Tender Value
₹16.7 Cr
EMD Value
₹9.9 L
Closing Date
2 Feb 2026, 11:00 amClosed
MAS-GDR Section: Replacement of existing corroded steel girders with pre- stressed concrete slabs and jacketing of sub-structure of Br No 177 up & Down Lines at Km - 84/6-12.
MAS02OF26007E~SR
MAS02OF26007E
Open
Works - General
9 Months
Chennai, Tamil Nadu
₹0
₹9.9 L
2 Feb 2026
9 Jan 2026
19 Jan 2026
A-List of items of work that are covered under Southern Railway Unified
B-List of items of work that are not covered under Southern Railway
(a) Transporting of 60 kg new PSC track sleepers , from Tiruvallam or any other concrete sleeper depot / nominated location in MAS division by road or any other means to the site 1 of work duly collecting the same from depot leading by contractor on road vehicle such as tractor/ trailor by road to site of work unloading along side of track and distributing the same along cess using road crane etc. as directed by the Engineer in charge. with out infringing track with all lead and lift etc.including crossing the track where ever required (a) Initial lead upto 20 Km (All labour, tools, materials, road vehicles, consumable stores, crew etc., are to be supplied by the contractor only at his own cost.) Above/
(b) For every addll. Km (or) part there of beyond the initial lead of 20 km (All labour, tools, materials, road vehicles, consumable stores, crew etc., are to be supplied by the contractor only at his own cost.) All materials ,labour tools, plants and any other incidental work arise at site if necessary at the time of construction of working plat form /cofferdam etc., complete to be borne by the tenderer/contractor and as directed by the Engineer-in-charge . Above/
Transporting of 90R/52kg/60 kg rails from the the stores /depot of SSE/Bridge/P.way available in chennai division or from anywhere over Chennai Division by road to the site of work and 3 hand over released Rails, Channel sleepers and other released materials to the nearest station/LC/stores of SSE/Bridge/P.way as ordered after completion of work using contractor's own tractor/trailor including loading, leading, and unloading at nominated locations with all leads and lifts etc. complete as directed by the Engineer in charge. (a) Initial lead upto 20 Km (All labour, tools, materials, road vehicles, consumable stores, crew etc., are to be supplied by the contractor only at his own cost.) Above/
(b) For every addll. Km (or) part there of beyond the initial lead of 20 km (All labour, tools, materials, road vehicles, consumable stores, crew etc., are to be supplied by the contractor only at his own cost.) Above/
Transporting of Steel cribs for staging purposes at site from the stores/depot of 5 SSE/Bridges or available any where over chennai division by road or any other means to the site of work in MAS - GDR section and hand over the steel cribs to the stores of SSE/Bridges or any other location as ordered after completion of work using contractor's own tractor/trailor including loading, leading, and unloading at nominated locations with all leads and lifts etc. complete as directed by the Engineer in charge. (a) Initial lead upto 20 Km (All labour, tools, materials, road vehicles, consumable stores, crew etc., are to be supplied by the contractor only at his own cost.) Above/
(b) For every addll. Km (or) part there of beyond the initial lead of 20 km (All labour, tools, materials, road vehicles, consumable stores, crew etc., are to be supplied by the contractor only at his own cost.) Above/
Isolation of track as per site condition and as ordered, Removal of existing steel Girder along with Running rails, Guard rails, sleepers and fittings from span under LB/PB and 7 stacking at nominated location including channel sleepers, Running Rails, Guard rails and other fittings stacking near the approach of any Manned Level crossing available near the bridge location/any other nominated location so as to load the girder into the trailor without any infringement to the track and road users and as directed by the Engineer in charge. (All labour, materials, tools, hiring of road cranes including mobilisation charges, crew, fuel, consumable stores etc. and any other incidental works and charges are to be borne by the tenderer/ contractor at his own cost only). Above/
Providing lighting arrangement on hiring basis with contractor's supply of genset and and other fixing materials at particular location of work includes fixing of 4x500 W halogen lights 8 with necessary fittings for night time working as per stipulated norms and lighting the same by means of contractor's supply of 2.5 KVA or higher capacity portable genset, including all luminaries, cables, fuel and tripods. The lights along with genset and necessary fittings either be deposited with SSE/Bridges in charge or can be taken to the stores by the contractor after successful completion of night block on a daily basis. One genset operator and 3 helpers are to be made available for transporting and fixing the lights from the SSE/Bridges depot. (All labour, tools, materials, , are to be supplied by the contractor only at his own cost.) (Note:Unit- Each denotes per gen set) Above/
Reducing the depth at one end of service girder supplied by Railway as per the drawing by cuting of bottom flange and web to required height and depth and providing suitable bottom flange with contractor's supply of steel ,providing stiffners as required by welding etc complete and as directed by engineer in charge (All labour ,tools and plants, machines, consumables etc to be borne by the tenderer/contractor For 12.2m span steel girder Above/
"Trucking out of released materials from site of work to Dy.CMM /GSD/PER or any other nominated locations specifed by the Engineer-in-charge by road or any other means including 10 loading, unloading and leading by contractors own vehicle or any other means and labours etc complete. including all men,materials,tools and plants and any other incidental works arise if necessary , hiring of road vechile/tractor/trailor leading charges, loading and unloading charges are to be borne by the tenderer/contractor and as directed by the engineer-in charge. . (All labour, tools, materials, road vehicles, lighting materials ,consumable stores, crew etc., are to be supplied by the contractor only at his own cost)." Above/
"""Surface preparation and protective coating of PSC box girder /I -Girder/U-type concrete deck slab /columns with Epoxy phenolic IP- Net paints as per the latest CBRI/Roorkee specification including priming coat intermediate coat and polyurethane top coat on outside, bottom 11 and ends of box girders with paints from approved firms of CBRI/Roorkee and with contractors labour , materials, Equipments, scaffolding arrangements etc. complete without any infringements to traffic and as directed by the Engineer -in-charge .(The rate shall include testing of paints by any approved laboratory as directed by Engineer- in-charge) Note: 1. The scoffolding arrangements should not infringe with moving dimension . 2.The IP Net coats have to be procured from approved supplies of CBRI/Roorkee. 3.The supply of paint shall be with manufacurer's test certificate. 4. The painting should be done Airless spray."" " Above/
Dismantling the existingRCCBox/RCC Bed Block ofpiers and abutments torequired portion beforetaking up mega block inorder to reduce the blockperiod for launching andfixing of new 12 precast RCCBed block usingmechanised Diamond wiresewing & core cutting /wall sewing method toCorrect shape and sizeincluding clearing ofdebris without affectingthe train trafficmovement withcontractor men,Materials,machineries etc., asdirected by Engr-incharge. The rate shallinclude the cost ofworking platformscaffolding arrangementsrequired for keeping themachineries at site ofwork. ( Note: This rateincludes lowering ofSheared bed block to bedlevel by using suitableheavy Crawler crane withstandby) Above/ 2106421.3
Casting of precast posttension PSC SLAB 12.2mspan bridge (3 units) at the site without obstructing the water ways as per DrgNo:RDSO/B-10289 & RDSO/B-10289/1 and asper 13 specification of prestressed concrete work laid down in IRSConcrete Bridge Code as directed by Engineer-in-charge of the work oversuitable steel cribs staging as required forcasting and stressing, including providing suitable PCC/ Concrete slabs for the staging ifrequired and lifting arrangements as per approved drawing with all labour, tools and plant, machineries, PCC/concrete slabs, steel crib staging arrangements, materials such as shuttering, wooden planks, wooden cut blocks, cement and steel reinforcement steel, sheathing for cableduct, binding wire, stressing equipment, stressing jacksstressing crew, NOTE: UNIT EACH denotes per span" Above/
Casting of precast RCCretainers of 12.2m spanbridge at the site of workas per Drg No: RDSO/B-10289/1 and as perspecification of concretework laid down in IRSConcrete Bridge Codeover suitable steel cribsstaging for casting of RCCretainer with Railway'ssteel cribs withoutobstructing waterwayincluding providingsuitable PCC/ Concreteslabs for the staging ifrequired and liftingarrangements as perapproved dawing and asdirected by the Engineerin charge 14 of the workwith all labours, tools andplants, machineries,materials includingcement and steel etc.,complete.( one spanconsists of two numbersof RCC retainers). (Alllabour, tools,materials,road vehicles,consumable stores, crewetc., are to be suppliedby theContractor only athis own cost) Note: Steelcribs rental charges to beborne by contractor asper existing railway rates.Note: This item includescasting of base slabs/concrete bases overwhich steel cribs stagingto be erected for suitableheight for casting of RCCretainers.Steel cribsrental charges to beborne by contractor asper existing railway rates.steel cribs to be properlysecured after completionof the work. Note: eachunit denotes "Each span" Above/
Casting of pre-cast post tensioned PSC Slab units of 6.10m span and stressing as per the Drawing No. RDSO / B-10274 and as per the specifications laid down in the drawing and IRS concrete bridge code over pre-erected staging or on CC bed with Railways rails and steel cribs supplied at free of cost including providing suitable concrete base for the stating arrangements and 15 as directed by the Engineer-in-charge of the work, with all labourers, tools and plants, machineries, consumables, concrete base, staging arrangemnts, materials such as shutttering, wooden planks, wooden cut blocks, cement and reinforcement steel, steel sheathing for cable duct, binding wire, stressing equipments, stressing jacks, with power pack, stressing crewmates, HTS wires, bearing cones, wedges and other incidental marerials, provision for surface vibrators, shutter vibrators and needle vibrators etc., complete. (All labour, tools and plants, shuttering / support materials, cement reinforcement steel, HTS wire, stressing Jacks with power pack, consumables, crew are to be supplied by the contractor only at his own risk and cost including transportation of required steel cribs and rails from available location in entire Chennai Division. Above/
Casting of pre-cast RCC Retainers of clear span 6.10m to approved plan and as per 16 specifications of work laid down in IRS bridge code and as directed by the Engineer-in-charge of the work over the pre-erected staging with all labour, tools and plants, machinaries, concrete base for staging arrangements, materials such as shttering, wooden planks, wooden cut blocks incuding cement, reincorcement steel and other incidental materials and items incuding provision and surface vibrators, shuttering vibrators, needle vibrators etc. (One span consists of two numbers of RCC Retainers) note: unit each denotes per span' Above/
Erection of precast PSC Girders / PSC Slabs, RCC Girders / RCC Slabs Precast bedblocks by suitable capacityroad cranes using liftingbeam under line block/power block etc dulypreparing and levelling thebearing area over abutment/pier with a layer of CIboring matrix to a 17 thicknessnot exceeding 25mm and asdirected by Engineer-in-charge including cranes withstandby cranes of requiredcapacity men, materials ,labour, tools &plantsconsumables, hiring ofcranes and other relatedmaterials required forerection should be arrangedby the Contractor only (oneof the released girder maybe used as lifting beam dulyfixing hooks at appropriatelocation by welding whichshould be done byContractor only) (All labourand tools, equipments andother consumsble storessuch as cement, CI boringsroad cranes, crew, fuel, areto be supplied byTenderer/Contractor only athis own cost and risk (Alllabour, tools, materials, roadvehicles, consumable stores,crew etc., are to be suppliedby the contractor only at his own cost) Above/
Supply, Providing and fixing GRP Walk way Refugee Platform, on the out side of Ballast retainer slab of existing Br. No. 1474, including Supply and fixing of GRP platform (1000mm 18 width) structure connecting trolley refugees, with mounting brackets to bridge proper at 1500 mm c/c distance using SS 316 anchor fasteners duly drilling the bridge structure in the sides, with out affecting its design considerations, and through weep holes and additional holes by removing the ballast under traffic conditions during day or night as per the availability of traffic block and providing steel bolts of approved size as per drawing through the weep holes and additional holes provided in the bridge with stainless steel plates on both sides of the weep holes and fixing the GRP Hand rails of 1m height with the Above/
Erection of modified service girder 12.2 m span and shifting of modified service girder from one span to another duly fixing with rope/slings using suitable road crane of adequate capacity during line block without affecting the traffic and including trucking out from BFR and unloading by road crane at site of work with all lead and lift etc complete and as directed by Engineer-in-charge. Above/
Supply and providing epoxy mortar or similar to SIKADUR 41 course over the bed 20 block to an average thickness of 25mm duly removing the bed plates, cleaning the surface etc., complete and as directed by the Engineer-in-charge of the work. All labour, materials, tools and plants, consumables, equipments, ladders / scaffoldingsall lead and all lifts required etc. by the contractor. Above/
Arranging and making ready spare road crane of 150 T capacity to be utilised in case of any falty working of the original crane during the line block and power bloc etc. as directed by the Engineer-in-charge. All labour, tools and plants, equipments, trailers, cranes, consumables, crew etc., by the contractor. (If required Dip loory / steel cribs etc. will be supplied by Railways free of cost according to availability of block) Above/ 4289205.6
Casting of precast post tensioned PSC "U " SLAB 18.3m span single unit at the site without obstructing the waterways as per Drg No:RDSO/B10276/R and as per specification of prestressed concrete work laid down in IRS Concrete Bridge Code as directed by Engineer-in-charge of the work over pre-erected staging with Railway steel cribsand rails supplied free of cost including providing suitable concrete note: unit each denotes per span"
C-List of items of work that are covered DSR 2021 (Note: DSR 2021 is
A1-List of items of work that are covered under Southern Railway
Supply and using Cement at Worksite Ordinary Portland Cement 43 grade approved brands/makes
A2-List of items of work that are covered under Southern Railway
Supply of steel reinforcement of approved brands/makes for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars of grade Fe-500D or more of approved brands/makes.
Schedule of Rates 2021 (Formation,Br & Pway works) for Chennai Division.
MAS-GDR Section: Replacement of existing corroded steel girders with pre-stressed concrete slabs
and jacketing of sub-structure of Br No 177 up & Down Lines at Km - 84/6-12.
S No. Item Description of Item Unit Qty Rate Amount
CHENNAI DIVISION-ENGINEERING/SOUTHERN RLY
Earthwork in cutting in formation, trolley
refuges, side drains, level crossing
approaches, platforms, catch water drains,
diversion of nallah & finishing to required
dimension and slopes to obtain a neat
appearance to standard profile inclusive of all
labour, materials, plant & machinery, leading
all cut spoils either to make spoil dumps or for
filling in embankment with leads within 2 km
on either side of edge of the cutting(s)
including all lifts, ascent, descent, loading,
unloading, bailing & pumping out water, if
required, clearance of site and all other works
incidental thereto for completing the work as
per RDSO Specification No. RDSO/2020/GE:
IRS-0004 with latest updated correction slips
and to the satisfaction of the Engineer-in-
Charge. Note: (i) All usable earth arising from
cut spoils shall be led into bank formation and
Unusable spoils shall be dumped / stacked
away from toe of embankment. (ii) All hard
rock /and boulders not fit for filling will be
stacked by the contractor and will be
property of the Railways. (iii)Cut trees shall
be property of Railways and to be deposited
in the railway godown unless specified
otherwise in the Conditions of Contract.
1 012015 Extra for leading of Cut spoil every one km cum 5000.00 5.39 26950.00
beyond original lead of 2 km over item nos.
Earthwork in excavation by mechanical
means (Hydraulic Excavator)/Manual Means
for foundations and floors of the bridges,
retaining walls etc. including setting out,
dressing of sides, ramming of bottom, getting
out the excavated material, back filling in
layers with approved material and
consolidation of the layers by ramming and
watering etc. including all lift, disposal of
surplus soil up to a lead of 300m, all types of
shoring and strutting with all labour and
material complete as per drawing and
technical specification as directed by
Engineer in charge. Note: This item will be
used for excavation work in connection with
other miscellaneous works also like side
drains, foundation for OHE masts and other
miscellaneous structures in connection with
Gauge Conversion, Doubling, New lines.
Providing and laying in position Plain cement
concrete of specified Nominal Mix for
miscellaneous works like side drains,
foundation for OHE masts and other
miscellaneous structures excluding the cost of
Cement, centering and shuttering - All work
up to plinth level :
graded stone aggregate 20 mm nominal size)
graded stone aggregate 20 mm nominal size)
CHENNAI DIVISION-ENGINEERING/SOUTHERN RLY
5 022040 Providing and laying in position machine cum 150.00 4561.69 684253.50
batched, machine mixed and machine
vibrated Cement Concrete of specified grade
as per approved Design Mix (mixed in Mobile
Concrete Batching/Mixing Plant at site or RMC
from approved plants) using 20mm graded
crushed stone aggregate and coarse sand of
approved quality in RCC raft foundation & Pile
cap including finishing, using Plasticiser in
approved proportions (as per IS:9103), to
modify workability without impairing strength
and durability complete as per specifications
and direction of the Engineer in charge. Note:
1. Payment for cement, reinforcement and
shuttering shall be made extra under relevant
item. 2. Plasticiser shall invariably be used in
approved proportion to increase workability
with minimum possible quantity of cement for
all grade of Design Mix Concrete unless it is
specifically approved citing reasons for not
using plasticiser at the stage of Mix Design
and in that case deduction shall be made as
per relevant item.
Providing and laying in position machine
batched, machine mixed and machine
vibrated Cement Concrete of specified grade
as per approved Design Mix (mixed in Mobile
Concrete Batching/Mixing Plant at site or RMC
from approved plants) using 20mm graded
crushed stone aggregate and coarse sand of
approved quality for the following Reinforced
cement concrete structural elements up to
height of 9.0 m from foundation top level,
including finishing, using Plasticiser in
approved proportions (as per IS:9103), to
modify workability without impairing strength
and durability complete as per specifications
and direction of the Engineer in charge. Note:
1. Payment for cement, reinforcement and
shuttering shall be made extra under relevant
item. 2. Plasticiser shall invariably be used in
approved proportion to increase workability
with minimum possible quantity of cement for
all grade of Design Mix Concrete unless it is
specifically approved citing reasons for not
using plasticiser at the stage of Mix Design
and in that case deduction shall be made as
per relevant item.
7 022053 Abutment cap, Pier Cap, Inspection Platform cum 450.00 4716.06 2122227.00
& Pedestal over Pier cap, Fender wall,
Diaphragm wall etc.
8 022054 Approach slab at formation level, Dirt wall/ cum 20.00 4613.14 92262.80
ballast wall at formation level
9 022070 Providing and fixing Weep Holes in Metre 100.00 313.33 31333.00
Abutments, Wing walls and Return walls etc.,
of new bridges with 110mm dia UPVC pipe
Type A ISI marked with all contractor's men,
material, transportation, all taxes as per
specifications and as directed by Engineer-in-
CHENNAI DIVISION-ENGINEERING/SOUTHERN RLY
Boring, providing and installation of bored
cast in-situ Reinforced Cement Concrete piles
using Hydraulic piling Rig of specified
diameter and length below pile cap of
specified grade with Design Mix Cement
Concrete, using 20mm graded crushed stone
aggregate and coarse sand of approved
quality, to carry a safe working load not less
than specified, concreting by machine
batching, machine mixing, scaffolding, using
Admixture in approved proportion (as per
IS:9103), placing with tremie pipe, chipping
off of pile top to remove laitance concrete
above cut off level etc., pumping and bailing
out water complete in all respect as per
approved drawing, specification and direction
of the Engineer in charge. Note: 1. Payment
for only cement, reinforcement shall be made
extra. 2. Length of the pile for payment shall
be measured up to the bottom of RCC pile
Cap. 3. Plasticiser shall invariably be used in
approved proportion to increase workability
with minimum possible quantity of cement for
all grade of Design Mix Concrete unless it is
specifically approved citing reasons for not
using plasticiser at the stage of Mix Design
and in that case deduction shall be made as
per relevant item.
11 022100 Providing, fabricating and installing MT 35.00 123864.05 4335241.75
permanent casing pipe for bored piles for all
diameters with specified thickness of steel
plate including all labour, materials, tools &
complete as per approved drawing &
specifications complete in all respect as per
the direction of Engineer in charge. Note:
Payment shall be made as per the weight of
circular plate of casing pipe only.
Extra for chiselling in addition to boring of
piles, if chiselling is required to be resorted to
in hard rock or big stone boulders larger than
30cm, manually or by any other means.
Conducting load test of a single pile up to
specified capacity in accordance with IS:2911
(Part-IV) including installation of loading
platform and preparation of pile head or
construction of test cap and dismantling of
test cap after test etc. with all labour,
material, tool & plants, equipment,
machinery, etc. complete as per drawing and
specification, as directed by the Engineer.
13 022123 Initial load test above 100 ton and up to 250 T Each 1.00 108092.38 108092.38
14 022127 Routine Load Test above 100 ton capacity up Each 5.00 54046.19 270230.95
to 250 ton capacity pile
Centering and shuttering including strutting,
propping etc. and removal of form for :
15 025031 All types of bridge sub-structures, e.g. pier, Sqm 3000.00 765.08 2295240.00
abutment, wing wall, retaining wall, RCC box
type foundations, Abutment cap, Pier Cap,
Inspection Platform & Pedestal over Pier cap,
Fender wall, Diaphragm wall etc. up to 5m
above ground level
16 025032 All types of bridge super-structures, e.g. Sqm 500.00 989.92 494960.00
slabs, I-girders, T-girders, Box girders etc. up
to 5m above ground level.
CHENNAI DIVISION-ENGINEERING/SOUTHERN RLY
17 025033 Extra for additional height over item no. Sqm 200.00 121.09 24218.00
025031 & 025032 wherever required with
adequate bracing, propping etc. over initial
height of 5 metres for every additional height
of 1 metre or part thereof.
18 025040 Providing and laying in position machine cum 750.00 7413.51 5560132.50
batched, machine mixed and machine
vibrated Cement Concrete of specified grade
as per approved Design Mix (mixed in Mobile
Concrete Batching/Mixing Plant at site using
20mm graded crushed stone aggregate and
coarse sand of approved quality in jacketing
of piers and abutments from bottom of
foundation up to a height of 10m for designed
thickness of jacketing including finishing,
using Plasticiser in approved proportions (as
per IS:9103), to modify workability without
impairing strength and durability complete as
p e r specifications and direction of the
Engineer in charge. N o t e : 1. Payment for
cement, reinforcement and shuttering shall
be paid extra under relevant item. 2.
Plasticizer shall invariably be used in
approved proportion to increase workability
with minimum possible quantity of cement for
all grade of Design Mix Concrete unless it is
specifically approved citing reasons for not
using plasticisers at the stage of Mix Design
and in that case deduction shall be made as
per relevant item.
Extra over 025040 for drilling of holes and
insertion of dowel bars in case of Jacketing
19 025051 Extra for drilling 32mm dia. holes for Metre 2060.00 182.47 375888.20
jacketing / anchoring
20 025052 Extra for inserting of dowel bars of specified Metre 2060.00 16.48 33948.80
dia. (cost of rods to be paid extra)
21 031180 Providing Flood Level Gauges on abutments Sqm 4.00 663.11 2652.44
and piers, made by 20mm thick 1:4 cement
plaster for a width of not less than 300mm,
duly engraving markings & figures in metres,
divided into 10 parts commencing from
under-side of girders towards bed, painting
markings & figures with black enamel paint in
three coats on white background including
painting HFL Mark in white by side of gauge
with year of occurrence with all Contractor's
materials, labour, tools, scaffolding and
supports, lead & lifts, curing etc. complete as
per approved drawing and as directed by the
Engineer in- charge excluding cost of cement
which shall be paid extra.
22 041080 Supplying, Fabricating and fixing access MT 10.00 103373.13 1033731.30
ladders, inspection platforms, Trolley refuges
etc., on bridges with structural steel
conforming to IS:2062 including welding /
bolting, priming painting with one coat of
ready mixed paint of Zinc Chromate (IS:104)
with DFT of 25-30 microns followed by one
coat of Zinc Chrome Red Oxide (IS:2074) with
DFT of 25 microns with all material, labour,
T&P as a complete job. Note: Painting shall be
paid separately under relevant item.
CHENNAI DIVISION-ENGINEERING/SOUTHERN RLY
Removing of existing bed plate from existing
bed block, supply, fabrication and erection of
new bed plate of approved sizes in exact
position over bed block of pier/abutments by
giving full and even bearing, setting them on
the layer of free flow non-shrinkable grouting
compound, scrapping or chipping of bed
block, if required, fabrication and fixing of
holding down HTS bolts of suitable sizes along
with nuts, washers etc., drilling holes of
required size, grouting of holes by epoxy
mortar after fixing holding down bolts. Total
work to be done during traffic block. Cost of
holding down HTS bolts shall be paid extra
under relevant item for supply of HTS holding
be executed under traffic or power block.
Delaunching of all types of Steel girders, PSC
girders/Slabs and stacking away from river
stream or passage as directed by Engineer in
charge with all labour, tools and plant,
equipment etc., complete.
27 041370 Supplying fabricating and erecting welded MT 10.00 113537.08 1135370.80
and/or bolted and/or riveted steel work in
built up sections, trusses and framed work,
staging, racks, Height Gauge etc. for Steel
Structures other than bridge girders, using
RSJ, tees, angles and channels/flats, plates,
gussets, round or square bars, cleats, bolts
etc., with contractors own steel including
cutting, bending, straightening, drilling,
riveting, hoisting, fixing, erecting, welding,
bolting etc., with Providing stiffeners
wherever required as per approved drawing
including applying a priming coat of a
approved steel primer with all contractor's
materials, labour, tools & plants, lead & lift
including crossing of tracks if required etc.,
complete as per specification and as directed
by Engineer-in-charge. Note: The payment
shall be made on the theoretical weight of
main components and gusset plates only.
28 052020 Providing and laying 300mm thick (average) cum 500.00 3322.34 1661170.00
Dry Stone flooring with boulders of not less
than 35kg each in weight, hand packed with
surface levelled off to the correct section with
hammer dressing as necessary on the ground
including filling the gaps with quarry spalls
and ordinary sand complete including cost of
supply of all materials, labour, lead, lift, tools,
plants, crossing of tracks and the like as per
drawing and technical specification as
directed by Engineer in charge.
29 052210 Providing cast in situ bridge number plaques Each 4.00 1001.17 4004.68
as per Railway drawing in cement concrete
1:2:4 mix using 20mm hard stone aggregate
embedded in 30mm notch in Bridge parapet
coping duly engraving the letter and figures
and an arrow indicating the direction of flow
and finishing the top exposed surface with
cement mortar 1:3, painting letters and
figures with two coats of black enamel paint
on two coats of white background with all
labour, tools, cement, paint etc. with all leads
CHENNAI DIVISION-ENGINEERING/SOUTHERN RLY
30 052220 Providing cast in-situ plaques for bridge Each 30.00 1369.34 41080.20
foundations details of size 45cmx45cmx5cm
in cement concrete 1:2:4 mix using 20mm
hard stone aggregate embedded in 30mm
deep notch over abutment & piers, engraving
the letters & figures with CM 1:3 and finished
smooth including painting letters and figures
with 2 coats of black enamel and plaque with
white enamel with all labour, tools, cement,
paint, curing etc. as a complete job.
Providing & laying non pressure NP-4 Class
RCC pipe with collars, jointing with 1:2
cement and ordinary sand mortar including
testing of joints, but excluding earthwork with
all labour and material as a complete job.
Cement for mortar will be paid separately.
(Pipes of 600mm dia and above will be laid
using crane/hydra).
32 052260 Dewatering of natural or accumulated water HP 5000.00 74.78 373900.00
from any location. Payment to be done for Hour
Horse power of pump multiplied by pumping
Designing and developing Detailed structural
and working Drawings for following items for
ROB/RUB/Bridge based on Railway's approved
GADs, duly collecting necessary data from
Railways and R&B authorities, duly designing
members and submission of check plot duly
getting proof-checked by Railway approved
institutes, submitting for Railway's
verification and approval, making corrections
duly incorporating suggestions in
drawings/designs, further submission of
original in transparent film paper and soft
copy (CD) for Railways approval etc. with
contractor's technical expertise and
instruments, labour, consumables, repeatedly
attending till final approval etc., complete as
directed by Engineer in-charge.
piers/abutments
34 063080 Lubrication of Elastic Rail Clips on PSC ERC 3000.00 2.69 8070.00
sleepers as per procedure prescribed in latest
edition of IRPWM with Railway's grease.
Cutting / cropping of rail of 60Kg - 90 UTS,
manually and perfectly vertical with
contractor's labour, hacksaw blade and tools
& plants - Note: 1.Manual cutting should be
used only in emergencies with prior
permission of sectional ADEN where machine
cutting can not be arranged in time. 2.
Cutting of Rails with blade and forcing to part
by using other means to break the rails is
prohibited. 3.Rails should be cut right through
hacksaw blades only.
Drilling of hole of different diameter and
chamfering, in rail of any section and any UTS
manually only in emergencies with
contractor's labours, tools & plants,
consumables etc.
Gas cutting of rail of various sections with
contractor's tools & plants, as directed by
engineer in-charge :
CHENNAI DIVISION-ENGINEERING/SOUTHERN RLY
Recoupment of ballast in running line with
railway's stone ballast from existing stacks
available along alignment either on top of
cutting or on cess or at toe of bank by head
leads or by any other means and spreading to
make up deficiency in the required profile
with contractor's labour, tools & plants, as
directed by Engineer-in-charge. Note:
Payment shall be made based on ballast
stack measurement.
38 082011 For average lead up to 50m and lift up to 5m cum 520.00 159.02 82690.40
39 083010 Lifting and packing for regrading the existing TRM 1000.00 198.96 198960.00
PSC sleeper track to required height / level in
stages not exceeding 75mm or part thereof
at a time, providing permissible ramp for the
track, insertion of moorum / sand / stone
ballast uniformly under the existing track and
placing the same to safe approved gradient,
gauge, cushion including levelling and one
round of through packing to allow train
movement at restricted speed of 30 kmph for
a specified length with all leads & lifts and
fixing, marking, painting rail level pegs at
every 30m interval. Note: Lifting of track shall
be done in stages as per procedure
prescribed in latest edition of IRPWM to get
the proposed final level as per approved
working profile, as directed by Engineer in-
40 083011 Extra for additional lift over 75mm for every TRM 1000.00 30.88 30880.00
50mm lift or part thereof up to 275mm for
item nos. 083010 for each TRM.
41 083020 Regrading the existing track by lowering up to TRM 1000.00 691.38 691380.00
required depth in stages by cutting the
formation top maintaining the depth of
existing cushion finally, not exceeding 75mm
in one stage including one round of through
packing and making track fit for 30kmph
speed at each stage of lowering as per
procedure prescribed in latest edition of
IRPWM and subsequent picking up of sags /
slacks and attending to misalignment / cross
level defects during train operation, providing
required ramp-in and ramp-out for safe
passage of trains, including cutting trenches
across track at every 30m interval to the
required final formation level complete, and
fixing, marking, painting rail level posts, tie
bars at every 30m interval as directed by
engineer in-charge. Note: The item shall be
only operated only when formation is
required to be cut for lowering of existing
CHENNAI DIVISION-ENGINEERING/SOUTHERN RLY
42 092030 25mm gap 'in-situ' welding during traffic Each 60.00 1806.57 108394.20
block using Railway's welding portion &
Welder and finishing of weld to meet the
prescribed tolerances and pass all stipulated
tests with all required labour, materials,
consumables, tools, equipments etc. to
complete the work in all respect as per IR's
"Manual for Fusion Welding of Rails by
Alumino - Thermic Process" with latest
correction slips, including marking of welded
joint, painting weld collar with anticorrosive
paint, restoration of track near weld joint to
original position and fixing of joggled fish
plate at new weld, to be removed after
passing of weld in USFD test as directed by
Engineer in charge. Note: 1. Only welding
portion and related accessories as per
Annexure - I and Welder shall be supplied by
Railways. 2. Hydraulic Weld trimmer shall be
used for chipping and profile Grinder for
finishing. 3. Required nos. of Joggled fish
plates shall be supplied by Railway at nearest
P. Way Stores and the same shall be returned
at nearest P. Way Store or at other location
as per direction of Engineer-in-Charge after
release from track.
43 123060 Linking of BG track (with guard rail ) over TRM 400.00 472.62 189048.00
ballasted deck bridges with any type of rail
section and PSC sleeper including leading free
rails/welded panels available along the
alignment on to bridge, leading and
spreading all fittings and fastenings, leading
& spreading of sleepers at specified spacing,
squaring, placing of rails over sleepers and
fixing rails & guard rails to sleepers with all
types of fittings and fastenings to correct
gauge & alignment, lubrication of fittings and
fastenings with contractor's grease as per
IRPWM standards with contractors labour,
tools, consumables, with all lead, lifts etc.
complete and raising, levelling and initial
packing of track to make it fit for 30 kmph
and meet other prerequisites prescribed in
Indian Railway Track Machine Manual for
deployment of Tamping Machine. Note: 1.Rail
cutting and Hole drilling shall be paid
separately. 2.Spreading of ballast and
compaction shall be paid separately under
relevant item. 3. This item shall be applicable
only when track is with Guard Rail. Linking
without guard rail be paid under relevant item
for plain track linking.
Quick cutting with abrasive rail cutter of all
types of rail sections including wear resistant,
head hardened rails up to 110 UTS, with
contractors tools & plants, equipment,
consumable with all lead & lift etc. complete
as directed by Engineer in-charge. Abrasive
Rail Cutter will be as per RDSO Specification
No. TM/SM/1 (Rev. 01 of 2012) with latest
status of RDSO; Rail Cutting Wheel Abrasive
Disc will be as per RDSO Specification
No.TM/SM/2 (Rev. 01 of 2020)
CHENNAI DIVISION-ENGINEERING/SOUTHERN RLY
Drilling holes of 16 mm to 32 mm dia. with
Rail Drilling machine including chamfering
with appropriate chamfering tools in all types
of rail section with contractor's tools & plants,
equipment, consumable with all lead & lift
etc. complete, as directed by Engineer in-
charge. Rail Drilling Machine will be as per
RDSO Specification No. TM/SM/3, dated
46 161050 Drilling holes of specified size for bond holes Each 200.00 53.93 10786.00
with 7.2mm dia drill twist to correct spacing
and location on 60kg/52kg rails on cess or
under traffic block with contractor's tools and
plant, equipment, consumable, labour etc
complete as directed by the Engineer in
charge at site.
Loading, leading and unloading of all types of
P.Way fittings and all other miscellaneous
material except Rails, sleepers, switches,
crossings, SEJs and Glued Joints by road
vehicles for different leads. Note: Lead shall
be the shortest motorable road length
between the points of loading and unloading.
48 194010 Manufacture of flared portion of Guard Rail by Set 4.00 4869.00 19476.00
cutting and bending to required shape &
RDSO's approved drawings. Note: (1) Rails
shall be supplied by Railways. (2) One set
consists of two rails i.e. both left and right.
49 194020 Providing and fixing of flared portion of guard Set 4.00 4064.12 16256.48
rails of any rail section over PSC sleepers
including fixing of with all fittings, including
leading of rails and fittings, squaring and
adjusting spacing of sleepers as required,
providing nose blocks duly cutting wooden
blocks supplied by railways and fixing it with
bolts of 16mm dia as directed complete and
finished as per RDSO's approved drawing.
Note: 1.One set consists of LH & RH side rails
of one end. 2.Required P.Way fittings will be
supplied at SSE stores depot.
50 194030 Drilling holes 25mm to 40mm dia. with drill Each 1604.00 77.31 124005.24
twist in the foot of guard rails for fixing guard
rails on bridge as directed.
51 195070 Fabrication, supplying and fixing 600mm x Each 4.00 3878.99 15515.96
450mm Bridge Board made from 16 SWG MS
Sheet duly welded or riveted to back support
of two 600mm long horizontal angles of size
25mm x 25mm x 3mm & two numbers 2.5
metre long vertical support of MS Angle of
size 50mm x 50mm x 5mm, welded / rivetted
to board. Vertical supports shall have split
ends for proper fixing in ground. Vertical
supports of board shall be embedded in
ground in M 20 Cement Concrete blocks of
size 300mm x 300mm x 300mm, complete
job including painting & writing of subject
matter on bridge board, as directed by
Engineer - In charge Note: Excavation &
concrete work will be paid separately.
52 195100 Supplying providing and fixing country kali cudm 2000.00 95.13 190260.00
wood/hard wood (Non teak) sleepers of
various thickness and length as per the RDSO
re railing ramp Drg No T-8259 for fixing bent
rails and MS plates including cutting the wood
in saw mills, transporting to site of work with
all leads and lifts, labour, tools and plant etc.
as directed by Engineer In-charge.
CHENNAI DIVISION-ENGINEERING/SOUTHERN RLY
Hiring of machinery for minor miscellaneous
works for short duration including
operator/driver, fuel, lubricants and
consumable. The contractor shall arrange all
statutory permits as required by rules and
regulations prevailing in the area of work.
Payment shall be made for actual working
53 211201 JCB Backhoe Loaders 3DX Plus or similar with Hour 200.00 867.49 173498.00
minimum 1.10 cum bucket capacity
54 211220 Supplying and filling 50 kg size empty cement Each 5000.00 17.90 89500.00
polythene bags with Rly.
Ballast/moorum/earth/Sand/quarry dust etc.
placing the filled bags on the high banks
/bridge approaches/nominated place etc.
dumping and spreading at the nominated
locations to profile under block period with all
contractor's labour, tools, plants, loading,
unloading, filling, spreading including all
lead/lift etc. complete and as directed by the
Engineer in charge at site including crossing
of track where necessary.
55 211230 Supply, filling and stacking of sand bags layer Each 5000.00 16.66 83300.00
by layer filled with Railway Sand/railway
quarry dust in Contractor's empty polythene
cement bags of 50 kg bags with all
contractors labour, tools, plants, lead, lift etc.,
including stitching the same with machine
using polythene thread complete as directed
by Engineer-in charge at site.
Schedule C-List of items of work that are covered DSR 2021 (Note: DSR 2021 is having the GST
provision of 12%. However, tenderers should quote rates for items inclusive of 18% GST).
MAS-GDR Section: Replacement of existing corroded steel girders with pre-stressed concrete slabs
and jacketing of sub-structure of Br No 177 up & Down Lines at Km - 84/6-12.
S No. Item Description of Item Unit Qty Rate Amount
2.0 EARTH WORK
2.25 Filling available excavated earth (excluding cum 5000 253.95 1269750
rock) in trenches, plinth, sides of foundations
etc. in layers not exceeding 20cm in depth,
consolidating each deposited layer by
ramming and watering, lead up to 50 m and
lift upto 1.5 m.
5.0 REINFORCED CEMENT CONCRETE
5.1S CAST IN SITU
Providing and laying in position specified
grade of reinforced cement concrete,
5.1 excluding the cost of centering, shuttering,
finishing and reinforcement - All work up to
derived from natural sources: 3 graded stone
aggregate 20 mm nominal size derived from
natural sources)
5.33S DESIGN MIX CONCRETE
5.35 Add for using extra cement in the items of Quintal 1000 688.45 688450
3 design mix over and above the specified
cement content therein.
6.0 MASONRY WORK
Brick work with common burnt clay F.P.S.
(non modular) bricks of class designation 7.5
in superstructure above plinth level up to
floor V level in all shapes and sizes in :
CHENNAI DIVISION-ENGINEERING/SOUTHERN RLY
10.0 STEEL WORK
Steel work in built up tubular (round, square
or rectangular hollow tubes etc.) trusses etc.,
including cutting, hoisting, fixing in position
and applying a priming coat of approved steel
primer, including welding and bolted with
special shaped washers etc. complete.
11.0 FLOORING
Cement plaster skirting up to 30 cm height,
with cement mortar 1:3 (1 cement : 3 coarse
sand), finished with a floating coat of neat
15.0 DISMANTLING AND DEMOLISHING
Demolishing cement concrete manually/ by
mechanical means including disposal of
material within 50 metres lead as per
direction of Engineer - in - charge.
equivalent design mix)
Demolishing stone rubble masonry manually/
by mechanical means including stacking of
15.9 serviceable material and disposal of
unserviceable material within 50 metres lead
as per direction of Engineer-in-charge :
Dismantling steel work in single sections
15.17 including dismembering and stacking within
50 metres lead in:
15.18 Dismantling steel work in built up sections in Kg 2500 4.65 11625
angles, tees, flats and channels including all
10 gusset plates, bolts, nuts, cutting rivets,
welding etc. including dismembering and
stacking within 50 metres lead.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
NEFTForm.pdf
ATTACHMENT
ProcedureforMeasurementofworksbytheContractor.pdf
ATTACHMENT
ProcedureforLCModeofPayment.pdf
ATTACHMENT
GCCApril2022_compressed.pdf
ATTACHMENT
eTenderformApril2022.pdf
ATTACHMENT
IRGCCACS1to10_compressed.pdf
ATTACHMENT
FORMATIONBUILDINGBRIDGEPWAYWORKSJULY2024_1.pdf
ATTACHMENT
MOVEMENTOFVEHICLESNEARRAILWAYTRACK.pdf
ATTACHMENT
SNWupdated28NOV25.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .