Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.4 LAccepted-Finance 3 147 KPN NAGAR MELTUR DAM 636 401 | SALEM | TAMIL NADU | 636401 | 1 | Accepted-Finance satisfied |
Tender Value
Refer Docs
EMD Value
₹1,800
Closing Date
4 Feb 2021, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I Mill Plant AC Plant N E Room Unit I to IV Fabrication and Erection of New G I duct with supply air grill Dismantling the ideal duct in the Mini conference hall by removing the false ceiling perforated particle board Erecting etc
2021_EB_192064_1
SE / M-I / MTPS-I / MP/OT. 288 / 2020-21
Open Tender
Power/Energy Projects/Products
Works
30 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹1,800
Yes
9 Feb 2021
21 Jan 2021
5 Feb 2021
21 Jan 2021
4 Feb 2021
21 Jan 2021
Amount
Charges for removing and re fixing the perforated particle board with anodized aluminium grid construction of 38x38 mm ‘ T’ and forming 600x600mm panels complete with various members for fastenings and fittings suspended from the roof.
Charges for dismantling the ideal duct length(17.5m) from Mini conference hall up to the duct branch near JE turbine office wall and providing dummy at the end. Cutting the duct for dismantling wherever necessary for easy handling to lead to the station battery room.
Charges for Providing and dismantling two legged Scaffolding using casurinas props and with wooden planks for erecting the duct at unit II station battery room of height from ‘0’ to ‘10.5’m of length 10mx1m cost of all materials, all labour charges, lead, lift etc., complete.
Charges for Fabricating ‘L’ shaped supports with angle size 50x50x5mm of length 450mm welding on the beams to support and also grouting in the wall with Anchor bolt 12mm as required in the size and plastering the released duct portion open wall area (Angle will be supplied by board)
Charges for Fabrication of New GI Duct of size 300mm x 460mm for N/E Room of all unit I to IV and shortage of duct for Station battery SWGR room (0.8mm Thick GI Sheet will be Contractor scope) This works involves Sheet cutting, bending, folding’s, drilling holes in the Flanges.
Charges for Erection of New GI Duct of size 300mm x 460mm for N/E Room of all unit I to IV and Erecting the duct of size 300x300mm and400x400mm in the 220V DC distribution Station battery SWGR room and leading , lifting to the position
Charges for fabrication of spool piece for fixing Supply air grill of neck size 250X600mm and providing opening and fixing the supply air grill in the area were required proper air distribution. And also for providing dummy at the end of the duct.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .