Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹53.3 LAccepted-AOC | ₹53.3 L | 1st | Accepted-AOC 1ST LOWEST |
| 2 | 2nd₹55.8 L+₹2.5 L (4.64%)Rejected-AOC | ₹55.8 L+₹2.5 L (4.64%) | 2nd | Rejected-AOC 2ND LOWEST |
| 3 | 3rd₹58.5 L+₹5.2 L (9.66%)Rejected-AOC | ₹58.5 L+₹5.2 L (9.66%) | 3rd | Rejected-AOC 3RD LOWEST |
| 4 | 4th₹59.1 L+₹5.7 L (10.8%)Rejected-AOC | ₹59.1 L+₹5.7 L (10.8%) | 4th | Rejected-AOC 4TH LOWEST |
| 5 | 5th₹59.6 L+₹6.3 L (11.7%)Rejected-AOC | ₹59.6 L+₹6.3 L (11.7%) | 5th | Rejected-AOC 5TH LOWEST |
Tender Value
Refer Docs
EMD Value
₹75,000
Closing Date
28 Nov 2020, 5:00 pmClosed
executive engineer
executive engineer division office ujjain
PROPOSED ENTRANCE GATE AND OTHER DEVELOPMENT WORKS AT GOVERNMENT POLYTECHNIC COLLEGE, UJJAIN
2020_MPHID_114413_1
1
Open Tender
Construction Works
Percentage
270 days
ujjain
Please refer Tender documents.
8 documents required · 8 mandatory
₹11,800
₹75,000
18 Jan 2021
13 Nov 2020
2 Dec 2020
14 Nov 2020
28 Nov 2020
14 Nov 2020
eProcurement System Government of Madhya Pradesh Created By: Ramchandra Pawar Created Date/Time: 04-Dec-2020 03:05 PM Tender Title: PROPOSED ENTRANCE GATE AND OTHER DEVELOPMENT WORKS AT GOVERNMENT POLYTECHNIC COLLEGE, UJJAIN Tender ID: 2020_MPHID_114413_1
Tender Inviting Authority:
Name of Work: PROPOSED ENTRANCE GATE AND OTHER DEVELOPMENT WORKS AT GOVERNMENT POLYTECHNIC COLLEGE, UJJAIN
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 SANJAY SHARMA(GSTN-23AGDPS8187R1ZF) 7499000.000 -17.370 6196423.700 Sixty One Lakh Ninty Six Thousand Four Hundred and Twenty Three
2.00 HEMANT JOSHI AND ASSOCIATES(GSTN-23ARHPJ0781H1ZY) 7499000.000 -21.990 5849969.900 Fifty Eight Lakh Fourty Nine Thousand Nine Hundred and Sixty Nine
3.00 SANJAY JAIN(GSTN-23ACZPJ2594F1Z8) 7499000.000 -20.210 5983452.100 Fifty Nine Lakh Eighty Three Thousand Four Hundred and Fifty Two
4.00 MUSKAN CONSTRUCTIONS(GSTN-23DKYPP6633P1Z2) 7499000.000 -20.510 5960955.100 Fifty Nine Lakh Sixty Thousand Nine Hundred and Fifty Five
5.00 RAHIJEET BUILDERS AND DEVELOPERS PRIVATE LITMITED(GSTN-23AAHCR7669E2Z4) 7499000.000 -28.860 5334788.600 Fifty Three Lakh Thirty Four Thousand Seven Hundred and Eighty Eight
6.00 kamlesh pagariya(GSTN-23ARAPP0985A1Z7) 7499000.000 -19.190 6059941.900 Sixty Lakh Fifty Nine Thousand Nine Hundred and Fourty One
7.00 Electro Power Transformers(GSTN-23AAWPT5394E1Z3) 7499000.000 -9.130 6814341.300 Sixty Eight Lakh Fourteen Thousand Three Hundred and Fourty One
8.00 SATYAM ELECTRICALS(GSTN-NA) 7499000.000 -25.560 5582255.600 Fifty Five Lakh Eighty Two Thousand Two Hundred and Fifty Five
9.00 Aadhar Enterprises(GSTN-NA) 7499000.000 -21.210 5908462.100 Fifty Nine Lakh Eight Thousand Four Hundred and Sixty Two
Lowest Amount Quoted BY: RAHIJEET BUILDERS AND DEVELOPERS PRIVATE LITMITED(5334788.600)
BOQ Summary Details Tender Title: PROPOSED ENTRANCE GATE AND OTHER DEVELOPMENT WORKS AT GOVERNMENT POLYTECHNIC COLLEGE, UJJAIN Tender ID: 2020_MPHID_114413_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 RAHIJEET BUILDERS AND DEVELOPERS PRIVATE LITMITED 5334788.600 L1
2 SATYAM ELECTRICALS 5582255.600 L2
3 HEMANT JOSHI AND ASSOCIATES 5849969.900 L3
4 Aadhar Enterprises 5908462.100 L4
5 MUSKAN CONSTRUCTIONS 5960955.100 L5
6 SANJAY JAIN 5983452.100 L6
7 kamlesh pagariya 6059941.900 L7
8 SANJAY SHARMA 6196423.700 L8
9 Electro Power Transformers 6814341.300 L9
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .