Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹90.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹77.3 L+₹78,563 (1.03%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹90.7 L
EMD Value
₹56,000
Closing Date
18 Sept 2024, 3:00 pmClosed
Executive Officer
Arulmigu Pragatheswarar temple at Kadanthankudi Village, Pattukkottai Taluk, Thanjavur District.
New Construction Of Vinayagar, Murugan Sannathi, Compound wall, Madapalli and All round Praharam Flooring in Arulmigu Pragatheswarar temple at Kadanthankudi Village, Pattukkottai Taluk, Thanjavur District.
2024_HRCE_478925_1
01/2024/Kadanthankudi
Open Tender
Civil Works - Others
Item Rate
270 days
Arulmigu Pragatheswarar temple at Kadanthankudi
Please refer tender Documents
6 documents required · 6 mandatory
₹0
₹56,000
12 Mar 2025
30 Aug 2024
18 Sept 2024
30 Aug 2024
18 Sept 2024
30 Aug 2024
Amount
Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement concrete 1:5:10 (One cement, five sand and ten hard broken granite stone jelly) using 40mm HBG metel as foundation concrete including dewatering wherever necessary and laid in layers of not more than 15cm. thick complying with std specification.
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
For grade beam basement
Providing and laying in position, Standardised Concrete Mix M20 Grade in accordance with IS 456:2000 using 20mm and down graded hard broken granite stone jelly for all rcc works with minimumm cement content 325Kg/m3 and maximum water cement ratio of 0.55, including admixture(plasticiser/super plasticiser) in recommanded proportions as per IS 9103 to acclerate, retard setting of concrete, improve workability with out i paring strength and durability with about (5 cum) 7730 Kg of 20mm machine crushed stone jelly and with about (3.3 Cum) 5156 Kg of 10 12mm machine crushed stone jelly and with about (4.79cum) 7670 Kg of sand, but excluding cost of reinforcement grill and fabrication charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing etc and providing fixtures like fan clamps in RCC floor/ roof slabs wherver necessary without claming extra complete complying std specification and also directed by departmental officers. The coarse and fine aggregates to be used should comply with requirements of IS standards(No Seperate payment will be made by the department for excess usage of materilas).
a)For foundation and basement
Supplying , Fabrication and placing in position of M.S. or RTS rods reforcement grill in position for all RCC works including cost of steel rods and binding wire etc., complete
Brick masonary LM1:2 using Stock bricks including all varivargams, mould sthambams mokopathrams, koodu, Nasi and all ornamental brick work complete, all pancharams Agarais, Karanakoodu, etc., forming core walls of Rajagopuram / Vimanam complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete 100 cft for Kalkaram .
For kalkaram of Up to 15'
Vimanam / gopuram of ht. Up to 15' excluding Kalkaram
Brick work in lime Mortor 1:2 using country brick of size 83/4"x41/4"x23/4" including cost and conveyance of all materials and labour charges and all other incidental charges etc completc complying with standard specification.
Plastering with Lime mortar 1:1.5, (One part of Lime and One and half part of sand ) 12mm thick including cost and conveyance of all materials and all labour charges,curing etc,complete complying with standard specifications.
Supply of cut stone for carrying out Pavukkal , Uthiram and all hire charegs for all tools and plants and clearing the site after completeion of work etc., complete.
Labour Charges for the Pavukkal (New Stone ) including pointing with lime mortar 1:1.5 (One part of Lime and One and half part of sand ) Labour conveyence and handling as per insruction of dept officers
Labour Charges for the Steps (New Stone ) including pointing with lime mortar 1:1.5 (One part of Lime and One and half part of sand ) Labour conveyence and handling as per insruction of dept officers
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime Mortor1:1:5 complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Lime Mortor1:1:5 and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. for kalkaram..
For kalkaram of Up to 15'
Vimanam / gopuram of ht. Up to 15' excluding Kalkaram
Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with coconut keeth coverings, providing ladder arrangements, country wood pland for working, inpection etc, complete hire charges only for erection, maintainance and removing the same on completion of the work 1 sq,ft..
Painting with multicolour (Panchavarnam) good water based exterior emulson paints complete for the Vinamans/Gopurams, including cost and conveyance of all materials, lobour charges including Artist painter, working in heights, lifting of material, cost of brushes etc, complete-which including all extra for foldings-100sft, superficial area.
Providing and laying Flooring with cut stone slab of size 600mmX600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and lobour charges for paving and Pointing With Lime Mortor1:1:5 etc complete.
Supplying & fixing Teak wood temple type door including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete with std. Specifications
Varnishing new and old wood work two coats of approved quality in all floors the rate includes cost of all materials brushes scaffolding charges etc..
Providing new sudhai vigrahams in the vimanams and Rajagopurams with galvanised iron rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in Lime Mortor 1:3 finishing the same with Lime Mortor 1:3 bringing to the correct shape (Lakshana) in conformift with silpa sastra inclusive of special ornaments, wiapons, peedam etc., complete and providing C.M. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and G.I. rods.binding wire all labour for working in heights, curing lifiting of materials etc., complete including cement painting 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is pt\rovided the rate with peetam may be adopted as datailed hereunder)
Sudhai size above 2' 6" upto 3' 6"
Painting two coat with approved water based Exterior Emulsion over the cement plastered wall surface, ceiling and other new surface including clearing preparing the surface curing in all floors including brushes etc., complete as per specification. -10 m 2 ( S.I. No 358 )
Sub total
M.Ramamoorthy (BID ID -1139404)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_568961.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .