Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical H 11 HOUSING BOARD UNIT MADHAYANKUTTAI PO METTUR DAM 52 | METTUR DAM | SALEM | TAMIL NADU | Accepted-Technical Technical Bid satisfied |
| 2 | Accepted-Technical M 18 HOUSING BOARD UNIT MADAYANKUTTAI POST METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | Accepted-Technical Technical Bid satisfied |
Tender Value
Refer Docs
EMD Value
₹8,200
Closing Date
24 Feb 2026, 4:00 pmClosed
CE/ MTPS2
O/o.CE/ MTPS2
OT 237 ID Fan B
2026_EB_663792_1
OT 237 ID Fan B
Open Tender
Maintenance Works
Works
15 days
MTPS2
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹8,200
Yes
21 May 2026
21 Feb 2026
24 Feb 2026
21 Feb 2026
24 Feb 2026
21 Feb 2026
Removal of insulation Single layer (60mm thick) wool mattress, G.I Cladding sheet, stiffeners, retainer plates etc. welding the support plates, rectification and refixing the existing insulation Single layer (60mm thick) wool mattress, GI sheets, lead and lift etc in the required area of ID Fan 'B' with new fastners.
Opening manhole doors, Removing impeller casing, intermediate casing and shaft top cover, coupling, Intermediate shaft, pressure plate, sealing ring and Bearing cap etc in ID Fan 'B' after adjusting the coupling for providing axial gap for dismantling intermediate torque transmission shaft.
Dismantling of the fan impeller from rotor shaft by using special tools and tackles.
Dismantling the Bearing cooling air pipe lines, Bearing Grease line, Conical Piece, Spool piece, Bearing cap, Bearing enclosure and Bearing Housing from the casing.
Removing the Shaft Sleeve, Bearing Top Cover, Cylindrical, Roller bearing and single row angular contact ball bearing from the bearing housing.
Cleaning the rotor shaft, Roller bearing, Ball bearing, Impeller, Bearing Housing, Intermediate torque transmission shaft, Pressure plate, Bearing Cooling Air Pipe line, Bearing Grease line, Conical Piece, Spool Piece, Bearing Cap, Bearing Enclosure, Shaft Sleeve, bearing top Cover and Couplings.
Assembling the single row angular contact ball bearing and cylindrical roller bearing after checking the clearance bearing distance piece, Bearing Cap, Shaft Sleeve and Bearing alignment work after manual filling of grease in bearing housing and checking the clearance of bearing for its free rotation.
Fixing the Bearing cooling air pipe lines, Bearing Grease line, Conical Piece, Spool piece, Bearing cap, Bearing enclosure with Bearing Housing in non Drive End of ID Fan ‘B’.
Fixing the Bearing housing, Impeller, Pressure Plate, sealing ring, coupling, Intermediate shaft, Shaft cover and mounting the impeller casing and intermediate casing by using locating pins and fasteners.
Checking the alignment of coupling with the motor and conducting trial run complete in ID Fan 'B
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_796963.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .