| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | ₹4.2 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹4.4 L+₹15,268 (3.62%)Rejected-AOC | ₹4.4 L+₹15,268 (3.62%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | LAKSHMI ASSOCIATES L1 | AMMAN BUILDERS L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the damaged brickwork | 9 | m3 | 280 ₹2,520 Lowest | 300 ₹2,700 |
| 2.00 | Dismantling the damaged Reinforced cement concrete | 2 | m3 | 7,000 ₹14,000 Lowest | 7,000 ₹14,000 Lowest |
| 3.00 | Scrapping the damaged plastering in CM | 8 | m2 | 9 ₹72 Lowest | 10 ₹80 |
| 4.00 | Cement concrete 1:4:8 (one cement, four sand and eight aggregate) using 40mm hard broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted etc., complete complying with standard specification. | 5 | m3 | 5,300 ₹26,500 Lowest | 5,500 ₹27,500 |
| 5.00 | Supplying and erecting CENTERING AND SHUTTERING with necessary supports for plane surfaces such as RCC SLABS, LINTEL SUNSHADES, etc., with all cross bracings using mild steel sheets etc., complete | 8 | m2 | 1,060 ₹8,480 Lowest | 1,100 ₹8,800 |
| 6.00 | Supplying and erecting SHUTTTERING including necessary supports for plane surfaces such as RCC COLUMN etc., using Mild steel sheets of Suitable size and BG 10 stiffened with Welded mild Steel etc., | 14 | m2 | 1,250 ₹17,500 Lowest | 1,300 ₹18,200 |
| 7.00 | Supplying, cutting, bending and placing of reinforcement stel of MS, HYSD bars for all type of RCC works at all levels including cost of 18 gauge GI binding wire cost, labour etc., as per design and details complete. | 3 | qtl | 9,000 ₹27,000 Lowest | 9,000 ₹27,000 Lowest |
| 8.00 | REINFORCED CEMENT CONCRETE 1:1 1/2 :3 (One cement, one and Half sand and three aggregate) using 20mm gauge hard broken granite stone jelly for FOUNDATION and BASEMENT including laying Consolidating finishing curing etc., Complete Complying with Standard Specification | 2 | m3 | 9,000 ₹18,000 Lowest | 9,000 ₹18,000 Lowest |
| 9.00 | Brick work in cement mortor 1:5 mix (one cement,five sand) using II class table moulded bricks to a size of 9"x4 3/8"x2 3/4" including cost and conveyance of all materials and labour charges for mixing the mortor, constructing, curing to required period and wherever the masonry projection is necessary for elevation shall be done with out extra cost etc complete as per std spn. | 8 | m3 | 7,300 ₹58,400 Lowest | 7,500 ₹60,000 |
| 10.00 | Plastering with cement mortor 1:5 mix (1 part cement and 5 part sand) using 20mm thick | 47 | m2 | 550 ₹25,850 Lowest | 600 ₹28,200 |
Tender Value
₹5.5 L
EMD Value
₹5,500
Closing Date
8 Jan 2025, 3:00 pmClosed
Assistant commissioner west zone
west zone, coimbatore corporation
Reconstruction of compound wall in KK pudur elementery school in ward no 45 of west zone.
2024_MAWS_515431_40
E6/WESTZONE/2024
Open Tender
Civil Works
Works
90 days
west zone, coimbatore corporation
As per the tender document attached
4 documents required · 4 mandatory
₹0
₹5,500
19 May 2026
3 Jan 2025
9 Jan 2025
3 Jan 2025
8 Jan 2025
3 Jan 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.02 MB
BOQ_614259.xls
BOQ • 0.34 MB
Building.pdf
Tender Documents • 0.70 MB
CONDITIONS.pdf
Additional Documents • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .