Loading…
Loading…
Tender Value
₹98.0 L
EMD Value
₹2.0 L
Closing Date
24 Aug 2026, 11:00 amDue tomorrow
Executive Engineer Chamba Division HPPWD., Chamba
Executive Engineer Chamba Division HPPWD., Chamba
Land slide Mitigation Measures for prevention of land slide Disaster on Pucc-Tala Ghar on Link road to Chamba Town to Baloo under Chamba Division (SH Providing Shot Creting at Rd. 0/0 to 0/61.42)
2026_PWD_141326_1
NO. WA-IIContract/2026-27-16118-77 Dated 13.8.26
Open Tender
Civil Works
Percentage
90 days
Chamba
Please refer Tender documents.
12 documents required · 12 mandatory
₹2,000
₹2.0 L
17 Aug 2026
17 Aug 2026
24 Aug 2026
17 Aug 2026
24 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Surfacing dressing of the ground including removing vegetation and in equalities and disposal of rubbish material up to any lead and lift or as directed by the engineer -in-charge including carriage of material with in all leads ,lifts and other incidental. Any loss to the public /private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be compensated by him in all cases . The rate including octroi , royality , malkhana , toll tax , GST or any other taxes imposed by the Government . | 2,150 | Per Square Metre | 23.5 | ₹50,525 |
| 2.01 | Providing and fixing 25 mm dia (twenty five millimetre diameter ) soil nails of Fe 550-D grade steel 2.50 mtr. (two point zero metre ) long @75 cm (at the rate seventy five centimetre ) centre to centre both ways inserted with necessary equipment including all accessories and all leads and lift or as directed by Engineer -in -charge. Any loss to the public /private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be compensated by him in all cases . The rate including octroi , royality , malkhana , toll tax , GST or any other taxes imposed by the Government . | 36,794.1 | Per Kilogram | 94.56 | ₹34,79,250.1 |
| 3.01 | Providing and fixing G.I. wooven mesh of 100x 100 (one hundred onto one hundred millimetre )size with 4 mm (four millimetre) diametre wire fixed to necessary anchoring bolts complete as directed by the Engineer -in -charge , including carriage of material within all leads , lifts and other incidental. Any loss to the public /private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be compensated by him in all cases . The rate including octroi,royality , malkhana , toll tax , GST or any other taxes imposed by the Government . | 2,150 | Per Square Metre | 319.7 | ₹6,87,355 |
| 4.01 | Providing & applying 100 mm ( one hundred millimetre) thick Shotcrete in layers with approved design mix concrete M-25 ( M-twenty five) and cement contents not less than 360kg /cum with minimum characteristic compressive strength as per approved design mix (with excluding portland cement , coarse sand and graded stone aggregate of 10mm maximum size in proportion as per design criteria including the cost of centering and shuttering at edges and crones etcetera as directed by the Engineer -in -charge Any loss to the public /private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be compensated by him in all cases . The rate including octroi , royality , malkhana , toll tax , GST or any other taxes imposed by the Government . | 2,150 | Per Square Metre | 2,440.1 | ₹52,46,215 |
| 5.01 | Providing weapholes in brick masonry / stone masonry /plain reinforced concrete abutment, wing wall, return wall with 50 mm (fifty millimetre) dia PVC pipe extending through the full with of the structures with with slope of 1 (V) : 20 (H) (one vertical is to twenty horizontal ) towards draining face complete as per drawings and MORD technical specifications section 700, 1200 or as directed by the Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidental. The rate is including octroi, royality ,Malkana, toll tax, GST or any other taxes imposed by the Government . | 2,150 | Each | 155 | ₹3,33,250 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_209753.xls
BOQ • 0.31 MB
Biddocument.pdf
Tender Documents • 4.96 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].