Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 CrAccepted-AOC NO 622 VANNIYAR NAGAR ALAGAPURAM PERIYAPUDHUR SALEM 636016 | SALEM | SALEM | TAMIL NADU | 636016 | ₹4.7 Cr | L1 | Accepted-AOC Lowest bidder |
| 2 | L2₹4.8 CrRejected-AOC NO 5 MOOGAMBIGAI NAGAR MANOJIPATTI ROAD M C POST THANJAVUR 613004 | THANJAVUR | TAMIL NADU | 613004 | ₹4.8 Cr | L2 | Rejected-AOC Other than lowest bidder |
| 3 | L3₹5.0 CrRejected-AOC | ₹5.0 Cr | L3 | Rejected-AOC Highest bidder |
| Sl No | Description | Qty | Unit | SS Associates L1 | SARAVANA ASSOCIATES L2 | K.C.JAYAKUMAR L3 |
|---|---|---|---|---|---|---|
| 1.00Providing two legged scaffolding using 48.30mm dia heavy duty MS pipe over all height of 3.00m the distance between 2 legs being 1.25m and the spacing of the post being 2m in each rows and providing platform with C.W. planks using 40mm thick silver oak and 1.00m wide in complete form with horizontal bracings @ 1.50m c/c vertical direction and with cross bracings using same 48.30mm dia including cutting, threading assembly with red oxide primer, labour charges cost of specials such on large plate, shoe, carcher, coupling, bolt and nut transportation charges. The bottom of vertical post shall rest on 300x300x70mm 1:2:4 concrete base etc complete complying with standard specification and as directed by the departmental officers. | ||||||
| 1.10 | For Initial height of 3m | 115 | Rm | 610 ₹82,777 | 626 ₹84,948.20 | 644 ₹87,390.80 |
| 1.20 | For every additional 2.5m height | 265 | Rm | 500 ₹1.6 L | 518 ₹1.6 L | 533 ₹1.7 L |
| 2.00 | Dismantling and clearing away carefully and stacking materials useful for reuse of damaged Mangalore Tile roofing including removal of pan tiles,wooden reeper with T.W.planks and stocking of the useful materials ets.complete complying with standard specification and as directed by the departmental officers. | 325 | Sqm | 415 ₹1.6 L | 428 ₹1.6 L | 440 ₹1.7 L |
| 3.00 | Dismantling of cracked Madras terrace roofing after giving proper centering to the ceiling for the safety of labourers and coveying the debris from inside to outside etc., complete complying with standard specification and as directed by the departmental officers. | 325 | Sqm | 460 ₹1.8 L | 475 ₹1.8 L | 488 ₹1.9 L |
| 4.00 | Dismantling of damaged and undulated flooring and conveying debries from all floors to ground level outside the mahal etc., complete complying with standard specification and as directed by the departmental officers. | 740 | Sqm | 275 ₹2.4 L | 285 ₹2.5 L | 293 ₹2.6 L |
| 5.00 | Dismantling of brick jelly lime concrete flooring of any thickness and conveying by dolly and stacking the useful stone for reuse etc., | 40 | Cum | 480 ₹22,656 | 496 ₹23,411.20 | 509 ₹24,024.80 |
| 6.00Dismantling and clearing away carefully and stacking materials useful for reuse the cracked/ dislodged brick wall of the building and to dispose debris etc complete complying with standard specification and as directed by the departmental officers. | ||||||
| 6.10 | Ground floor | 35 | Cum | 255 ₹10,531.50 | 262 ₹10,820.60 | 269 ₹11,109.70 |
| 6.20 | First floor | 35 | Cum | 280 ₹11,564 | 291 ₹12,018.30 | 299 ₹12,348.70 |
Tender Value
₹4.4 Cr
EMD Value
₹4.4 L
Closing Date
10 Jul 2025, 3:00 pmClosed
Superintending Engineer
Superintending Engineer, Heritage Buildings Circle, Chennai - 5.
Conservation, Renovation and Restoration of Heritage Building in Government Arts College for Women at Salem in Salem District
2025_PWD_575212_1
18/HBC/2025-26
Open Tender
Civil Works - Buildings
365 days
Salem
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹4.4 L
Yes
18 Mar 2026
28 Jun 2025
10 Jul 2025
28 Jun 2025
10 Jul 2025
28 Jun 2025
Amount
Providing two legged scaffolding using 48.30mm dia heavy duty MS pipe over all height of 3.00m the distance between 2 legs being 1.25m and the spacing of the post being 2m in each rows and providing platform with C.W. planks using 40mm thick silver oak and 1.00m wide in complete form with horizontal bracings @ 1.50m c/c vertical direction and with cross bracings using same 48.30mm dia including cutting, threading assembly with red oxide primer, labour charges cost of specials such on large plate, shoe, carcher, coupling, bolt and nut transportation charges. The bottom of vertical post shall rest on 300x300x70mm 1:2:4 concrete base etc complete complying with standard specification and as directed by the departmental officers.
For Initial height of 3m
For every additional 2.5m height
Dismantling and clearing away carefully and stacking materials useful for reuse of damaged Mangalore Tile roofing including removal of pan tiles,wooden reeper with T.W.planks and stocking of the useful materials ets.complete complying with standard specification and as directed by the departmental officers.
Dismantling of cracked Madras terrace roofing after giving proper centering to the ceiling for the safety of labourers and coveying the debris from inside to outside etc., complete complying with standard specification and as directed by the departmental officers.
Dismantling of damaged and undulated flooring and conveying debries from all floors to ground level outside the mahal etc., complete complying with standard specification and as directed by the departmental officers.
Dismantling of brick jelly lime concrete flooring of any thickness and conveying by dolly and stacking the useful stone for reuse etc.,
Dismantling and clearing away carefully and stacking materials useful for reuse the cracked/ dislodged brick wall of the building and to dispose debris etc complete complying with standard specification and as directed by the departmental officers.
Ground floor
First floor
Second floor
Dismantling and clearing away the damaged doors and winsdows including removal of frames,hinges and fastening etc., complete complying as directed by the departmental officers as per standard specification.
Dismantling of Leaky weathering course with pressed tiles and disposing the debris including proper centering for the safety of labours etc., complete complying with standard specification and as directed by the departmental officers.
Removing and clearing away carefully and stacking materials useful for reuse of the decayed wooden beam/joist/girder in roofing in all floors by carefully dislodging at ends and top including making necessary notches or openings in the wall on either side of joist, beam to enable it removed etc., complete complying with standard specification and as directed by the departmental officers.
Removing the existing detoriated lime plastering over the wall, arches, domes and special type of ceiling of Madras terraced type roof carefully without disturbing or damaging the rafters, etc., complete complying with standard specification and as directed by the departmental officers.
Laying Brick jelly lime concrete in lime mortar 1:2 ( One lime and two brick jelly ) (no sand to be added) using 20 mm gauge brick jelly for foundation, flooring including dewatering wherever necessary and laid in layers well rammed, consolidated etc., complete complying with standard specification and as directed by the departmental officers.
Reconstructing the brick masonry wall with similar type of Brick work in lime mortar 1:2 (one lime two sand) using wire cut brick of size 9"x4"x3" (Specially manufacturing) and using Pollachi lime in all floors as per traditional preparation and doCu.mented type such as arches and lintels, walls, etc., complete complying with standard specification and as directed by the departmental officers.
Ground floor
First floor
Second floor
Teakwood wrought & putup for joist, beam, rafters and purlins,etc., which are in full length new member placed for supporting the Madras Terrace roof/ Mangalore tiles roof or any other area in all floor as directed by the departmental officers by using well seasoned superior quality and approved variety of teakwood for heritage building work including fixing of iron holdfasts incase of doors, windows and ventilators etc.,and excluding cost of holdfasts and making necessary size holes in the masonry to receive the ends of wooden joists, beams, etc., all fixtures and fastenings etc., complete. Item to include all moulding (The rate includes the cost of teakwood, labour charges for wrought and putup to the existing clue/design, fixing in position to true alignment and gradient wherever necessary. Complying with standard specifications and as directed by the departmental officers
Redoing of Madras Terrace roof in all floors with one layer of brick on edge course laid as first layer over the existing Teakwood joists, Beams, I Sections, etc., which are placed at roof level in all floors using specially manufactured Terrace bricks for heritage works of size 150mm x 75mm x 25mm in lime mortar 1:1.5 (one lime and one and half sand).of size 150mm x 75mm x 25mm in flat manner in lime mortar 1:2 ( one lime and t\wo sand) 20mm thick as base layer laid over the top of brick on edge course. Brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no sand to be added) to the proportion of brick jelly to lime being 32:12.50 by volume laid over the second layer of terrace bricks for an average consolidated thickness of 100mm in a he second layer of terrace bricks for an average consolidated thickness of 100mm in a single layer of required slope/level as directed and finished by beating the concrete with single layer of required slope/level as directed and finished by beating the concrete with lime jaggery (PALM JAGGERY) water. (Galnut of 10kg and jaggery of 10kg per one sq.m).The beating of the concrete is done continuously until the brick jelly lime concrete is ime should only be used. The period of interval between laying of I layer, II layer of terrace bricks, brick jelly lime concrete and flat tiles in two consecutive layers as directed by the departmental officers etc., complete complying with standard specifications. The Madras Terrace roof laid over the roof joist, beam, etc., is well embedded in the wall to the required distance as directed by the Engineer In Charge. (The rate includes the cost of all materials like terrace brick for heritage works, brick jelly 20mm, Pollachi lime, flat tiles and SBR chemicals and labour charges for laying all items of works).
Pollachi limeshould only be used for preparation of mortar, brick jelly lime concrete etc.. The Terrace bricks, flat tiles should got approved by the Executive Engineer before use on works.The overall thickness of madras terrace roof laid is to be of 300mm as detailed below. Brick on edge course (I layer) = 75mm Base mortar for laying terrace bricks = 20mm Laying of terrace bricks (II layer) = 25mm Brick jelly lime concrete = 100mm Base mortar for flat tiles = 15mm Laying flat tiles(I course) = 25mm Base mortar for flat tiles (II layer) = 15mm Flat tiles (II course) = 25mm Total thickness = 300mm
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mmx 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers.
Relaying of roof with Heritage mangalore tiles over Galvanised sheet in Teak wood reepers of size (50x12mm) using lime in all floors for Brick masonry band with mangalore tiles, including Teak wood reepers of size (50x12mm) complete complying with standard specification and as directed by the departmental officers.(The rate includes the cost of all materials like Mangalore tiles,Galvanised sheet,and labour charges for laying of Mangalore tiles with Galvanised sheet roof in position).
Supplying and stacking new best Heritage Ridge tiles at site of work for premeasurement as directed by the departmental officers, etc., complete.
Racking out the brick joints of walls, arches, etc.,to a depth of approximately 5cm a wall thickness of 45cm and above to remove the dead mortar in between the brickfo joints and cleaning the surface with coir brush and washed with pure water etc complete complying with standard specification and as directed by the departmental officers.
Grouting and stiching the wide cracks at roof (Madras Terrace Roof ) using lime mortar 1:2 with pot pieces for filling up the cracks and the voids, creivices and gap etc.shall be completely sealed with necessary grouting pump. This pressure pump is to be used after cleaning the cracks, washing etc., and then the cracks are grouted with lime mortar 1:2 and it is allowed to be cured till final setting of lime mortar before taking up further leak proof treatment work.
Pointing,grouting and filleting the brick joint of wall and arches with lime mortar 1:2 (one of lime and two of sand) using Pollachi lime in all floors etc., complete complying with standard specification and as directed by the departmental officers.
Strengthening the existing walls by providing grouting by formation of holes of size Strengthening the existing walls by providing grouting by formation of two holes of size 1” with required intervals - depth of 350mm for an area of 1 sq.m and depending upon the site conditions injecting lime slurry consisting of lime mortar 1:2 (one lime and two of sand) using Pollachi lime in all floors added with grouting admixture by 2% weight of lime, by using required equipment and the rate includes the cost of all materials,labour charges etc., complete complying with standard specification and as directed by the departmental officers
Replastering ( base plastering) the brick wall, pillars and arches of mahal building with lime mortar 1:2 ( one of lime and two of sand) to a thickness of 30 mm as per existing construction including erection & dismantling , curing etc.,complete complying with standard specification and as directed by the departmental officers.
Replastering the ceiling with Lime mortar 1:1.5 (one Lime and one and half sand), 20mm thick including labour charges for erection and dismantling of scaffolding and curing etc complete complying with standard specifications as directed by the departmental officers.
Applying thin coat of hand grinded lime mortar paste in lime mortar 1:1.5 (one lime and one and half sand) 6mm thick using Pollachi lime in all floors ( mix should be with 5.9 kg of jaggery, 2 kg of glue, 1.1 kg of gallnut, 1.4 kg of oakum, 30 nos eggs, 1 litre curd, 3 kg white marble powder, 0.5 kg vajram, 0.06m3 of surki, (for 10 sq.m area) of mugal plastering ( Theervai) over the newly plastered surface as per the existing clues (including finishing the surface with smoothness) `etc., complete complying with standard specification and as directed by the departmental officers.
Renewing and fixing teak wood panelled Door shutters openable type by using well seasoned teak wood of superior quality and approved variety as per the original design and pattern instructed by the Engineer in charge. The door shutter is made with two number of 120mmx40mm size vertical styles, top rail, lock rails and bottom rails of size 125mmx40mm,250mm x 40mm, 170mmx40mm respectively. The door shutter panels is covered with teak wood planks of 25mm thick including all necessary fittings brass/ steel hardwares like screws, nails, hinges, hooks, tower bolts, handle, aldrops of same design of the design, size etc complete. item to also include making all the mouldings and panels as in the existing evidence. item to include complete finishing of the shutters as directed by the departmental officer. (The rate inclusive of cost of all teak wood materials, Labour wrought and putup of door frames and shutters, cost of all furniture fittings, labour charges for fixing inposition etc., complete complying with standard specifications. (Two Leaves ).
Easing and repairing hanging doors, window shutters and refixing the same after attending the petty repairs including fixing furniture fittings and excluding cost of furniture fittings etc., complete complying with standard specification and as directed by the departmental officers.
Making, supplying and fixing of panelled window of size 1.65x2.10m with Teak wood window shutter is made with two number of 75mmx35mm size vertical styles, top rail, lock rails and bottom rail of size 80mmx35mm,200mmx35mm, 129mmx25mm respectively .The window shutter panels is covered with teak wood planks of 35mm thick including all necessary fittings brass/steel hardwaraes like screws, nails, hinges, hooks, tower bolts, handle, aldrops of same design, size etc complete. item to also include making all the mouldings and design of the panels as in the existing evidence. item to include complete finishing of the shutters as directed by the departmental officer. (The rate inclusive of cost of all teak wood materials, Labour wrought and putup of door frames and shutters, cost of all furniture fittings, labour charges for fixing inposition etc., complete complying with standard specifications).
Making, supplying and fixing of glazed ventilator with new Teak wood glazed ventilator of size 1.20x0.60m by using Teak wood scanting thickness of size 0.04m frames fixed with 4mm thick pin headed glass including labour for wrought put up and fixing the ventilator in position with necessary furniture fittings including finishing the Ventilator with one coat of primer and finishing neatly etc., complete complying with standard specifications and as directed by the departmental officers.
Renewing the damaged teak wood ornamental hand rail in stair case and verandha portion with superior quality of teak wood and kadasal work in all the members, the top member of size 8 x 6 cm with curved surface, in bottom member of size 10 x 8 cm, the internal vertical supports are 6.5 x 6.5 cm, the internal bracing and design members of side with 2.50 x 2.50 cm with complete kadasal works, the rate inclusive of cost teak wood, skilled labour charges, necessary screws, nails, etc., complete complying with standard specification as directed by the departmental officers.
Reconstruction of fallen and missing circular column brick pillars to a size of 2.80 m height and 0.50m dia with special brick in lime mortor 1:2 and plastering with lime mortor 1:2 including fixing granite stone and then finally applying the coat of hand grinded lime mortar paste as per the existing size available at site, including erection of scaffolding etc., complete
Paving the floor with best quality Heritage pattern Cement tile & Handmade tile of size 200 x 200 mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
White washing three coats of inner walls/ceiling with freshly burnt white shell lime (Pollachi lime) in all floors including cost of lime, blue powder fevicol type gum, brushes, The rate inclusive of cost of all materials and labour charges etc., complete complying with standard specification and as directed by the departmental officers
Painting two coats of ready mixed Exterior Emulsion Paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt,and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting girder and MS plate with two coats of anticorrosive paint of special quality including cost of brushes, high scafoldingcharges. to give a wooden look like finish complying with standard specifications
Revarnishing the old wood work with two coats of best melamine varnish of approved quality and brand including preparation of surface etc. The rate is inclusive cost of all materials, labour charges and finishing neatly etc., complete complying with standard specification and as directed by the departmental officers etc. complete.
Labour charge for removing painting in TW joist , beams , doors , windows etc., as per std specification
Painting new wood work with two finishing coats of synthetic enamel ready mixed paint of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Collecting the scattered debris from the campus and conveying away the same to outside by lorry to a lead of 6KM including loading and unloading charges and dumping in low places and leveling etc., complete.
Clean removal of saline action over the stone pillars, brick walls etc., with paper pulp treatment by using floating paper, deionized water, plastic bucket, coir , brush etc., complete complying with standard specifications as per directed by the departmental officers
Removing the existing vegetation growth in the building by the way of uprooting the plants manually and then drilling with power driller up to the root depth of plants to obtain a clean and neat drill so as to continuously inspect and remove left over roots of vegetation growth and to inject pesticides into the holes so as to prevent further growth of vegetation in the future to safeguard the country old heritage building etc. the cost including the cost of pesticides used, hire charges of injecting machine for injecting chemicals, cost of tools and all labour charges etc complete. the above works should be carried out as per the direction of the departmental officers and complying with standard specifications.
Big plant
Medium plant
Small plant
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) For plane surfaces such as RCC floor slab, roof slab, beams, lintels, bed blocks, landing slab, waist slab, portico slabs and beams, etc.
Providing additional strutting to centering of RCC slabs of plain surface for every additional 1.0 metre height or part thereof but not less than 30 cm, over the initial 3.00 metre 1.0 metre height or part thereof but not less than 30 cm, over the initial 3.00 metre height from floor level using casurina props of 10cm to 13cm dia including cross bracing etc., complete complying with standard specification and as directed by the department officers.
Construction of mortar pit of inner size 0.90mx0.45m with brick partition wall thick in cement mortar 1:3 (one cement and three sand) for 60 cm height with necessary earth work open excavation for size of 1.43m x 0.98m to a depth of 0.91m and sand filling for 15 cm thick, Plain Cement Concrete 1:5:10 (one cement, five sand and ten 40mm HBG stone jelly), 8 cm thick with plastering 1:5 (one cement and sand), 12mm thick11.50cm on both sides and top etc.. complying with standard specification and as directed by the departmental officers
Providing pest control with antitermite treatement by drilling holes at junction of walls with floors at 300mm intervals and injucting chemical emulsion on those with cement etc. making holes along the vertical surface out side the walls at 150mm intervals to the depth of 450mm pointing chemical emulsion into the holes and closing holes with chemical etc. spraying all surface of treatment is to be done as per IS code no:5313/ Part III 1981 with approved chemical. (The chemical is to be used on the work should be got approved by the Executive Engineer before use on work) etc complete complying with standard specification and as directed by the departmental officers.
SARAVANA ASSOCIATES (BID ID -1397539)
K.C.JAYAKUMAR (BID ID -1397400)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_687269.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid