Tender Value
₹18.0 L
EMD Value
₹18,500
Closing Date
10 Aug 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development officer(VP)
PS park,Erode Block,Erode 638001
AGAMT - II Pitchandampalayam
2023_RDTN_354178_1
Roc No.1490/2023/B4 Dated 02.08.2023
Open Tender
Civil Works
Item Rate
180 days
PS park, Erode Block
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹18,500
EPS park,Erode Block,Erode 638001
10 Aug 2023
4 Aug 2023
10 Aug 2023
4 Aug 2023
10 Aug 2023
4 Aug 2023
7 Aug 2023
Amount
Earth work excavation and depositing on bank with initial lead of 10m including all cost and conveyance to site etc complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation including cost and conveyance of all materials to site and all
Cement concrete 1:3:6 mix using 20mm ISS metal including all cost and conveyance of all materials to site and all labour charges etc complete.
Plastering with CM 1:4 mix to 20 mm thick including cost and conveyance and all labour charges etc complete
Provision for culvert
Earth work excavation depositing on bank with initial lead and lift including all soils and all labour charges etc
Cement concrete 1:4:8 mix using 40mm ISS metal including all cost and conveyance of all materials to site and all labour charges etc complete.
Centering with steel shutters including cost and conveyance of all materials to site and all labour charges etc
Supply and Fabrication of Steel including cost and conveyance of all materials to site and all labour charges etc
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges.
Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS metal including all cost and conveyance of all materials to site and all labour charges etc complete.
Provision for information board
Earth work excavation and depositing on bank with initial lead of 10m including all cost and conveyance to site etc complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation including cost and conveyance of all materials to site and all
Cement concrete 1:3:6 mix using 20mm ISS metal including all cost and conveyance of all materials to site and all labour charges etc complete.
Plastering with CM 1:4 mix to 20 mm thick including cost and conveyance and all labour charges etc complete
Provision for information board
Earth work excavation and depositing on bank with initial lead of 10m including all cost and conveyance to site etc complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation including cost and conveyance of all materials to site and all
Cement concrete 1:3:6 mix using 20mm ISS metal including all cost and conveyance of all materials to site and all labour charges etc complete.
Plastering with CM 1:4 mix to 20 mm thick including cost and conveyance and all labour charges etc complete
Provision for Pythroid
Earth work excavation and depositing on bank with in initial lead of 10 m conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying and erecting centering shuttering including necessary supports for plane including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20 mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying and Filling the 40 mm jelly including cost and conveyance of all materials to site and all labour charges etc complete
Supplying and Filling the 20 mm jelly including cost and conveyance of all materials to site and all labour charges etc complete
Supplying and Filling the 12 mm Chips including cost and conveyance of all materials to site and all labour charges etc complete
Supplying and Filling the Red gravel including cost and conveyance of all materials to site and all labour charges etc complete
Supplying and Planting the Kalwalai plants including cost and conveyance of all materials to site and all labour charges etc complete ( for 0.25 sqm = 1 Plant)
Supplying and Fixing the PVC pipe 165 mm dia - 6 ksc including all labour charges etc., complete.
Provision for information board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
SRI PERIYANDICHIAMMAN CONSTRUCTIONS
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .