Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.3 LAccepted-AOC | ₹25.3 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹25.7 L+₹38,336.60 (1.52%)Rejected-Finance | ₹25.7 L+₹38,336.60 (1.52%) | L2 | Rejected-Finance HIGHER THEN L1 BIDDER |
| 3 | L3₹27.1 L+₹1.8 L (6.97%)Rejected-Finance | ₹27.1 L+₹1.8 L (6.97%) | L3 | Rejected-Finance HIGHER THEN L1 BIDDER |
| 4 | Rejected-Technical | - | - | Rejected-Technical The firm has not compiled with the eligible category i.e. b(ii) |
| 5 | Rejected-Technical | - | - | Rejected-Technical The firm has not compiled with the eligible category i.e. b(ii) |
| Sl No | Description | Qty | Unit | GEETA CONSTRUCTION L2 | SANJAY KAUSHIK L1 | KAMLESH ENTERPRISE L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches in Soft / loose soil not exc. 1.5 mtr wide and n. exc. 1.50 m deep for laying of HT under ground cable and getting out including forming bottom surface to required level or slope, complete all as specified and directed. (The excavation should be carried out Manually and excavation considered for only DWC length / GI PIPE) | 291 | Cum | 376 ₹1,09,416 | 370 ₹1,07,670 Lowest | 390 ₹1,13,490 |
| 2.00 | Returning filling in hard/dense soil including spreading, levelling, watering and well ramming in layers not exceeding 25cm complete all as specified and as directed | 275.8 | Cum | 183 ₹50,471.4 | 180 ₹49,644 Lowest | 220 ₹60,676 |
| 3.00 | Removal of surplus excavated (soil) to a distance not exceeding 50 mtr and depositing where directed at a level not exceeding 1.50m above the starting point complete all as specified and as directed. | 15.2 | Cum | 416 ₹6,323.2 | 410 ₹6,232 Lowest | 425 ₹6,460 |
| 4.00 | M&L laying of GI pipe 80 mm bore, medium grade for passing through cables under the floor / road etc complete all as specified and directed. | 48 | RM | 1,370 ₹65,760 | 1,350 ₹64,800 Lowest | 1,500 ₹72,000 |
| 5.00 | Earthing complete with galvanized steel earth plate electrode 60 cm x 60 cm x 6.00 mm thick buried directly in ground [earth pit not less than 2.25 metre deep below normal ground level] with top edge of the plate electrode not less than 1.5 m below normal ground level, connected to including galvanised iron strip size 32 x 6 mm by means of bolts, nuts, and washers of galvanized iron or steel all as shown in electrical plate No. 3 of SSR Part I connected to earth test point including provision of earth strip protected by 40 mm dia light grade GI pipe & watering pipe shall be 20 mm bore medium grade GI pipe including all excavation and earth work in any type of strata, PCC pit with RCC cover, CI frame, char coal, salt & funnel etc complete all as specified or indicated including testing on completion. Rate to be considered for earth strip to be fixed 7.5 m long.all as specified and directed by Engr-in-charge. | 2 | Each Set | 13,195 ₹26,390 | 13,000 ₹26,000 | 10,000 ₹20,000 Lowest |
| 6.00 | Dismantling/Taking out of old Unsv HT cable of size 95 Sq mm from any location complete along with earth work manually with out damaging of the HT cable and making the surface good all as specified and directed by Engr in Charge.
Note: Earth work will be common for both removal an laying new cable in same route | 910 | RM | 56 ₹50,960 | 55 ₹50,050 Lowest | 60 ₹54,600 |
| 7.00 | Re laying, jointing, testing and commissioning existing healthy Span of HT XLPE cable cross sectional area of any size removed from above item and re laying in DWC pipe / ducts / trenches, under floor and road or fixed to wall etc complete all as specified and directed. | 240 | RM | 208 ₹49,920 | 205 ₹49,200 Lowest | 215 ₹51,600 |
| 8.00 | Supply, laying, jointing, testing and commissioning HT XLPE cable cross sectional area 95 Sqmm 3 core, 11000 volt screened, PVC bedded "Earthed grade" insulated bedded, galvanized steel (Heavy duty) strip armoured with aluminium conductor 11 KV pressure earth system conforming to IS-7098 (Part-I) 1977 and Part-II of 1985 laid in pipe / ducts / trenches, under floor and road or fixed to wall etc complete all as specified and directed.
Note: The length of one HT Cable Drum shall not less than 280 RM from the mentioned quantity | 910 | RM | 1,827 ₹16,62,570 | 1,800 ₹16,38,000 Lowest | 1,900 ₹17,29,000 |
| 9.00 | Supplyand laying DWC pipe SN-8 with coupler 75 mm OD,ISI marked along with all accessories like socket, bend, couplers etc. conforming to IS 14930, Part II complete with fitting and cutting, jointing etc. laid in trenches/ fixed to pole /laying under road crossing/fixed on pavement walls with clamps complete all as specified and as directed. | 1,076 | RM | 133 ₹1,43,108 | 131 ₹1,40,956 Lowest | 150 ₹1,61,400 |
| 10.00 | M&L in replacement of end terminal joints kits cold shrinkable suitable for HT 11000 V (Earthed), XLPE insulated armoured heavy duty under ground cable including joint kits complete for making joints suitable for aluminium conductor cable of cross sectiona larea 95 Sqmm, 3 core, complete all as specified and directed. | 8 | Each | 30,450 ₹2,43,600 | 30,000 ₹2,40,000 Lowest | 30,000 ₹2,40,000 Lowest |
Tender Value
₹22.3 L
EMD Value
₹46,600
Closing Date
16 May 2026, 6:00 pmClosed
CWE
HQ 136 WORKS ENGINEERS PIN - 914136 C/O 99 APO
SPL REPAIR/ REPLACEMENT/ REROUTING OF 11 KVA HT CABLE AT 2 K SUB STATION, 178 MH, 04 SUB STATIONS AND MEAT SHOP PHASE-II OF NEW CANTT UNDER GE GANGTOK
2026_MES_761552_1
CWE/136-WE/08 OF 2026-27
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Gangtok
Class E, Category b(ii)
8 documents required · 8 mandatory
₹500
Yes
GE Gangtok
₹46,600
Yes
27 Jul 2026
23 Apr 2026
18 May 2026
23 Apr 2026
16 May 2026
8 May 2026
23 Apr 2026 - 1 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Excavation in trenches in Soft / loose soil not exc. 1.5 mtr wide and n. exc. 1.50 m deep for laying of HT under ground cable and getting out including forming bottom surface to required level or slope, complete all as specified and directed. (The excavation should be carried out Manually and excavation considered for only DWC length / GI PIPE) | - | Cum | - | - |
| - | Returning filling in hard/dense soil including spreading, levelling, watering and well ramming in layers not exceeding 25cm complete all as specified and as directed | - | Cum | - | - |
| - | Removal of surplus excavated (soil) to a distance not exceeding 50 mtr and depositing where directed at a level not exceeding 1.50m above the starting point complete all as specified and as directed. | - | Cum | - | - |
| - | M&L laying of GI pipe 80 mm bore, medium grade for passing through cables under the floor / road etc complete all as specified and directed. | - | RM | - | - |
| - | Earthing complete with galvanized steel earth plate electrode 60 cm x 60 cm x 6.00 mm thick buried directly in ground [earth pit not less than 2.25 metre deep below normal ground level] with top edge of the plate electrode not less than 1.5 m below normal ground level, connected to including galvanised iron strip size 32 x 6 mm by means of bolts, nuts, and washers of galvanized iron or steel all as shown in electrical plate No. 3 of SSR Part I connected to earth test point including provision of earth strip protected by 40 mm dia light grade GI pipe & watering pipe shall be 20 mm bore medium grade GI pipe including all excavation and earth work in any type of strata, PCC pit with RCC cover, CI frame, char coal, salt & funnel etc complete all as specified or indicated including testing on completion. Rate to be considered for earth strip to be fixed 7.5 m long.all as specified and directed by Engr-in-charge. | - | Each Set | - | - |
| - | Dismantling/Taking out of old Unsv HT cable of size 95 Sq mm from any location complete along with earth work manually with out damaging of the HT cable and making the surface good all as specified and directed by Engr in Charge.
Note: Earth work will be common for both removal an laying new cable in same route | - | RM | - | - |
| - | Re laying, jointing, testing and commissioning existing healthy Span of HT XLPE cable cross sectional area of any size removed from above item and re laying in DWC pipe / ducts / trenches, under floor and road or fixed to wall etc complete all as specified and directed. | - | RM | - | - |
| - | Supply, laying, jointing, testing and commissioning HT XLPE cable cross sectional area 95 Sqmm 3 core, 11000 volt screened, PVC bedded "Earthed grade" insulated bedded, galvanized steel (Heavy duty) strip armoured with aluminium conductor 11 KV pressure earth system conforming to IS-7098 (Part-I) 1977 and Part-II of 1985 laid in pipe / ducts / trenches, under floor and road or fixed to wall etc complete all as specified and directed.
Note: The length of one HT Cable Drum shall not less than 280 RM from the mentioned quantity | - | RM | - | - |
| - | Supplyand laying DWC pipe SN-8 with coupler 75 mm OD,ISI marked along with all accessories like socket, bend, couplers etc. conforming to IS 14930, Part II complete with fitting and cutting, jointing etc. laid in trenches/ fixed to pole /laying under road crossing/fixed on pavement walls with clamps complete all as specified and as directed. | - | RM | - | - |
| - | M&L in replacement of end terminal joints kits cold shrinkable suitable for HT 11000 V (Earthed), XLPE insulated armoured heavy duty under ground cable including joint kits complete for making joints suitable for aluminium conductor cable of cross sectiona larea 95 Sqmm, 3 core, complete all as specified and directed. | - | Each | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_853054.xls
BOQ • 0.23 MB
PDFTENDERDOCUS.pdf
Tender Documents • 1.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .