S.E. B.S.C.C.C.-1, Mzp
Office of Superintending Engineer, Bansagar Canal Construction Circle-1 Mirzapur
Strengthening work of Right Bank between Km. 68.090 to Km. 68.230 of Ban Sagar Feeder Canal.
2026_UPIDC_1179341_1
04/SE/2026-27
Open Tender
Civil Works
Item Rate
240 days
Sidhi
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹3.3 L
25 Aug 2026
25 Aug 2026
7 Sept 2026
25 Aug 2026
7 Sept 2026
27 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork for embankment (hearting/ casing) using selected soil from approved borrow areas in layers of 250 to 300 mm (before compaction) including cost of all materials, machinery, labour and dressing, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides (excluding watering and compaction ) | 19,008.45 | M3 | - | - |
| 2 | Earth work in Excavation in all Kind of Soft/ loose/ hard/ dence soils, moorum and moorum mixed with boulders and mud including Dressing, placing the excavated soil neatly in specified dump area or disposing off the same as directed, including cost of site clearance, all materials machinery,labour and dressing etc. complete. | 1,607.42 | M3 | - | - |
| 3 | Providing and Laying coarse sand filter including all cost of material,labour, T&P etc required for proper completion of work. | 61.88 | M3 | - | - |
| 4 | Providing and Laying graded filter stone gritt 20 to 4.75 mm including all cost of material, labour, T&P etc required for proper completion of work. | 61.88 | M3 | - | - |
| 5 | Providing and Laying graded filter stone Ballast 40 to 20 mm including all cost of material, labour, T&P etc. required for proper completion of work. | 61.88 | M3 | - | - |
| 6 | Providing and Laying Uncourse Rubble stone Boulder for pitching including all cost of material, labour, T&P etc. required for proper completion of work. | 87.9 | M3 | - | - |
| 7 | P.C.C. work in (1:3:6) M-10 grade conc. With 40 to 20 mm stone Ballast including all cost of material,labour etc complete. | 229.52 | M3 | - | - |
| 8 | C.C. work in M-15 (1:2:4) grade conc. With 20 to 4.75 mm stone Gritt including all cost of material, labour etc complete. | 174.09 | M3 | - | - |
| 9 | Supplying and Laying of HDPE texture Honeycombed Geocell of size 356x150 x1.5 mm having polymer Density between (0.935 to 0.965 g/cm3) including all assoseries (ie. PVC U hook nail and PVC Tie Strip) and T&P, Labour required for proper completion of work. | 7,552.13 | M2 | - | - |
| 10 | C.R. stone 200x200x(150 to 200 mm) masonary with 1:3 cement mortor including cost of material, T&P etc. including all lead and lift for proper completion of work. | 1,330.41 | M3 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_2217446.xls
BOQ • 5.35 MB
Tender_Document_04_se_2627.pdf
Tender Documents • 2.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].