Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹9 LAccepted-AOC | L-1 | Accepted-AOC Lowes Negotiated Rate | |
| 2 | L-2₹13.4 L+₹4.4 L (48.8%)Rejected-Finance | L-2 | Rejected-Finance L-2 bidder | |
| 3 | L-3₹13.7 L+₹4.7 L (52.7%)Rejected-Finance 0 ISLAMPUR BELDHA DEVIPUR TANDA AMBEDKAR NAGAR UTTAR PRADESH 224190 | AMBEDKAR NAGAR | UTTAR PRADESH | 224190 | L-3 | Rejected-Finance L-3 bidder |
Tender Value
Refer Docs
EMD Value
₹24,000
Closing Date
20 Jan 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE O and MC-V, ATPS, Anpara
Office of SE O and MC-V ATPS, Anpara
Breakdown maintenance of Travelling Trippers, various Gear boxes, Belt feeders, Vibro feeders and Vibrating screen installed in CHP,3x210MW, ATPS, Anpara
2020_RVUNL_538408_1
22/CHD-II/ATPS/2020-21
Open Tender
Miscellaneous Works
Fixed-rate
365 days
CHP 3X210MW, ATPS, Anpara
As per PQC
3 documents required · 3 mandatory
₹590
Dy CAO CFA andBO ATPS
₹24,000
Yes
21 Apr 2021
16 Dec 2020
22 Jan 2021
16 Dec 2020
20 Jan 2021
16 Dec 2020
16 Dec 2020 - 20 Jan 2021
120 days
Amount
TRAVELLING TRIPPER (02 nos.)
Replacement of damaged/ distorted transmission wheel of tripper
Replacement of damaged bearing of tripper carriage shaft.
Replacement of damaged Plummer block of tripper carriage shaft.
Attending oil leakage of gar box by providing gasket etc.
Repairing of main drive chain link
Replacement of main drive chain link
Replacement of drive chain of cable reeling mechanism.
Repairing of driven chain of cable reeling mechanism.
Repairing of driven teeth of main drive/ driven sprockets by welding and grinding
Repairing of drive / driven teeth of cable reeling mechanism
Replacement of sprockets drive/ driven of cable reeling mechanism
Re-alignment of sprockets drive / driven of cable reeling mechanism
Re-alignment of main drive of travelling tripper i.e., motor gear box, drive and driven sprocket
Removal of fouling of tripper wheel with structure
Strengthening of tripper structure whenever required by providing additional angle, channel and ribs etc.
Replacement of damaged bibby coupling along with proper alignment
Replacement of brake shoe liner
Removal of jamming of cable guide roller assembly
Checking of re-alignment and leveling of rail track of tripper.
Replacement / Re-fixing of rail scrapper
Re-alignment of bunker sealing belt by adjusting roller and tension of belt.
Straightening of vertical post of tripper rail by providing stiffeners etc.
Replacement of damaged bearing / Plummer block of rollers of bunker sealing belt.
Replacement of brake assembly mechanism
Repairing of gear box body of tripper by grinding & welding
Repairing of guards & Hand railing of tripper
Replacement of complete gear box by new one/ by taken out gear box from other tripper
Replacement of transmission shaft
Providing of stiffeners in distorted transmission wheel by cutting and welding
Replacement / repairing of shaft of bunker sealing belt roller by cutting & welding
Repairing of shaft of cable reeling drum by welding, grinding and making hole for lock in shaft.
Repairing of brake shoe liner
Repairing of tripper brake drum by welding and grinding
Revisioning of bearing, CRD sprocket assembly
Tightening of check nut of Plummer block of TT shaft.
Re-welding and grinding of stiffeners of TT Wheel.
Replacement of bunker sealing belt rollers of tripper
Replacement of bent / damaged ISMC of size 200 mm of carriage drive Plummer block base frame after jacking of TT by cutting, grinding & welding etc.
Replacement of spring of bibby coupling
GEAR BOXES (conveyor system, crushers)
Replacement of gear box unit by new / taken out from other equipment
Repairing of gear box body by grinding and welding.
Replacement of damaged bearing of input shaft / intermediate shafts/ output shaft by dismantling the complete gear assembly and its re-alignment with driven equipment and motor also.
Replacement of Input shaft / intermediate shafts / output shaft by dismantling the complete gear box assembly and its re-alignment with driven equipment and motor also.
Replacement of oil seals of input / output shaft of gear box by dismantling the complete gear box assembly and its re-alignment with driven equipment and motor also.
Overhauling of gear boxes of conveyor system, belt feeders & primary crushers. This involves opening of gear box cover, cleaning, minor repairs, checking of bearings, re-assembly, alignment & trial run. This will also include alignment of gear box with motor.
Attending oil leakage from gear box by providing gasket etc.
Opening of gear box upper housing for checking of input shaft bearing and checking nut of gear box
Replacement of damaged and distorted jack bolt of gear box by cutting and welding.
Changing of gear box assembly from left hand to right hand and vice –versa.
Removal and re-fixing of matching gear fitted into intermediate shaft.
Removal & Refixing of bearings of input shaft of gear box for repairing of housing, check nut and making thread.
Replacement of upper and lower housing of gear box with new one or by repaired one.
Removal and re-fixing of coupling fitted in input shaft of gear box.
VIBRATING SCREEN (4nos.)
Replacement of damaged supporting springs
Replacement of damaged bottom deck screen cloth
Replacement of damaged oil seals of bearings
Replacement of damaged bearing of drive shaft
Repairing of back cover plates by welding & cutting etc.
Re-fixing of detached back cover plates.
Checking & re-alignment of vibrating screen & motor
Leveling of vibrating screen by providing / removing packing etc.
Re-adjustment of stroke of vibrating screen by removing / adding counter screen weights
Replacement of damaged top deck mesh by welding / cutting
Repairing of damaged top deck mesh by welding / cutting.
Replacement of damaged bottom deck mesh by welding / cutting
Fabrication & fixing of holding down channel for bottom deck mesh
Elimination of any abnormal sound from vibrating screen.
Replacement of damaged sealing rubber
Attending leakage of grease from bearing housing by providing gasket etc.
Replacement of main shaft of vibrating screen by new one/ repaired one.
Repositioning, alignment and welding of spring supporting suspension shaft after dismantling hood etc. if reqd.
Repairing / repositioning of hood of vibrating screen by welding / cutting
Torque setting of all the H.T. bolts by torqe wrench at specified torque including bolts of screen mesh panels.
Replacement of damaged screen bar by cutting and welding
Repairing of damaged bar by welding
Replacement / repairing of damaged canopy of oil chamber by welding & strengthening of screen
Repairing of oil chamber leakage by grinding, welding
Attending oil leakage of inspection pipe of screen
Replacement / repairing of clit base of motor for proper alignment
Replacement of bearing housing of screen
Replacement of inspection pipe line of vibrating screen
Replacement of oil chamber in V.S. by new or by repaired one.
VIBRO FEEDERS (4nos. )
Replacement of damaged supporting spring.
Replacement of damaged gasket of oil chamber
Replacement of damaged bearing by new one
Re-adjustment of stroke of vibro feeder by changing drive pulley of motor
Leveling of vibro feeder by providing / removing packing below supporting springs bed.
Checking and re-alignment of motor with vibro feeder.
Replacement of damaged drive/ driven gears.
Replacement of damaged drive / driven shaft.
Replacement of Vibrator assembly after taking out from other vibro feeders.
Replacement of V-Belt pulley of motor whenever required.
Torque setting of all the HT bolts by torque wrench at specified torque.
Replacement of Pin bush / Plummer block of motor base frame by cutting & welding.
Replacement / Repairing of cracked motor base frame after cutting, grinding & welding etc.
BELT FEEDERS (08nos.)
Replacement of damaged takeup screw by new one after cutting and welding (size 40 x 60 mm)
Checking, re-alignment of complete drive unit i.e. motor, gear box and drive pulley.
FLUID COUPLING
Replacement of damaged driving(resilient plate) of fluid coupling.
Up to280KW
Above 280KW to 400KW
Above 400KW to 800KW
Replacement of defective/damaged multidisc of fluid coupling
Up to280KW
Above 280KW to 400KW
Above 400KW to 800KW
Replacement of defective/worn-out fluid coupling by new one/overhauled one
up to100KW
Above 100KW to 280KW
Above 280KW
Replacement of defective/worn-out fluid coupling by taking out coupling from equipment
up to 100KW
Above 100KW to 280KW
Above 280KW
Replacement of Oil seals/O-rings of fluid coupling by taking out the coupling, dismantling, reassembly and alignment
up to 100KW
Above 100KW to 280KW
Above 280KW
Attending minor oil leakage from various fluid coupling
Replacement of Bearing of fluid coupling by taking out the complete fluid coupling, dismantling, reassembly & alignment
up to 100KW
Above 100KW to 280KW
Above 280KW
6.6KV/0.4KV MOTOR ALIGNMENT
Realignment of gear-box unit assembly with drive unit and trial run up to 50KW.
Realignment of gear-box unit assembly with drive unit and trial run up to 100KW.
Realignment of gear-box unit assembly with drive unit and trial run up to 280KW.
Realignment of gear-box unit assembly with drive unit and trial run above 280KW.
Alignment of the crusher with motor.
M/S JISHA ENGINEERING CONSTRUCTION
SHIVA CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .