Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.1 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹13.4 L+₹25,750 (1.96%)Rejected-AOC | L2 | Rejected-AOC Rejected |
Tender Value
₹12 L
EMD Value
₹24,000
Closing Date
5 Oct 2021, 6:00 pmClosed
GE (AF) AF Srinagar
Military Engineer Services Garrison Engineer (AF) Srinagar Air Force Station Srinagar-190007
COMLETION OF LEFT OVER WORK FOR PROVN OF PORTA CABIN AT 13 END OF RUNWAY AT AIR FORCE STATION SRINAGAR
2021_MES_446525_2
GE (AF) - 15/2021-22
Open Tender
Civil Works
Lump-sum
180 days
GE (AF) SRINAGAR
As per tender Documents
10 documents required · 10 mandatory
₹500
GE (AF) SRINAGAR
₹24,000
Yes
9 Dec 2021
9 Jul 2021
6 Oct 2021
9 Jul 2021
5 Oct 2021
22 Sept 2021
Amount
Sch 'A' Part I (Building Work)
Completion of Left over of prefabricated shelter single storey including foundation , earthwork PUF insulated panel walls, PUF insulated partition, PUF insulated ceiling, galvalume sheet roofing, steel columns, pedestals, trusses, etc alongwith sanitary annexe complete as per Drg No GEAF/WD-122/2015 Sh 1/2 to 3/3 all as specified and as shown on drawings and directed by Engineer in Charge
[Note: (i)Datails of left over work is attached as per Annexure 1(A) (ii) Contractor shall visit Bldg at site before quoting rate. (iii) Approx qty for left over work of Bldg is given in Annexure 1(A) . Which shall be varified before quoting lumpsum of Bldg. (iv) Rectification in Bldg if any required shall be responsibility of the contractor and the lumpsum quoted shall interlia include this provision and nothing extra shall be admissible. (v) Annexure '1(A) ' Showing list of balance work is for quidance only. The Lumpsum quoted shall included for all the items required for compeletion of work all as specified and shown on drawing.
Sch 'A' Part II (Earthwork and excavation) Note: Prepriced at par with SSR 2010 Part II at Serial Page No 16 and contractor has to quote the estimated amount under Col 6
Sch 'A' Part III Section A (Internal Electrification) Note: Prepriced at par with SSR 2010 Part II at Serial Page No 19 and contractor has to quote the estimated amount under Col 6
Sch 'A' Part III Section B (Internal Electrification) Note: To be quoted by the contractor
MCB single pole neutral ISI marked conforming to `C' Series for incoming & outgoing connection of 6 to 32 Amp 240V 10KA breaking capacity complete all as specified and directed by Engineer-in-charge
MCB single pole neutral ISI marked conforming to `C' Series for incoming & outgoing connection of 40 to 63 Amp 240V 10KA breaking capacity complete all as specified and directed by Engineer-in-charge
Endura Flat Panel Ultra Sim (Edge-Lit) 1x36Watt LED, 6K edge-lit luminaire with 1x36W LED lamp including all its accessories suitable for armstrong/grid ceiling complete all as specified and directed by Engineer-in-Charge Make: Havells Cat Part No LHEWEBP7PL2W036 or equivalent in Philips/Surya
`CRYPTON DD SERIES FP-L' street/bldg security light fitting with deep drawn housing suitble for single FP-L lamp 1 x 36 Watt HF(MS) with 1 x 36 Watt FPL lamp including suitble size of GI bracket, MS clamps, nuts and bolts complete all as specified and directed by Engr-in-Charge Make: Havells Cat Part No LHRC01136025 or equivalent in PHILIPS/BAJAJ
Ceiling fan complete accessories 230 V single phase 1200mm sweep complete all as specified and directed by Engineer-in-Charge
Exhaust fans AC, Single phase, 230/240 V of size 230mm sweep 1400 RPM with louvre and necessary fixing arrangement complete including making necessary hole in the wall and making good the disturbed surfaces complete all as specified and directed by Engineer-in-Charge
Sch 'A' Part IV (Internal Water Supply) Note: Prepriced at par with SSR 2010 Part II at Serial Page No 21 and contractor has to quote the estimated amount under Col 6
Sch 'A' Part V (Hot Water Supply) Note: To be quoted by the contractor
supply and installation water heater storage type, electric, 25 litrs capacity with and including hot and cold water PVC connection pipe complete all as specified and directed by Engineeer-in-Charge
Sch 'A' Part VI (External Watersupply) Note: Prepriced at par with SSR 2010 Part II at Serial Page No 22 and contractor has to quote the estimated amount under Col 6
Sch 'A' Part VII (External Electric Supply) Note: Prepriced at par with SSR 2010 Part II at Serial Page No 23 and contractor has to quote the estimated amount under Col 6
Sch 'A' Part VIII (Sewage Disposal) Note: Prepriced at par with SSR 2010 Part II at Serial Page No 25 and contractor has to quote the estimated amount under Col 6
M/S GHULAM HASSAN AND SONS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .