Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.8 LAdmitted-Fee/PreQual/Technical/Finance | -31.01% | ₹13.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹14.0 L+₹23,185.18 (1.68%)Admitted-Fee/PreQual/Technical/Finance | -29.85% | ₹14.0 L+₹23,185.18 (1.68%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹14.4 L+₹57,962.96 (4.20%)Admitted-Fee/PreQual/Technical/Finance D 502 SHIVILOK COLONY RAIPUR ROAD DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | -28.11% | ₹14.4 L+₹57,962.96 (4.20%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹15.0 L+₹1.2 L (8.74%)Admitted-Fee/PreQual/Technical/Finance | -24.98% | ₹15.0 L+₹1.2 L (8.74%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹15.2 L+₹1.4 L (10.2%)Admitted-Fee/PreQual/Technical/Finance | -23.99% | ₹15.2 L+₹1.4 L (10.2%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹20.0 L
EMD Value
₹39,980
Closing Date
23 Mar 2026, 6:00 pmClosed
EE WR Division Jaipur
EE WR Division Jaipur, Station road Jaipur
Repair and Renovation of Chainpura talab, Teh-Phulera, Dist. Jaipur
2026_WRDAS_544795_1
EE/15/2025-26
Open Tender
Civil Works
Percentage
180 days
Chainpura Talab
Please refer tender document
3 documents required · 3 mandatory
₹1,000
As per NIT
₹39,980
Yes
25 Mar 2026
10 Mar 2026
24 Mar 2026
10 Mar 2026
23 Mar 2026
10 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Julicflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Thick | 25,830 | sqm | 2.5 | ₹64,575 |
| 2 | Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 95% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect.16(b)(With lead beyond 250 m and up to 750 m (½ Km). 16(c)Add extra for each subsequent lead of 500m or part there of beyond ½ Km and upto 1.5km. 17(a) Deduct in item no 16 (a) to (d) above if Standard Proctor's density to be achived is at least 95% | 7,194.6 | cum | 153.75 | ₹11,06,169.75 |
| 3 | Watering of earth including cost of carriage of water when source of water is up to 1 Km for per cum | 7,194.6 | Cum | 12.6 | ₹90,651.96 |
| 4 | Compaction of earth or highly weathered strata By mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor / vibro sheep foot compactor required as per site condition to obtain dry density of.(ii) at least 95% of Standard Proctor's density | 7,194.6 | Cum | 39 | ₹2,80,589.4 |
| 5 | Suppying and Laying Quarry spalls properly graded but not more than 10 cm in Size With Spreading in required profile including all lead and lift. | 492 | Cum | 815 | ₹4,00,980 |
| 6 | Making standard type cement gauge including engraving letters and painting including scaffolding etc. | 2.43 | RM | 550 | ₹1,336.5 |
| 7 | Painting standard type gauge with black, red and white un-washable paints including cost of material | 2.43 | RM | 210 | ₹510.3 |
| 8 | Providing and laying cement concrete coping in (1:2:4) with maximumsize of crusher broken aggregate upto 20 mm including shuttering etc. with all leads of material complete inall respect in thickness of : 75mm. | 24 | sqm | 480 | ₹11,520 |
| 9 | Plaster in cement sand mortar 1:4 including racking of joints, smooth finishing & curing etc. complete including all leads of all construction materials of thickness : 20mm | 135 | sqm | 314 | ₹42,390 |
stage.html
html • 0.03 MB
finance_971798.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
FinancialBidChainpura.pdf
Tender Documents • 1.60 MB
BOQ_971798.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .