI earth wire (7/16 SWG) | 1,600 | KG | 80 ₹1,28,000 Lowest | 80 ₹1,28,000 Lowest |
| 1.04 | Supply of GI stay set complete 1.8 mtr long) | 210 | Nos | 255 ₹53,550 Lowest | 350 ₹73,500 |
| 1.05 | Supply of Tenssion type Hardware | 290 | Nos | 250 ₹72,500 Lowest | 300 ₹87,000 |
| 2.00PART B | |||||
| 2.01 | Excv. of pole pit size 0.8 x 0.8 x 1.8 mtr. In soft rock /soil.(1.152x 282 nos) | 324.86 | cum | 85 ₹27,613.44 Lowest | 90 ₹29,237.76 |
| 2.02 | Excv. Of stay pit size 0.6 x 0.6 x 1.2 mtr. In soft rock /soil (0.432*270nos) | 116.64 | cum | 85 ₹9,914.4 Lowest | 90 ₹10,497.6 |
| 2.03 | Grouting of pole and stay with mine bolder along with 1/2 bag cement | 309.05 | cum | 350 ₹1,08,167.5 | 300 ₹92,715 Lowest |
Tender Value
₹25.6 L
EMD Value
₹32,100
Closing Date
29 Jan 2026, 11:30 amClosed
Staff Officer(EnM), Amlohri Area
Office of Area General Manager, Amlohri Area, NCL, Singrauli - 486887
Shifting and Diversion of Existing 33KV and 6.6 KV HT OHL F no 3,4,11 and 13 towards North side and F no 15 towards East side from existing place near Tapovan s/s for providing space to HOE working in that areas for OB and Coal Exposure.
2026_NCL_351368_1
AML/SO/ENM/ETN/26/657
Open Tender
Electrical and Maintenance Works
Item Rate
90 days
Amlohri Project, NCL
Please refer Tender documents.
3 documents required · 3 mandatory
₹32,100
17 Jun 2026
17 Jan 2026
30 Jan 2026
17 Jan 2026
29 Jan 2026
19 Jan 2026
17 Jan 2026 - 24 Jan 2026
Supply of MS Nut & Bolt (5/8x4'' and 5/8x8'')
Supply of GI stay wire (7/12 SWG)
Supply of GI earth wire (7/16 SWG)
Supply of GI stay set complete 1.8 mtr long)
Supply of Tenssion type Hardware
Excv. of pole pit size 0.8 x 0.8 x 1.8 mtr. In soft rock /soil.(1.152x 282 nos)
Excv. Of stay pit size 0.6 x 0.6 x 1.2 mtr. In soft rock /soil (0.432*270nos)
Grouting of pole and stay with mine bolder along with 1/2 bag cement
Earth pit as per IS 3043 including supply of materials with connection
Erection of Tubular pole 13 to 16 mtr.long
Erection of Stay set with stay Insulator including tensioning as per requirement
Fabrication of MS Channel,angle,flat in shape of bracket/clamps and supports as per required
Erection of fabricated bracket of M S channel on DP/TP/FP as per required
Erection of 11 KV grade Disc insulator with hard ware
Laying & stringing of wolf/AAA conductor incl jumpering
Laying & stringing of Earth wire
Providing guarding on the line including fixing of brackets
Installation of 33 KV Gr Lightning Arrester
Manual Handling,shifting and Laying and of 33 KV Gr Cable through MS pipe from underground to cross the Road and Line
Pole Mounting work of 33 KV Gr Cable to connected HT lines including Outdoor Heat termination kits
Supply & Erection of Danger Board with back clamps
Supply and Erection of Barbed wire on pole 1 mtr long (For 50 Kg)
Providing of paint & Painting of HT Pole 13-16 Mtr long with RM Aluminium paint double coat and with other colours also few portion, (if required) as per instructiion of Engineer I/C(material will be supplied by contractor at his own cost) (For 1 no pole)
Providing of paint & numbering of Feeder and pole no on each pole during shifting,Erection/Dismantling etc or whenever required (For 01 no pole)
Dismantling and shifting of 11 to 16 mtr long tubular pole
Collection and shifting of wolf/AAA conductor after dismantling
Dismantling and shifting of Disc insulator with bracket
Dismantling of bracket,support/cross/clamp etc
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.03 MB
BOQ_364169.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .