| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | ₹4.9 L | L1 | Accepted-AOC Low Level Quoted |
| 2 | Rejected-Technical | - | - | Rejected-Technical High Level Quoted |
| Sl No | Description | Qty | Unit | SANKAR CONSTRUCTION WORK L2 | V.GOPINATHAN L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, in hard stiff clay, stiff black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B | 89.02 | Cum | 264 ₹23,501.28 | 263.7 ₹23,474.57 |
| 2.00 | Supply and filling foundation and basement with filling sand in layer not more than 15cm,thick well ramed,watered and compacted complete complying with standard specification | 6.92 | Cum | 1,737 ₹12,020.04 | 1,736.5 ₹12,016.58 |
| 3.00 | CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification. | 7.09 | Cum | 5,454.8 ₹38,674.53 | 5,454.1 ₹38,669.57 |
| 4.00 | Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 31.31 | Cum | 5,761.5 ₹1.8 L | 5,760.5 ₹1.8 L |
| 5.00 | Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete | 167.66 | Cum | 547.8 ₹91,844.15 | 547.2 ₹91,743.55 |
| 6.00 | Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 0.9 | Cum | 6,855.5 ₹6,169.95 | 6,854.5 ₹6,169.05 |
| 7.00 | Reinforced Cement Concrete 1: 1 1/2: 3 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 3.14 | Cum | 9,358.7 ₹29,386.32 | 9,357.7 ₹29,383.18 |
| 8.00 | Supplying and fabricating and placing in position of Mild /Tor steel for all RCC works as per the design given including cost of all steel,binding wire and labour forfabrication etc.,complete complying with standard specification | 0.35 | Sqm | 91,933 ₹32,176.55 | 91,932 ₹32,176.20 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.
{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 74,549.77 ₹74,549.77 | 74,518.91 ₹74,518.91 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
24 Dec 2025, 5:30 pmClosed
Block Development Officer,Uthiramerur
Block Development Office,Uthiramerur
Construction of RCC Slab Culvert in Mariyamman Koil Street At Nancheepuram Panchayat
2025_RDTN_634547_1
R.C.No.179/2025 A17- Dt 24.11.2025
Open Tender
Civil Works
Uthiramerur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,000
21 Jan 2026
19 Dec 2025
24 Dec 2025
19 Dec 2025
24 Dec 2025
19 Dec 2025
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, in hard stiff clay, stiff black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B
Supply and filling foundation and basement with filling sand in layer not more than 15cm,thick well ramed,watered and compacted complete complying with standard specification
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete
Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Reinforced Cement Concrete 1: 1 1/2: 3 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and fabricating and placing in position of Mild /Tor steel for all RCC works as per the design given including cost of all steel,binding wire and labour forfabrication etc.,complete complying with standard specification
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_759287.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.10 MB
Schedule.pdf
Tender Documents • 0.38 MB
BOQ_759287.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid