Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 CrAccepted-AOC 19B CHIDAMBARANATHAPURAM DEVAKOTTAI SIVAGANGAI DISTRICT | TIRUCHIRAPPALLI | TAMIL NADU | 621308 | ₹1.2 Cr | 1 | Accepted-AOC L1 Accepted |
| 2 | 2₹1.2 Cr+₹5.5 L (4.77%)Rejected-Finance 251 A KARAKATHIKOTTAI MANAMELKUDI TALUK PUDUKKOTTAI 614 619 | PUDUKKOTTAI | TAMIL NADU | 614619 | ₹1.2 Cr+₹5.5 L (4.77%) | 2 | Rejected-Finance L2 Rejected |
| 3 | 3₹1.3 Cr+₹10.0 L (8.73%)Rejected-Finance | ₹1.3 Cr+₹10.0 L (8.73%) | 3 | Rejected-Finance L3 Rejected |
| Sl No | Description | Qty | Unit | Kannan L1 | RRK AND CO L2 | RAMESH CONSTRUCTION L3 |
|---|---|---|---|---|---|---|
| 1.01Periodical Renewal road from MRL17-Muthupettai - Mimisal Road - Moovanur Road Km 0/0-6/300 in Sathiyadi Panchayat | ||||||
| 1.11Advance patchwork to an average thickness upto 50mm using premixed to 45mm IRC size HBG crusher chips/metal over the existing BT surface using 44kg of Bitumen of 60/70 grade per one cum including cost and conveyance of chips/metal from approved sources to work site and stacking them to departmental metric gauge for premeasurement including cost of Bitumen and all taxes payable, which will be supplied by department as specified in the special condition appended including cost and conveyance of 60/70 grade bitumen to work site and all imcidental charges such as storage, handling charges etc, including heating the Bitumen for Premixing all labour charges and T & P charges for patching the surface and all other incidental charges ete complete as per M.O.R.T.H specification | ||||||
| 1.21 | Km 0/0 - 1/0 | 4.95 | Cum | 4,400 ₹21,780 Lowest | 4,560 ₹22,572 | 4,782 ₹23,670.9 |
| 1.31 | Km 1/0 - 2/0 | 4.75 | Cum | 4,400 ₹20,900 Lowest | 4,570 ₹21,707.5 | 4,790 ₹22,752.5 |
| 1.41 | Km 2/0 - 3/0 | 4.71 | Cum | 4,400 ₹20,724 Lowest | 4,570 ₹21,524.7 | 4,799 ₹22,603.29 |
| 1.51 | Km 3/0 - 4/0 | 4.86 | Cum | 4,400 ₹21,384 Lowest | 4,600 ₹22,356 | 4,807 ₹23,362.02 |
| 1.61 | Km 4/0 - 5/0 | 4.25 | Cum | 4,400 ₹18,700 Lowest | 4,587 ₹19,494.75 | 4,816 ₹20,468 |
| 1.71 | Km 5/0 - 6/0 | 3.65 | Cum | 4,400 ₹16,060 Lowest | 4,595 ₹16,771.75 | 4,823 ₹17,603.95 |
| 1.81 | Km 6/0 - 6/300 | 1.52 | Cum | 4,400 ₹6,688 Lowest | 4,600 ₹6,992 | 4,830 ₹7,341.6 |
| 1.91Advance patchwork to an average thickness upto 25mm using premixed 13.2mm IRC size HBG crusher chips/metal over the existing BT surface using 44kg of Bitumen of 60/70 grade per one cum including cost and conveyance of chips/metal from approved sources to work site and stacking them to departmental metric gauge for premeasurement including cost of Bitumen and all taxes payable, which will be supplied by department as specified in the special condition appended including cost and conveyance of 60/70 grade bitumen to work site and all incidental charges such as storage, handling charges etc, including heating the Bitumen for Premixing all labour charges and T & P charges for patching the surface and all other incidental charges etc complete as per M.O.R.T.H specification | ||||||
Tender Value
₹1.2 Cr
EMD Value
₹2.5 L
Closing Date
30 May 2025, 3:00 pmClosed
ADDITIONAL COLLECTOR (DEVELOPMENT)
DRDA PUDUKKOTTAI
Package No. TN13-113R Manamelkudi Panchayat Union Periodical Renewal road from MRL17-Muthupettai - Mimisal Road - Moovanur Road Km 0/0-6/300 in Sathiyadi Panchayat
2025_RDTN_141412_1
PDKT/TN13-113R/MLK
Open Tender
Civil Works - Roads
Item Rate
120 days
Manamelkudi
Pls Refer Tender Documents
4 documents required · 4 mandatory
₹0
₹2.5 L
DRDA PUDUKKOTTAI
9 Sept 2025
17 May 2025
30 May 2025
17 May 2025
30 May 2025
17 May 2025
27 May 2025
Amount
Periodical Renewal road from MRL17-Muthupettai - Mimisal Road - Moovanur Road Km 0/0-6/300 in Sathiyadi Panchayat
Advance patchwork to an average thickness upto 50mm using premixed to 45mm IRC size HBG crusher chips/metal over the existing BT surface using 44kg of Bitumen of 60/70 grade per one cum including cost and conveyance of chips/metal from approved sources to work site and stacking them to departmental metric gauge for premeasurement including cost of Bitumen and all taxes payable, which will be supplied by department as specified in the special condition appended including cost and conveyance of 60/70 grade bitumen to work site and all imcidental charges such as storage, handling charges etc, including heating the Bitumen for Premixing all labour charges and T & P charges for patching the surface and all other incidental charges ete complete as per M.O.R.T.H specification
Advance patchwork to an average thickness upto 25mm using premixed 13.2mm IRC size HBG crusher chips/metal over the existing BT surface using 44kg of Bitumen of 60/70 grade per one cum including cost and conveyance of chips/metal from approved sources to work site and stacking them to departmental metric gauge for premeasurement including cost of Bitumen and all taxes payable, which will be supplied by department as specified in the special condition appended including cost and conveyance of 60/70 grade bitumen to work site and all incidental charges such as storage, handling charges etc, including heating the Bitumen for Premixing all labour charges and T & P charges for patching the surface and all other incidental charges etc complete as per M.O.R.T.H specification
Applying tack coat over BT surface (not treated with primer) using 0.020 to 2.5Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade- II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8- 10 tonnes vibratory/phenumatic roller to the required density etc.. including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher, vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with hot applied thermoplastic compound with Reflectorising Glass Beads on Bituminous surface
Provision of Name Board cum Citizen board
Maintenance of the road
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
RRK AND CO (BID ID -618561)
RAMESH CONSTRUCTION (BID ID -618581)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .