| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.3 LAccepted-AOC D NO 271D3 5 ANDAL PLOT NO 30 N0 76 DHARANI SQUARE PERAMANUR VILLAGE MARAMALI NAGAR CHENGALPATTU KANCHIPURAM 603 209 | CHENGALPATTU | KANCHIPURAM | TAMIL NADU | 603209 | ₹31.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹32.1 LRejected-AOC 002 1 NATHAKADU SRI MAHALAKSHMI DYEING PRINTING MILLS CAMPUS BHAVANI MAIN ROAD ERODE 638004 | ERODE | ERODE | TAMIL NADU | 638004 | ₹32.1 L | L2 | Rejected-AOC L2 |
| 3 | L3₹32.2 LRejected-AOC 10 208 MOTTOR PALLIPATTY PO MALLIKUNDAM VIA METTUR TK SALEMDT 636458 | METTUR | SALEM | TAMIL NADU | 636458 | ₹32.2 L | L3 | Rejected-AOC L3 |
| 4 | L4₹33.0 LRejected-AOC | ₹33.0 L | L4 | Rejected-AOC L4 |
| 5 | L5₹33.6 LRejected-AOC | ₹33.6 L | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | S RATHIKA CONSTRUCTIONS L4 | MK DHANALAKSHMI ENGINEERING PRIVATE LIMITED L1 | Vidhyut Nirman Corporation L2 | R K and Co L5 | M. Kumar Contractor L7 | M/s A.Chelladurai & Co L6 | M A M CONSTRUCTION L3 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in HGS and and depositing on bank with initial lead of 10 m and initial lift of 2 m in Hard stiff clay Stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders including cost of all lead lift labour charges etc complete | 210 | m3 | 100 ₹21,000 | 300 ₹63,000 | 250 ₹52,500 | 200 ₹42,000 | 80 ₹16,800 | 250 ₹52,500 | 86 ₹18,060 |
| 2.00 | Earth work excavating for foundation and depositing on bank with initial lead of 10m and initial lift of 2 m in soft disintegrated rock, laterite, soft rock (or) kankar not requiring blasting including cost of all lead lift labour charges etc complete | 27 | m3 | 200 ₹5,400 | 300 ₹8,100 | 250 ₹6,750 | 500 ₹13,500 | 150 ₹4,050 | 300 ₹8,100 | 97 ₹2,619 |
| 3.00 | Earth work excavating and depositing on bank with medium rock and dense rock not requiring blasting | 27 | m3 | 300 ₹8,100 | 300 ₹8,100 | 250 ₹6,750 | 500 ₹13,500 | 80 ₹2,160 | 400 ₹10,800 | 200 ₹5,400 |
| 4.00 | Filling the M sand for filling in the foundation and floor including cost of sand, filling charges as per standard specification(watering & consolidation with all leads and lifts etc., complete. | 69 | m3 | 1,500 ₹1.0 L | 1,900 ₹1.3 L | 750 ₹51,750 | 1,000 ₹69,000 | 410 ₹28,290 | 1,500 ₹1.0 L | 1,200 ₹82,800 |
| 5.00 | Plain cement concrete in CC 1:3:6, using 20 mm HBG metal, for foundation / Padding Concrete excluding form work including cost of all materials, labour charges including consolidation, curing, all leads, lifts, etc., as per standard Specification complete. | 54 | m3 | 5,800 ₹3.1 L | 6,000 ₹3.2 L | 6,250 ₹3.4 L | 6,000 ₹3.2 L | 13,000 ₹7.0 L | 6,000 ₹3.2 L | 5,500 ₹3.0 L |
| 6.00 | Reinforced cement concrete in CC 1:1½ :3, mix using 12mm to 20mm HBG downgraded metal machine crushed for RCC Footing including cost of cement, all materials, labour, curing, all leads,lifts,cost of shuttering as per Standard Specification. (But excluding cost of steel reinforcement.) | 65 | m3 | 12,000 ₹7.8 L | 7,000 ₹4.5 L | 11,000 ₹7.2 L | 10,500 ₹6.8 L | 14,750 ₹9.6 L | 9,000 ₹5.8 L | 9,000 ₹5.8 L |
| 7.00 | Reinforced cement concrete in C.C. 1:1 ½ :3 mix, using 12 to 20mm HBG machine crushed metal, for Cable duct cover slab with form work including cost of cement, all materials labour, curing, all leads & lifts, vibrating charges, including cost of centering, shutting, as per standard specification, etc., complete. ( but excluding cost of steel reinforcement) | 5.5 | m3 | 15,000 ₹82,500 | 15,000 ₹82,500 | 15,000 ₹82,500 | 11,500 ₹63,250 | 16,000 ₹88,000 | 10,000 ₹55,000 | 10,000 ₹55,000 |
| 8.00 | Reinforced cement concrete in C.C. 1:1 ½ :3 mix, using 12 to 20mm HBG machine crushed metal, for culvert Side wall with form work including cost of cement, all materials labour, curing, all leads & lifts, vibrating charges, including cost of centering, shutting, as per standard specification, etc., complete. ( but excluding cost of steel reinforcement) | 45 | m3 | 12,000 ₹5.4 L | 15,000 ₹6.8 L | 13,000 ₹5.8 L | 10,500 ₹4.7 L | 10,000 ₹4.5 L | 18,000 ₹8.1 L | 14,500 ₹6.5 L |
| 9.00 | Providing steel reinforcement with MS/RTS rods of reputed approved make for reinforced concrete works, including cost of steel MS/RTS rods, binding wire, Minor T & Ps labour charges for cutting, straightening bending as per type design drawing, placing aligning, and tying properly with all leads and lift etc., complete as per Standard Specification | 10,703 | Kg | 70 ₹7.5 L | 49 ₹5.2 L | 65 ₹7.0 L | 95 ₹10.2 L | 70 ₹7.5 L | 80 ₹8.6 L | 78 ₹8.3 L |
| 10.00 | Suppling , fixing and Labour charges cutting GI/MS angle and fixing in cable duct in proper alignment including labour lead lift etc,complete. | 486 | Kg | 120 ₹58,320 | 100 ₹48,600 | 80 ₹38,880 | 70 ₹34,020 | 20 ₹9,720 | 80 ₹38,880 | 150 ₹72,900 |
Tender Value
Refer Docs
EMD Value
₹40,100
Closing Date
15 Nov 2025, 2:00 pmClosed
SE GCC CBE
Office of the Superintending Engineer 182 Dr Subbarayan Street Tatabad Coimbatore 641 012
Providing Road Cable Duct arrangements at existing Irugur 110 11 KV SS for the extension of HT supply at 33 KV Voltage level to M s Bharat Petroleum Corporation Ltd
2025_EB_619808_1
ETS No. 44/25-26 of SE GCC Cbe
Open Tender
Civil Works
coimbatore
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹40,100
Yes
11 Mar 2026
4 Nov 2025
15 Nov 2025
4 Nov 2025
15 Nov 2025
4 Nov 2025
Amount
Earth work excavation for foundation in HGS and and depositing on bank with initial lead of 10 m and initial lift of 2 m in Hard stiff clay Stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders including cost of all lead lift labour charges etc complete
Earth work excavating for foundation and depositing on bank with initial lead of 10m and initial lift of 2 m in soft disintegrated rock, laterite, soft rock (or) kankar not requiring blasting including cost of all lead lift labour charges etc complete
Earth work excavating and depositing on bank with medium rock and dense rock not requiring blasting
Filling the M sand for filling in the foundation and floor including cost of sand, filling charges as per standard specification(watering & consolidation with all leads and lifts etc., complete.
Plain cement concrete in CC 1:3:6, using 20 mm HBG metal, for foundation / Padding Concrete excluding form work including cost of all materials, labour charges including consolidation, curing, all leads, lifts, etc., as per standard Specification complete.
Reinforced cement concrete in CC 1:1½ :3, mix using 12mm to 20mm HBG downgraded metal machine crushed for RCC Footing including cost of cement, all materials, labour, curing, all leads,lifts,cost of shuttering as per Standard Specification. (But excluding cost of steel reinforcement.)
Reinforced cement concrete in C.C. 1:1 ½ :3 mix, using 12 to 20mm HBG machine crushed metal, for Cable duct cover slab with form work including cost of cement, all materials labour, curing, all leads & lifts, vibrating charges, including cost of centering, shutting, as per standard specification, etc., complete. ( but excluding cost of steel reinforcement)
Reinforced cement concrete in C.C. 1:1 ½ :3 mix, using 12 to 20mm HBG machine crushed metal, for culvert Side wall with form work including cost of cement, all materials labour, curing, all leads & lifts, vibrating charges, including cost of centering, shutting, as per standard specification, etc., complete. ( but excluding cost of steel reinforcement)
Providing steel reinforcement with MS/RTS rods of reputed approved make for reinforced concrete works, including cost of steel MS/RTS rods, binding wire, Minor T & Ps labour charges for cutting, straightening bending as per type design drawing, placing aligning, and tying properly with all leads and lift etc., complete as per Standard Specification
Suppling , fixing and Labour charges cutting GI/MS angle and fixing in cable duct in proper alignment including labour lead lift etc,complete.
Labour charges for transporting all cable duct cover slab from the work site and laying over the cable duct in proper alignment including labour lead lift etc,complete.
Plastering with CM 1:3, 12 mm thick for Ceiling & Sunshade bottom including cost of cement, all materials, labour, curing, leads and lifts etc., complete.
colour washing with two coats using cement paint over one coat of white cemnet including through scrapping, clan removal of dirt, cost of all materials, labour, Lead, Lift etc., complete and including necessary crack filling paste, putty where ever required.
Disposal of Excess of surplus earth away in low lying area with a lead of 100 Mts including spreading and levelling labour, lead, lift as per standard specification, etc., complete.
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
Vidhyut Nirman Corporation (BID ID -1512530)
M A M CONSTRUCTION (BID ID -1512365)
S RATHIKA CONSTRUCTIONS (BID ID -1511156)
R K and Co (BID ID -1512599)
M/s A.Chelladurai & Co (BID ID -1512291)
M. Kumar Contractor (BID ID -1512342)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
BOQ_741066.xls
BOQ • 0.34 MB
s44.pdf
Tender Documents • 0.62 MB
Download all tender documents and submit your bid