| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.3 LAccepted-AOC | ₹46.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹48.4 LRejected-Finance BHADOHI | UTTAR PRADESH | 221301 | ₹48.4 L | L2 | Rejected-Finance L2 |
| 3 | L3₹50.5 LRejected-Finance | ₹50.5 L | L3 | Rejected-Finance L3 |
| 4 | L4₹57.7 LRejected-Finance | ₹57.7 L | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical Calcel |
| Sl No | Description | Qty | Unit | M/S KAMLA COMNUCATION L2 | M/S RAM ASAREY PATEL L1 | M/s RAJA CONSTRUCTION L4 | M/S GUFRAN CONSTRUCTION L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavaion of foundation in ordinary soil/sandy loam, clay or sand including lift up to 1.50 m and lead up to 30M including filling, watering, ramming of excavated eart into the foundation trenches or plinth or upto the place directed by Engineer in Charge. | 1,202.54 | M3 | 51.4 ₹61,810.56 | 60 ₹72,152.40 | 93.8 ₹1.1 L | 79 ₹95,000.66 |
| 2.00 | Providing and Laying LDPE Film 200 Micron below in C.C. invluding cost of all material, labour and T&P etc. for proper completion of work. | 2,583.44 | M2 | 22.6 ₹58,385.74 | 20 ₹51,668.80 | 35.08 ₹90,627.08 | 15 ₹38,751.60 |
| 3.00 | Laying .C.C.(1:3:6) with cement, coarse sand of F.M. more than 2 and ballast 20 mm to 40 mm in size in foundation including cost of all material, labour, T&P etc. complete in all respects. | 286.16 | M3 | 1,800 ₹5.2 L | 3,000 ₹8.6 L | 3,819.7 ₹10.9 L | 2,800 ₹8.0 L |
| 4.00 | C.R.Stone masonry in 1:3 with cement, coarse sand of f.M. more than 2.0 and 200xx200x150 mm size stone oulder including cost of all material for proper completion of work. | 821.29 | M3 | 4,150 ₹34.1 L | 3,100 ₹25.5 L | 4,110.21 ₹33.8 L | 3,600 ₹29.6 L |
| 5.00 | Deep struck cement pointing in 1:2 cement, sand mortar on stone masonry including cost of all materials labour T&P etc. required for praper for completion of work. | 2,111.05 | M2 | 93 ₹2.0 L | 120 ₹2.5 L | 124 ₹2.6 L | 148 ₹3.1 L |
| 6.00 | Centering and shuttering for R.C.C work including cost of all material, labour, T&P etc. required for proper completion of work. | 233.17 | M2 | 300 ₹69,951 | 500 ₹1.2 L | 619.75 ₹1.4 L | 400 ₹93,268 |
| 7.00 | Providing and laying R.C.C.(1:1.5:3) with coarse sand cement and 10 mm to 20 mm crushed stone grite including cost of material,labour, T&P. etc. for proper completion of work as directed by Engineer- in- charge. | 50.77 | M3 | 5,200 ₹2.6 L | 7,000 ₹3.6 L | 7,059.25 ₹3.6 L | 7,800 ₹4.0 L |
| 8.00 | Reinforcement of RCC work including cost of steel, cutting, bending, placing in position & binding with binding wire including cost of all material, labour and T&P etc. required for
proper completion of work. | 4 | MT | 41,500 ₹1.7 L | 65,000 ₹2.6 L | 54,812 ₹2.2 L | 68,000 ₹2.7 L |
| 9.00 | Stone pitching on V.R.B. approach ramp including including cost of material,labour, T&P. etc. for proper completion of work. | 24 | M3 | 1,500 ₹36,000 | 1,700 ₹40,800 | 1,884.45 ₹45,226.80 | 600 ₹14,400 |
| 10.00 | Colour washing with two coat including cost of all materials,labour and T&P etc. complete
in all respects. | 607.04 | M2 | 86 ₹52,205.44 | 100 ₹60,704 | 98.83 ₹59,993.76 | 98 ₹59,489.92 |
Tender Value
₹68.9 L
EMD Value
₹1.4 L
Closing Date
18 Mar 2026, 3:00 pmClosed
SE
SE IRRIIGATION WORK CIRCLE PRAYAGRAJ
Restoration and Pucca work of Ramnagar Dy. And its offtaking minors from Km. 8.700 to Km. 14.310
2026_UPIDC_1124343_11
07/SE/2025-26
Open Tender
Civil Works
240 days
Ramnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹1.4 L
Yes
SE IRRIIGATION WORK CIRCLE PRAYAGRAJ
25 May 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
12 Mar 2026
Earth work in excavaion of foundation in ordinary soil/sandy loam, clay or sand including lift up to 1.50 m and lead up to 30M including filling, watering, ramming of excavated eart into the foundation trenches or plinth or upto the place directed by Engineer in Charge.
Providing and Laying LDPE Film 200 Micron below in C.C. invluding cost of all material, labour and T&P etc. for proper completion of work.
Laying .C.C.(1:3:6) with cement, coarse sand of F.M. more than 2 and ballast 20 mm to 40 mm in size in foundation including cost of all material, labour, T&P etc. complete in all respects.
C.R.Stone masonry in 1:3 with cement, coarse sand of f.M. more than 2.0 and 200xx200x150 mm size stone oulder including cost of all material for proper completion of work.
Deep struck cement pointing in 1:2 cement, sand mortar on stone masonry including cost of all materials labour T&P etc. required for praper for completion of work.
Centering and shuttering for R.C.C work including cost of all material, labour, T&P etc. required for proper completion of work.
Providing and laying R.C.C.(1:1.5:3) with coarse sand cement and 10 mm to 20 mm crushed stone grite including cost of material,labour, T&P. etc. for proper completion of work as directed by Engineer- in- charge.
Reinforcement of RCC work including cost of steel, cutting, bending, placing in position & binding with binding wire including cost of all material, labour and T&P etc. required for proper completion of work.
Stone pitching on V.R.B. approach ramp including including cost of material,labour, T&P. etc. for proper completion of work.
Colour washing with two coat including cost of all materials,labour and T&P etc. complete in all respects.
Fixing wheel guard stone inclding cost of all materials, labours and T&P etc. complete in all respects.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
belanDOC.pdf
Tender Documents • 2.60 MB
BOQ_2095343.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid