Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAdmitted-Fee/PreQual/Technical/Finance | ₹7.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.2 LAdmitted-Fee/PreQual/Technical/Finance | ₹7.2 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | JAYAM CONSTRUCTION AND SUPPLIERS L1 | CSK Constructions L2 |
|---|---|---|---|---|---|
| 1.001.Construction of Waiting Shed to Burial Ground in Echangal H/O Echangal Panchayat. | |||||
| 2.00 | Earth Work Excavation and deposting on Bank With in initial Lead of 10m and Initial Lift of 2m in hard stiff clay, stiff black cotton hard red earth, earth mixed with small Sized bounlders and hard gravelly soil as Per SS 20B | 19.78 | cum | 200 ₹3,956 Lowest | 250 ₹4,945 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour Charges for mixing,laying and curing etc complete for 10 Cum | 4.88 | cum | 5,600 ₹27,328 Lowest | 5,769 ₹28,152.72 |
| 4.00Supplying And Erection of Steel Centering for Sides And Soffits Including Cost And Conveyance Of All Charges | |||||
| 5.00 | Below Ground Level | 45.22 | Sqm | 547 ₹24,735.34 | 400 ₹18,088 Lowest |
| 6.00 | Above Ground Level | 34.57 | Sqm | 1,000 ₹34,570 Lowest | 1,095 ₹37,854.15 |
| 7.00 | Brick work in cement Mortor 1:5 (One cement and five sand) using second class Bricks of size 23 x 11.5 x 7.5 cms for the following including mixing mortar and all other labour charges etc complete. | 16.67 | cum | 6,100 ₹1,01,687 Lowest | 6,152 ₹1,02,553.84 |
| 8.00 | R.C.C. 1:1.5:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete | 13.8 | cum | 9,500 ₹1,31,100 | 9,491 ₹1,30,975.8 Lowest |
| 9.00 | Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor. | 0.63 | MT | 91,700 ₹58,101.12 Lowest | 91,858 ₹58,201.23 |
| 10.00 | Plastering with cement mortar 1:3 mix to 10 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm | 6.08 | Sqm | 328 ₹1,994.24 Lowest | 350 ₹2,128 |
Tender Value
Refer Docs
EMD Value
₹14,460
Closing Date
12 Aug 2026, 3:00 pmClosed
The Block Development officer (BP) Alangayam
The Block Development officer (BP) Alangayam
Tirupathur District SFC 2026-27 Construction of waiting room in the cemetery area in Eichangal Village Echangal Panchayat Alangayam Block Package No.11
2026_RDTN_688846_1
A3/1779/2026
Open Tender
Civil Works
Item Wise
180 days
Alangayam block
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹14,460
13 Aug 2026
27 Jul 2026
12 Aug 2026
27 Jul 2026
12 Aug 2026
27 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1.Construction of Waiting Shed to Burial Ground in Echangal H/O Echangal Panchayat. | - | - | - | - |
| 2 | Earth Work Excavation and deposting on Bank With in initial Lead of 10m and Initial Lift of 2m in hard stiff clay, stiff black cotton hard red earth, earth mixed with small Sized bounlders and hard gravelly soil as Per SS 20B | 19.78 | cum | - | - |
| 3 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour Charges for mixing,laying and curing etc complete for 10 Cum | 4.88 | cum | - | - |
| 4 | Supplying And Erection of Steel Centering for Sides And Soffits Including Cost And Conveyance Of All Charges | - | - | - | - |
| 5 | Below Ground Level | 45.22 | Sqm | - | - |
| 6 | Above Ground Level | 34.57 | Sqm | - | - |
| 7 | Brick work in cement Mortor 1:5 (One cement and five sand) using second class Bricks of size 23 x 11.5 x 7.5 cms for the following including mixing mortar and all other labour charges etc complete. | 16.67 | cum | - | - |
| 8 | R.C.C. 1:1.5:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete | 13.8 | cum | - | - |
| 9 | Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor. | 0.4 | MT | - | - |
| 10 | Plastering with cement mortar 1:3 mix to 10 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm | 6.08 | Sqm | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
Tendernotice_2.pdf
PDF • 0.80 MB
BOQ_828046.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].