Loading…
Loading…
Tender Value
₹2.2 L
EMD Value
₹4,400
Closing Date
27 Aug 2026, 4:00 pm3d left
XEN REW Kathua
XEN REW Kathua
Constt. Of Chainlink fencing at Sheetla Mata Mandir Bhangia W.No. 8 Panchayat Gatti Block Bani
2026_RDPR_321597_25
e-NIT No.189/REW/K of 2026-27 Dated 20/08/2026 2nd call
Open Tender
Civil Works
Percentage
90 days
Bani
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹4,400
20 Aug 2026
20 Aug 2026
28 Aug 2026
20 Aug 2026
27 Aug 2026
20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth for 1 meter from cutting edge and disposal of surplus excavated earth as directed: | 9.9 | cum | 479.3 | ₹4,745.07 |
| 2 | P/L Cement Concrete in 1:5:10 mix with 40mm nominal size stone agg: | 3.3 | cum | 4,826.5 | ₹15,927.45 |
| 3 | P/L Cement Concrete in 1:3:6 mix with 20mm nominal size stone agg. | 7.92 | cum | 4,774.46 | ₹37,813.72 |
| 4 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete | 695 | KG | 120.8 | ₹83,956 |
| 5 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete Made of G.I. wire of dia 4 mm | 37.12 | sqm | 809.9 | ₹30,063.49 |
| 6 | Form work of Wall | 33 | sqm | 286.35 | ₹9,449.55 |
| 7 | Providing and fixing CIB of approved size as per the direction of engineer in charge including supply of materials ,carriages all complete job(painting and writing oly) | 1 | NO | 2,000 | ₹2,000 |
| 8 | Carriage of material with avg lead from source to site of worksand for 70 km by MT & 1.500 km by A.T | 5.34 | cum | 2,429.62 | ₹12,974.17 |
| 9 | Carriage of material with avg lead from source to site of workBAJRI for 70 km by MT & 1.500 km by A.T | 9.83 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.00 MB
BOQ_1074764.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].