Tender Value
₹16.1 Cr
EMD Value
₹8.2 L
Closing Date
30 Aug 2023, 3:00 pmClosed
SE
B48, Alagesan nagar, Chengalpattu
Construction of High level Bridge connecting the villages Poondy and Palankoil across Cheyyar River
2023_HWAY_351435_1
TN.No.19/SI.No.01/ 2023-2024 / SDO
Open Tender
Civil Works - Bridges
665 days
Tiruvannamalai
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹8.2 L
Off SEHNRR Chengalpattu
7 Dec 2023
31 Jul 2023
31 Aug 2023
31 Jul 2023
30 Aug 2023
31 Jul 2023
21 Aug 2023
Amount
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank, with all leads and lifts as per SS 20B, including cost of all labour equipments all other incidental charges such as bailing out water, shoring, strutting, walling & forming protective bunds wherever necessary etc., complete as per relevant standard specifation, for FOR FOUNDATION OF ABUTMENTS AND PIERS as per Section 300,304 of MORT&H specifications
Providing and driving in position permanent MS liners 6mm thick for piles from bottom of pilecap as per Cl.709.1.4 of IRC 78-2014 including cost of liners and fabricating, welded construction with consumable, labour and plants and driving to be left permanently with the pile shaft as per requirement and as per standard specification, and placing them in position with all leads and lifts etc., complete as per sections 1100 & 1600 of MORTH Specification (V revision)
Vibrated reinforced cement concrete of grade M35 (Design mix) using 20mm ISS HBG graded metal Bored-cast-in-situ piles of 1200mm diameter, as per Cl.709.1.9 of IRC:78-2014, including cost and conveyance of all materials to site and cost of cement at site but excluding cost fabrication of steel and placing it in position before concreting setting up of piling equipment, shifting the same for one pile location to another pile location dismantling and including all labour for boring through all soils, leading the excavated earth to a distance 200 m including forming of working platform over the river bed for accomadating piling equipment forming approaches to the working paltform, mixing concrete, filling it in position by tremie pipe, cutting of pile head to cut-off level for casting pilecap, including diversion of water course if necessary and all other incidental charges etc., complete as per standard specifications, forming and maintaining protective bunds and all other incidental charges etc., complete for PILES BELOW ABUTMENTS AND PIERS as per Sections 1100 & 1700 of MORT&H Specifications (Fifth Revision).
Plain Cement Concrete M15 (Nominal mix ) using 40mm ISS HBG metal , including cost and conveyance of all materials to site and cost of cement at site,including Potable water lablour charges for mixing, transporting Concrete, laying, hire charges for Tools and plants , compacting, curing with all leads for soft water, including all other incidental charges, form work etc., complete For LEVELLING COURSE Below Pile Cap of Abutments&Piers as per section 1000, 1500,1700 of MORTH&H Specifications(fifth revision)
Vibrated Reinforced Cement Concrete of grade M 35 (Design mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site excluding cost and fabrication of steel and also including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at heights, and hire charges for Tools and Plants including all other incidental charges, etc.,complete, for PILE CAPS under ABUTMENTS RETURN WALLS AND PIERS as per section 1100, 1500, 1700 of MORTH&H Specifications(fifth revision)
Vibrated Reinforced Cement Concrete of grade M 35 (Design mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site excluding cost and fabrication of steel and also including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at heights, and hire charges for Tools and Plants including all other incidental charges, etc.,complete, for SUB STRUCTURE - ABUTMENT and RETURNS as per section 1500,1700 & 2200 of MORTH&H Specifications(fifth revision)
Vibrated Reinforced Cement Concrete of grade M 35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement to site but excluding cost and fabrication of steel but including cost of form work, soft water, labour charges for mixing, transporting, laying and curing concrete, potable water, working at heights, hire charges for Tools and Plants including all other incidental charges, etc.,complete, for BED BLOCK CUM DIRT WALL OVER ABUTMENTS as per section 1500, 1700 & 2200 of MORT&H specification (V Revision)
Vibrated Reinforced Cement Concrete of grade M 35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement to site but excluding cost and fabrication of steel but including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for Tools and Plants including all other incidental charges, etc.,complete, for PIERS 1800mm dia as per section 1500, 1700 & 2200 of MORT&H specification (V Revision)
Vibrated Reinforced Cement Concrete of grade M 35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement to site but excluding cost and fabrication of steel but including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for Tools and Plants including all other incidental charges, etc.,complete, for CAPPING BEAM OVER PIERS as per section 1500, 1700 & 2200of MORT&H specification (V Revision)
Providing and Fixing of ELASTOMERIC BEARING of size 500X 300X 80mm including cost and conveyance to work site, labour for fixing the bearing in position and all other incidental charges etc., complete as per section 2000 of MORT&H specification (V Revision) and IRC 83-2015 (Part II)
Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing transporting, laying, curing concrete, vibration charges,working at heights , soft water and hire chargesfor tools and plants, including all other incidental charges etc, complete as per relevant standard spectification for T-BEAMS and CROSS BEAMS as per section 1500,1700 & 2300 of MORT&H specification (V Revision)
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site,but excluding cost and fabrication of steel but including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, working at heights, soft water, hire charges for tools and plants, including all other incidental charges, etc., complete for DECK SLAB, KERB and FOOTPATH as per cl 1500,1700 & 2300 of MORT&H specification (V Revision)
Vibrated Reinforced Cement Concrete of grade M 30 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials and cost of cement to site but excluding cost and fabrication of steel but including cost of form work, soft water, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for Tools and Plants including all other incidental charges, etc.,complete for Hand rails and Posts ,as per section 2703-3 of MORT&H specification (V Revision)
Vibrated Reinforced CementConcrete M40 (Design mix) using 20 mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing ,transporting, laying, curing concrete, working at heights, soft water, hire charges for Tools and Plants, including all other incidental charges, etc., complete for CRASH BARRIER on inner edge of footpath as per cl 811, 1700 & 2703.3 of MORT&H specification (V Revision)
Vibrated Reinforced CementConcrete M40 (Design mix) using 20 mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing ,transporting, laying, curing concrete, working at heights, soft water, hire charges for Tools and Plants, including all other incidental charges, etc., complete for CRASH BARRIER over Return walls per cl 811, 1700 & 2703.3 of MORT&H specification (V Revision)
Providing and fixing of G.I DRAINAGE SPOUTS 100mm dia as per GOI drawing SD/205 with grating arrangements at top as shown in the drawing and 100mm dia drainage spout projecting atleast 300mm beyond the bottom of deck slab as shown in the drawing, including cost and conveyance of Galvanised iron pipes and flats and fixing them in position, etc, complete as per cl 2705 of MORT&H specification (V Revision)
Supplying and installation of STRIP SEAL EXPANSION joint system confirming to specifications for road and bridge works published by Ministry of Surface Transport (Road Wings)in the 40mm wide expansion gap provided in between decks over piers and in between deck and dirt wall over abutment with fatigue tested structural steel section at the nosing and anchorage assembly including cost and conveyance of all materials, cost of testing as per the MORTH specification, including labour, equipment and incidental charges for fixing the joints complete in all respects, as per section 2600 of MORT&H specification (V Revision)
Vibrated Cement Concrete M15 (Nominal mix ) using 40mm ISS HBG metal , including cost and conveyance of all materials to site and cost of cement at site,including all lablour charges for mixing Concrete, laying, hire charges for Tools and plants , compacting, curing with all leads for soft water, including all other incidental charges, form work etc., complete,For BASE COURSE Below Approach Slab and Foot Path Ramp as per cl 1500, 1700 & 2704 of MORT&H specification (V Revision)
Vibrated reinforced Cement Concrete M30 (Design mix) using 20 mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel but including labour charges for mixing , laying, curing concrete, working at heights, soft water, hire charges for Tools and Plants, including all other incidental charges, etc., complete for APPROACH SLAB as per cl 1500, 1700 & 2704 of MORT&H specification (V Revision)
Vibrated cement concrete M30 (Design mix) 75 mm minimum thick with surface reinforcement using 20mm,12mm, 6mm ISS HBG graded Metal, including cost and conveyance of all materials to work site including all labour charges for mixing and laying, hire charges for tools and plants, compacting, curing with leads for softwater, including all other incidental charges formwork, cost of premoulded expansion joints and fixing the same in position etc, complete for WEARING COAT over DECK SLAB and APPROACH SLAB as per cl 2702.2 of MORT&H specification (V Revision)
Providing weep holes with CLASS I PVC seepage pipes of 100 mm dia of required lengths for abutments and return walls including costs and conveyance of all materials to work site and labour charges for fixing , etc., complete to drain the backfill as per cl 2706 of MORT&H specification (V Revision)
Providing FILTER MEDIA behind Abutment and Return walls for 600mm thickness using filter material well packed with smaller size towards the soil and bigger size towards the wall including cost and conveyance to worksite including all other incidental charges, etc complete as per cl 710.1.4 & Appendix 6 of IRC 78- 2014
FILLING BEHIND ABUTMENTS AND RETURNS with clean gritty free draining gravel including cost and draining gravel having PHI value more than 35 conveyance of gravel to worksite , laying, handling charges and filling in layers tamping under optimum moisture content to get the maximum density, including watering, with all leads and lifts for water and all other incidental charges, etc., complete as per cl 710.1.4 & Appendix 6 of IRC 78- 2014
Supply and fabrication of Fe-500D (HYSD) steel required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening, cutting, bending, tying grills, including over laping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges, etc., complete as per cl 1600 of MORT&H specification (V Revision)
Supply and fabrication of Fe-240 steel required for all RCC items and works in the schedule including cost of steel at site cost of providing and cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills including lapping to the required length wherever necessary and providing to the reinforcement, placing the reinforcement in position as specified in the drawings including cost of binding wire ,provision of spacer bars, cover blocks and all other incidental charges etc complete.as per cl 1600 of MORT&H specification (V Revision)
Providing and fixing CLASS I PVC duct pipes of 160 mm dia of required lengths including costs and conveyance of all materials to work site and labour charges for fixing and including all other incidental charges etc., including all other incidental charges complete to as per cl 2706 of MORT&H specification (V Revision)-BELOW Footpath
Formation of Approach Road: Construction of Embankment using CBR value of 8 with an average lead of 5.00 Km including cost and conveyance of carted earth to worksite including labour charges for filling in layers as specified by the departmental officers including watering with all leads for water including labour charges for compacting, tamping, ramming under optimum moisture, content to obtain the maximum density and all other incidental charges etc., complete as per standard specifications given in table 300-2 of MORT&H 95 % PD
Construction of Embankment using CBR value of 8 with an average lead of 5.00 Km including cost and conveyance of carted earth to worksite including labour charges for filling in layers as specified by the departmental officers including watering with all leads for water including labour charges for compacting, tamping, ramming under optimum moisture, content to obtain the maximum density and all other incidental charges etc., complete as per standard specifications given in table 300-2 of MORT&H 97% PD
Construction of Granular Sub-Base Grade V of 150mm thick by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete for formation of Approach road as per clause 401 of MORT&H Rev 5 (Specification Number as per MORT&H Rev.V 111,112,401,900)
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete for formation of Approach road as per clause 406 of MORTH Rev-5 (Specification Number as per MORT&H Rev.V 111,112,406,900)
Providing and laying Prime Coat over WMM surface using 7Kg of Emulsion Bitumen (SS1) per 10sqm for pre paratory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete for formation of Approach road as per Clause 502 of MORTH Rev-5 (Specification Number as per MORT&H Rev.V 111,112,502,900)
Providing and laying Tack Coat over primed surface (treated with primer) using 2.50Kg of Bitumen Emulsion (RS1) per 10sqm for preparatory to another bituminous construction overit including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete for formation of Approach road as perClause 503 of MORTH Rev-5 (Specification Number as per MORT&H Rev.V 111,112,503,900)
Providing and laying Bituminous Macadam 50 mm thickness which work shall consist of construction, using crushed aggregates, premixed with VG 30 Grade Bitumen at the rate of 4.00% by weight of the total mix confirming to the aggregates and binder as per the job mix formula in the Hot mix plant, transporiting the mix to the worksite, laying with paver finisher and compaction with smooth wheeld and vibratory roller in accordance with the requirements of the specification and in confirmity with the drawing as directed by the Engineer for BM . as per MORTH No. 111, 112, 504, 900.
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP for formation of Approach road as per clause 507 of MORTH Rev-5 (Specification Number as per MORT&H Rev.V 111, 112, 507, 900)
RCC Retaining Wall at A1 & A2 Side: Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all other incidental charges such as baling out water providing and maintaining necessary cofferdams, sheeting, shoring, bracing, and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc, complete as per relevant standard specification for FOUNDATION OF RETAINING WALLS as per clause No.304 of MORT&H Vth rev..
Plain Cement Concrete of Grade M-10, Nominal Mix, 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for BASE COURSE BELOW FOOTINGS OF RCC RETAINING WALLS as per clause No.1000, 1500, 1700 of MORT&H Vth rev.
Vibrated Reinforced Cement Concrete M-30, (Design Mix) using 20mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost cement at site excluding cost and fabrication of steel, but form work and centering soft water, labour charges for mixing transporting, placing in position vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete for FOOTINGS OF RCC RETAINING WALLS as per clause 1000, 1500, 1700 of MORT&H Vth rev.
Vibrated Reinforced Cement Concrete M-30, (Design Mix) using 20mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost cement at site excluding cost and fabrication of steel, including form work and centering soft water, labour charges for mixing transporting, placing in position vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete for STEM OF RCC RETAINING WALLS. Below ground level as per clause No.1000, 1500, 1700, 2200 of MORT&H Vth rev.
Vibrated Reinforced Cement Concrete M-30, (Design Mix) using 20mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost cement at site excluding cost and fabrication of steel, but form work and centering soft water, labour charges for mixing transporting, placing in position vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete for STEM OF RCC RETAINING WALLS. Above ground level as per clause No.1000, 1500, 1700, 2200 of MORT&H Vth rev.
Vibrated Cement Concrete of Grade M-15, Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of form work, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for Broken Parapet as per clause No.1000, 1500, 1700 of MORT&H Vth rev
Providing and fixing seepage pipes of 100mm dia. PVC pipes of required lengths including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the backfill IN RETAINING WALLS as per clause No.2706 of MORT&H Vth rev.
Supply and Fabrication of High Yield Strength Deformed Bar with Grade Designation Fe-500D, conforming to IS:1786-1985, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length wherever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete,Fe-500 D grade as per clause No.1600 of MORT&H Vth rev
PCC Retaining wall at A1 Side Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF RETAINING WALL as per clause No.304 of MORT&H Vth rev.
Vibrated Cement concrete of Grade M-20, Nominal mix, 1:1.5:3, using 40mm ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost and labour charges for formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants including all other incidental charges etc, as per relevant standard specification for BASE SLAB BELOW BODY WALL OF RETAINING WALL as per clause 1000, 1500, 1700. of MORT&H Vth rev.
Vibrated Cement concrete of grade M20 Nominal mix using 40mm ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost and labour charges for formwork, soft water labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants including all other incidental charges etc, as per relevant standard specification for STEM OF RETAINING WALL (Below Sill) as per clause No.1000, 1500, 1700, 2200 of MORT&H Vth rev.
Vibrated Cement concrete of grade M20 Nominal mix using 40mm ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost and labour charges for formwork, soft water labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants including all other incidental charges etc, as per relevant standard specification for STEM OF RETAINING WALL (Above Sill) as per clause No.1000, 1500, 1700, 2200 of MORT&H Vth rev.
Vibrated Cement Concrete of Grade M-15, Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of form work, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for Broken Parapet as per clause No.1000, 1500, 1700 of MORT&H Vth rev
Providing and fixing of Seepage Pipes of 100mm dia. using PVC pipes of requied lengths including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arangements with 100mm size broken granite metals at the periphery and labour charges for fixing, etc., to drain of the backfill in the RETAINING WALL as per clause No.2706 of MORT&H Vth rev.
Painting: Painting two coats with approved Cement Paint over the priming coat surface using first class cement paint over the cement plastered surface including cost and conveyance and all labour charges for cleaning, preparing the surface painting and curing all etc., complete.
Painting two coats with ready mix Plastic Enamal Paint using first quality plastic enamal paint over the priming coat surface over the cement plastered surface including all cost and conveyance and all labour charges for cleaning, preparing the surface, painting and curing etc., complete.
Sub Total Bid Price (in figures)
GST @ 18% of above all Schedules (in figures)
RELIABLE STAR CONTRACTING
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid