Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.6 LAccepted-AOC 30 B 1 DEEN DAYAL NAGAR NAWABGANJ DEEN DAYAL NAGAR KANPUR NAGAR UTTAR PRADESH 208002 | KANPUR NAGAR | UTTAR PRADESH | 208002 | 1 | Accepted-AOC LOWEST RATE | |
| 2 | 2₹16.7 L+₹3.1 L (22.7%)Rejected-Finance | 2 | Rejected-Finance NOT LOWEST | |
| 3 | 3₹17.9 L+₹4.3 L (31.5%)Rejected-Finance | 3 | Rejected-Finance NOT LOWEST | |
| 4 | 4₹20.3 L+₹6.7 L (49.3%)Rejected-Finance | 4 | Rejected-Finance NOT LOWEST | |
| 5 | 5₹20.4 L+₹6.8 L (50.3%)Rejected-Finance | 5 | Rejected-Finance NOT LOWEST |
Tender Value
₹22.2 L
EMD Value
₹44,360
Closing Date
26 May 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE (AF) PALAM DELHI CANTT
GE (AF) PALAM DELHI CANTT-10
PERIODICAL SERVICES TO ROCK VIEW AT AF STATION PALAM UNDER GE (AF) PALAM DELHI CANTT-10
2022_MES_520659_1
GENP-12/2022-23
Open Tender
Civil Works
Item Rate
180 days
GE (AF) PALAM DELHI CANTT
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE (AF) PALAM
₹44,360
Yes
28 Apr 2023
28 Apr 2022
27 May 2022
28 Apr 2022
26 May 2022
13 May 2022
60 days
Amount
Taking down cement plaster on brick or concrete wall surfaces etc including raking out joints, hacking for key , scrubbing down with water etc and removing the debris from site to outside MoD land complete all as specified and directed
Demolition of brick work built in cement mortar incling all quoins, arches, pillars etc and removing the debris from site to outside MoD land complete all as specified and directed.
M&L for brick work with sub class "B" in cement moratar 1:6, straight or curved on plan exc 6 mtr mean radius complete all as specified and directed .
M&L for brick work with sub class "B" brick in cement moartar 1:4 straight or curved on plan to any redius in half brick thick wall.
M&L for 10 mm thick rendering in cement mortar 1:6 on fair faces of brick work or concrete surfaces including finishing even and smooth surface without using extra cement.
M&L for 15 mm thick cement plaster in two layers i.e,first layer 10mm thick in CM 1:4 and second layer 5mm thick in CM 1:4 using water proofing compound by weight as per manufacturer's instructions on fair faces of brick work or concrete surfaces including finishing even and smooth surface without using extra cement. (NOTE: WPC shall be measured & paid separately as supply only).
M&L for 10 mm thick cement plater in cement mortar 1:3 in ceiling including finishing even and smooth surface without using extra cement.
Supply only liquid water proofing compound (ISI marked) all as directed. Make : Pidilite (Dr Fixit LW +, Dr Fixit) or its equivalent in Fosroc/ Choksey.
M&L for preparation of newly plastered surfaces of walls and applying two coats of oil bound distemper over a coat of primer using roller including necessary scaffolding etc all as specified and directed.
M&L for preparation of newly plastered surfaces of ceiling and applying two coats oil bound distemper over a coat of primer using roller including necessary scaffolding all as specified and directed.
M&L for preparation of newly plastered surface of external wall and and applying Premium Acrylic Smooth exterior paint with Silicone additives of required shade (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) all as specified and as directed at site by Engineer -in Charge: (i) The newly plastered surface must be prepared in a manner so that there should not be any impression of dent and it should be made even all as per manufacture instruction before application of distemper. The cost of materials, labour & T&P required for preparation of surface are demand to be included in the rates quoted. (ii) The work must be got executed through authorised applicator of manufacture after concluding an MoU with manufacture for company bank gurantee by the contractor. The authorised applicator of manufacturer shall be got approved from GE/ AGE before commencement of work. (iii) All the material to be incorporated in the work shall be brought by contractor to MES store yard which will be subsequently issued by department for incorporation in the work to ensure the quantity to be consumed all as per recommendation of manufacture. (iv) After carrying out preparation of surface the same shall be got approved from GE/ AGE before application of distemper for each building. (v) The colour/ shade will be all as approved by GE/ AGE. (vi) The cost of Scaffolding wherever required are deemed to be included in the rates quoted by the contractor.
M&L for complete removal of old decorated surface of external walls and applying two coats of distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 gms/litre, of approved manufacturer, of required shade and colour complete, as per manufacturer's specification including priming coat of exterior primer over plaster of paris putty of 1 mm thickness over plastered surface to prepare the surface even and smooth all as specified and as directed at site by Engineer -in Charge: (i) The newly plastered surface must be prepared in a manner so that there should not be any impression of dent and it should be made even all as per manufacture instruction before application of distemper. The cost of materials, labour & T&P required for preparation of surface are demand to be included in the rates quoted. (ii) The work must be got executed through authorised applicator of manufacture after concluding an MoU with manufacture for company bank gurantee by the contractor. The authorised applicator of manufacturer shall be got approved from GE/ AGE before commencement of work. (iii) All the material to be incorporated in the work shall be brought by contractor to MES store yard which will be subsequently issued by department for incorporation in the work to ensure the quantity to be consumed all as per recommendation of manufacture. (iv) After carrying out preparation of surface the same shall be got approved from GE/ AGE before application of distemper for each building. (v) The colour/ shade will be all as approved by GE/ AGE. (vi) The cost of Scaffolding wherever required are deemed to be included in the rates quoted by the contractor.
M&L for preparation of old decorated surfacesof ceiling and applying two coats of oil bound distemper 1st quality of approved manufacturer, of required shade and colour as per manufacturer's specification including priming coat all as specified and as directed at site by Engineer -in Charge:
M&L for preparation of old decorated surface of exterior wall by removing existing treatment with mechanical sander (RPM 1500-2700) along with internal dust extraction system for clean environment certified by reputed paint manufacturers, then washing the surface with Bleaching powder solution for treatment of fungal growth and applying two coats of exterior anti fungal acrylic emulsion paint (Wallmista of Berger paint or equivalent in Asian paint, Nerolac etc having three years of performance warranty) over a coat of exterior water based primer of same make all as specified and prescribed by manufacturer of paint and as directed by Engineer-in-Charge. (i) The old surface must be prepared in a manner so that there should not be any impression of dent and it should be made even all as per manufacturer;s instruction before application of paint. The cost of materials, labour & T&P required for preparation of surface are deemed to be included in the quoted rates. (ii) The work must be got executed through authorised applicator of manufacturer after concluding an MoU with manufacturer with gurantee by the contractor. The authorised applicator of manufacturer shall be got approved from GE before commencement of work. (iii) All the material to be incorporated in the work shall be brought by contractor to MES store yard which will be subsequently issued by department for incorporation in the work to ensure the quantity to be consumed all as per recommendation of manufacturer. (iv) After carrying out preparation of surface the same shall be got approved from GE before application of paint for each building. (v) The colour/ shade will be all as approved by GE/ AGE. (vi) The cost of Scaffolding wherever required are deemed to be included in the rates quoted by the contractor.
M&L for preparation of old wood and wood based surfaces of any description not otherwise described over 10 cms width or girth by removing old paint by paint removers,cleaning with scrapers etc and applying two coats of synthetic enamel paint (any tint) of first quality complete all as specified and directed.
M&L for preparation of old steel and iron based surfaces of any description not otherwise described over 10 cms width or girth by removing old paint by paint removers,cleaning with scrapers etc and applying two coats of synthetic enamel paint (any tint) of first quality complete all as specified and directed.
M&L for complete removal of old decorated surface of walls including necessary scaffolding etc and applying two coats of cement base paint all as specified and directed by Engineer -in- Charge
M&L for preparation of old treated concrete or plastered surface ( plain/kerb stone moulded) not exc10cm width or girth by cleaning, brushing etc and applying one coat of synthetic enamelpaint all as specified and as directed by Engineer-in-Charge. Notes for item No 1 to 18 : (a) The contractor shall remove debris /retrieved material of bldg from site to outsite MoD land. The Qtr shall be neat and tidy after satisfactory maint in all respect faling which a panel recovery at rate of Rs 2000/- per Qtr shall be made from the contractor's due. (b) The Qtr in which maint to be carried out shall be completed within 10 days after handing over said Qtrs to contractor or as directed by Engr-in-charge faling which a panel recovery at rate of Rs 500/- per day for delay shall be made from the contractor's due.. (c) The tint or spot of paint, distemper, white wash etc. on furniture articles and similar items shall be clened in all respect faling which a panel recovery at rate of Rs 500/- per day shall be made from the contractor's due. (d) The contractor shall submit daily report of manpower, material and T&P deployed at site to Engr-in-charge as per CPM chart approved by GE. The quoted rates shall deemed to be included in the items mentioned above and nothing extra shall be paid on account of above provisions.
M/S VERMA BUILDER
SHEELSONS ENTERPRISES
DEV CONSTRUCTION
ASHUTOSH BUILDERS
High Tech Metal India
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .