| 1 | L1₹60.1 LAccepted-AOC 17E COLLECTOR OFFICE ROAD VENKATHESAPURAM SUNDAR NAGAR EXTENSION NEAR DIC PERAMBALUR 621 212 | PERAMBALUR | TAMIL NADU | 621212 | L1 | Accepted-AOC LOW BUDGET | |
| 2 | L2₹63.0 L+₹2.9 L (4.78%)Rejected-AOC NO 888 TVS TOLLGATE TIRUCHIRAPPALLI 620 020 | TIRUCHIRAPPALLI | TAMIL NADU | 620020 | L2 | Rejected-AOC HIGH BUDGET |
Tender Value
₹72 L
EMD Value
₹72,000
Closing Date
16 Aug 2024, 3:00 pmClosed
THE EXECUTIVE OFFICER
THE EXECUTIVE OFFICER KURUMBALUR TOWN PANCHAYAT
Restoration of BT Road at Ward No. 12. North Street, Middle Street, Ward No. 14, Mariyamman Kovil street to Renganathapuram road and Ward No. 10 Perumal Kovil street in Kurumbalur Town Panchayat.
2024_DTP_471035_1
100 / 2024
Open Tender
Civil Works
Works
180 days
KURUMBALUR TOWN PANCHAYAT
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹72,000
Yes
19 Nov 2024
8 Aug 2024
16 Aug 2024
8 Aug 2024
16 Aug 2024
8 Aug 2024
Amount
Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for prparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cum of 26.50 – 13.20 mm Graded metal and 0.25 cum of 13.20 – 2.36 mm Grade metal and 0.23 cum of 2.36 mm & below with 53.20 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20–30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 505 of MORTH Rev-5
Providing and laying Bituminous Concrete to 40mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50-2.36mm and 0.26cum of 2.36 and below with 45.27 kgs of VG30 (60/70) and 5.03 kg of Shreddar Plastic) Waste for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30t on capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory/Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher/9mpaver finisher, Vibratory/Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Advance Patch works for making up the Undulation in the existing B. T Surface to all average Thickness of 50mm to 40mm IRC mm HBG Metal Premixed with the 44 kg of 80/100 Bitumen per cum of Metal including cost and conveyance of all materials to site stacking there to departmental metric gause for Pre- Measurement as directed by the departmental officer and including cost and conveyance of bitumen which will be supplied and procured by the Contractor wise self at his own cost including handling charge for the same at both ends, heating the bitumen premixing layer temping including all labour charges for patch work and line charge for Runing and fuel charges for all loads and plants completed. and all other incedental charges etc., Complete
Road Marking With Hot applied Thermoplastic compund With Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectoring glass beads @ 250gms Per Sqm area ,thickness of 2.5 mm exclusive of surface applied glass beads as per IRC : 35.The finished Surface to be level , uniform and free from streaks and holes.
PCV Enterprises (BID ID -1111567)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .