RE ADB Project Division No. 1 PWD B and R Rewari
RE ADB Project Division No. 1 PWD B and R Rewari
IRQP/PR on Rewari-Sohna-Palwal Road of NH-71B (New NH-919) from Km 50.800 to 54.00 in Gurugram District.(Re-Invited)
2020_HRY_116939_1
RSP Road NH-71B (New NH-919) Km 50.800 to 54.00
Open Tender
Civil Works - Roads
Works
90 days
Rewari
Please refer Tender documents.
4 documents required · 4 mandatory
₹15,000
Yes
RE ADB Project Division No. 1 PWD B and R Rewari
₹3.0 L
Yes
4 Jun 2020
3 Feb 2020
26 Feb 2020
3 Feb 2020
24 Feb 2020
3 Feb 2020
Amount
Preparation of berms including filling of earth work, excavation and cutting of earth in all kind of soils including dressing the bank, side slope to given levels and templates after breaking of clouds, including the cost of rolling and watering all allowances for labour hardness wetness irrespective of all lead and lift, but including Compensation for earth taken from private land, fields etc. and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305 and to the entire satisfaction of the Engineer of the work conforming to PWD specification No. 6.2 and 6.3 and 3.2 and the other specification 1990 Ist edition. As per X-section attached at DNIT. Note:-No earth work will be allowed to be taken from PWD B&R/ ROW except for surplus earth after approval from Engineer.
Providing and laying Bituminous tack coat with bitumen grade (VG-10) using 2.00 Kg. per 10 Sqm area on existing bituminous surface complete in all respect including cost of bitumen VG-10 as per clause No. 503 of MORT&H specification for road and bridge works (5th revision of 2013/ latest edition . Instruction issued from time to time regarding bitumen VG-10 will be followed strictly.
Providing & Laying 30 mm compacted thickness of Bituminous Concrete (BC) in one layer with 80-100 THP batch type hot mix plant with bituminous binder CRMB -55 @ 5.4% (minimum) and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory or with pneumatic tyred roller of 12 to 15 tonne weight with a tyre pressure of at least 0.56 MPa and tandem rollers to achieve the desired compaction as per MORT&H specification (Vth revision) 2013 clause No. 507 complete in all respect. If bitumen required is more than 5.4 % as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work. Thickness of BC laid over the existing Black Top surface is to be adjusted in such a manner that a camber of 2.5 % is achieved . Any extra quantity over and above the quantity provided in the DNIT, required to camber shall be incidental to work Note :- Before laying BC on existing road surface, any existing pot holes and cracks shall be repaired and sealed in accordance with clause No. 3004.2 and 3004.3. proper measurement and consumption shall be entered in M.B but no payment on this account shall be made these are incidental to work. Note :- Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS-6241. If coating and stripping of bitumen aggregate mix is less than 95% anti-stripping agent will be used by contractor. The anti –stripping agent should conform to the requirement as stipulated in IS14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in Charge in writing before start of work. A proper record of result be maintained and same shall be submitted along with bills by the contractor.
Providing and marking center line/side line 2.5mm thick (Minimum) and other marking as per drawing and direction of Engineer in Charge with hot applied thermoplastic and marking paint 10 cms wide ( Centre Line) 15 cm wide (Edge line) complete in all respect as per the dimensions given in IRC 35, furnishing all labour, materials, tools equipments including all incidental costs necessary for carrying out in work at site conforming to the technical specification as clause No. 803 of MORT&H specification for road and amp; bridge works (5th revision) of 2013 / latest edition . Each container of the thermoplastic paint material shall have the name, trademark or other means of identification of manufacturer, batch number, date of manufacture, color maximum application temperature and maximum heating temperature . The thermoplastic paint material shall be Asian Paint – Apemark/ Berger- Sigmare/Prismo. The glass bead shall be of Potters / Sovitec/ Flexolite. The thermoplastic material shall be sampled and tested in accordance with appropriate ASTM/BS method. The contractor shall furnish to the Engineer-in-charge a copy of certified test reports from the manufacturer of the thermoplastic material showing all tests specified and shall certify that the material meet all requirement of the specifications. The Reflextorizing glass beads shall meet the requirement of clause 803.4.2. and test methods mentioned in clause 803.4.2.4 shall be meticulously followed. The minimum thickness specified is exclusive of surface of glass beads. The method of thickness measurement shall be in accordance with appendix B and C of BS:3262 (Part-3)
Pavement Marker ( Cat Eyes) Moulded shank raised pavement markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing internal reflection of the light entering the lens face and shall support a load of 16000 KG tested in accordance to ASTM D4280 type H and complying to specifications of Category A of MORT&H circular No. W/NH/33023/10-97-DOIII dated 11.06.1997. The Height width and length shall not be exceed 50mm, 100mm and 100 mm and with minimum reflective area of 13 Sqcm. On each side and the slope to the base shall be 35+/- degree. The strength of detachment of the integrated cylindrical shanks, ( of diameter not less than 19+/-2mm and height not less than 30+/-mm) from the body is to be a minimum value of 500kg. fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the engineer ( of reputed make such as Avery Dennison/3 M)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .