Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.5 LAdmitted-Finance 96 L BLOCK WARD NO 06 SRI VIJAYNAGAR SRI GANGANAGAR RAJASTHAN 335704 | SRI VIJAYNAGAR | SRI GANGANAGAR | RAJASTHAN | 335704 | L1 | Admitted-Finance | |
| 2 | L2₹40.6 L+₹6,238 (0.15%)Admitted-Finance H NO 02 SAGAR ROAD OPPO MKD GIRLS SCHOOL TILAK NAGAR BIKANER 334001 | BIKANER | BIKANER | RAJASTHAN | 334001 | L2 | Admitted-Finance | |
| 3 | L3₹42.2 L+₹1.7 L (4.21%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹43.5 L+₹3.0 L (7.44%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹43.7 L+₹3.2 L (7.80%)Admitted-Finance PLOT NO 46 WARD NO 08 OPPOSITE RADIO TOWER SAGAR ROAD TILAK NAGAR BIKANER 334003 RAJ | BIKANER | BIKANER | RAJASTHAN | 334003 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | PAREEK AND COMPANY L6 | M/S BUDHRAM BISHNOI L5 | MSR INFRATECH L4 | OM CONSTRUCTION CO. L7 | PACHAR BROTHERS L1 | SHREE GURU NANAK CONSTRUCTION COMPANY L2 | BISHNOI BUILDERS L3 |
|---|---|---|---|---|---|---|---|---|---|---|
| .10Notes:- (i) 100 percent nonperishable items of the work shall be deposited by the L1 bidder within 30 days after placing of work order. (ii) The critical path network shall be submitted by L1 bidder immediately after the acceptance of tender and approved by GE. (iii) The bidders must ensure to visit the site, check relevant documents and makes of materials required to be incorporated under the subject from concern Engineer-in-Charge. (iv) The unserviceable material obtained under the schedule of credit shall be handed over to the contractor by the Engineer-in-Charge on a proper gate pass. (v) In case of non-availability of any make mentioned under list of Makes, the L1 Bidder shall obtain non-availability / non-manufacturing certificate from the concern OEM / authorised dealers and submitted to Accepting Officer, the L1 bidder may be incorporated Group-X category makes as approved by HQ CE SWC Jaipur and HQ CE BTZ in the works after prior approval of Accepting Officer. (vi) L1 Bidder shall produce E-way bill alongwith test certificate from OEM / manufacturer for costly items / major items of amount above Rs 50,000/- along with RAR’s and Final Bill. (vii) L1 Bidder shall be maintained an album containing Photos of all the material brought at site and each stage wise work progress and kept at site. Same shall be deposited in Engineer-in-Charge office after completion of work. (viii) The cost of all the above provisions shall be deemed to be included in the quoted rate of bidder, nothing extra shall be paid to the bidder.viii) The cost of all the above provisions shall be deemed to be included in the quoted rate of bidder, nothing extra shall be paid to the bidder. (ix) If a bidder observes any item in the BOQ that appears to be "Freakishly Low" or technically not required for execution at the site, the bidder must submit written comments to the Accepting Officer during the pre-tender stage or at least 07 days before the Bid Submission Start Date. (x) Any act by the contractor that is found to be against the interest of the Department,or commits misconduct or any complaint received through proper channels and supported by verifiable proof (e.g., fraudulent vouchers, negligence in execution, or attempt to cause undue benefit), shall be treated as a willful default.Such defaults shall render the contractor liable for an Adverse Remark ("NO") in the Quarterly Work Load Return (WLR), barring the firm and its related/sister concerns from participating in further tenders. | ||||||||||
| 1.00 | M & L for site clearance including clearing away all grass vegetation, sapling shrubs,brushwood along the fencing area complete all as specified and as directed. | 400 | Square metre | 30 ₹12,000 | 39 ₹15,600 | 50 ₹20,000 | 30 ₹12,000 | 25 ₹10,000 Lowest | 95 ₹38,000 | 47 ₹18,800 |
| 2.00 | Excavating over areas, n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. and getting out in soft / loose soil & getting out complete all as specified and directed by Engineer-in-Charge. | 250 | Cubic Metre | 100 ₹25,000 | 159 ₹39,750 | 100 ₹25,000 | 80 ₹20,000 Lowest | 300 ₹75,000 | 90 ₹22,500 | 310 ₹77,500 |
| 3.00 | Excavating over areas, exc 1.5 m but not exc 3.0m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. and getting out in soft / loose soil & getting out complete all as specified and directed by Engineer-in-Charge. | 270 | Cubic metre | 100 ₹27,000 Lowest | 169 ₹45,630 | 200 ₹54,000 | 100 ₹27,000 Lowest | 300 ₹81,000 | 110 ₹29,700 | 287 ₹77,490 |
| 4.00 | Excavating over areas, exc 3.0 m but not exc 4.5m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. and getting out in soft / loose soil & getting out complete all as specified and directed by Engineer-in-Charge. | 270 | Cubic metre | 100 ₹27,000 Lowest | 189 ₹51,030 | 300 ₹81,000 | 200 ₹54,000 | 300 ₹81,000 | 145 ₹39,150 | 287 ₹77,490 |
| 5.00 | Excavating over areas, exc 4.5 m but not exc 6.0m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc.and getting out in soft / loose soil & getting out complete all as specified and directed by Engineer-in-Charge. | 80 | Cubic Metre | 100 ₹8,000 Lowest | 219 ₹17,520 | 600 ₹48,000 | 300 ₹24,000 | 500 ₹40,000 | 200 ₹16,000 | 437 ₹34,960 |
| 6.00 | Returning, filling in, including spreading, leveling watering and well ramming in layers n.exc 25 cm in soft/loose soil complete all as specified and directed by Engineer-in-charge. | 87 | Cubic Metre | 50 ₹4,350 | 89 ₹7,743 | 100 ₹8,700 | 30 ₹2,610 Lowest | 100 ₹8,700 | 90 ₹7,830 | 77 ₹6,699 |
| 7.00 | Removal of excavated soil/ material to a distance not exc 50 metre and depositing where directed at a level not exc 1.50 metre above the starting point complete all as specified and directed by Engineer-in-charge. | 783 | Cubic Metre | 50 ₹39,150 | 79 ₹61,857 | 100 ₹78,300 | 30 ₹23,490 Lowest | 100 ₹78,300 | 120 ₹93,960 | 77 ₹60,291 |
| 8.00 | M & L in broken stone of gauge exc 80 mm to n exc. 150 mm, deposited, Loose filling with aggregates in soakage pits, soakage wells | 162 | Cubic Metre | 1,200 ₹1,94,400 | 1,699 ₹2,75,238 | 1,500 ₹2,43,000 | 1,400 ₹2,26,800 | 1,150 ₹1,86,300 | 900 ₹1,45,800 Lowest | 1,300 ₹2,10,600 |
| 9.00 | M & L in hardcore broken stone of gauge exc 40 mm to n exc.63 mm, deposited, Loose filling with aggregates in soakage pits, soakage wells watered and rammed to a true surface complete all as specified and directed by Engineer-in-charge | 162 | Cubic Metre | 1,300 ₹2,10,600 | 1,799 ₹2,91,438 | 1,800 ₹2,91,600 | 1,400 ₹2,26,800 | 1,150 ₹1,86,300 | 1,099 ₹1,78,038 Lowest | 1,300 ₹2,10,600 |
Tender Value
₹43.2 L
EMD Value
₹86,400
Closing Date
28 Sept 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE (A) SURATGARH
GE (A) SURATGARH MIL STATION
PROVISION OF RAIN WATER HARVESTING IN THE AOR OF AGE B/R-II UNDER GE(A) SURATGARH AT SURATGARH MIL STN
2026_MES_786022_1
GE(A)/SOG-TOKEN-51/2026-27
Open Tender
Civil Works
Item Rate
180 days
IN THE AOR OF GE (A) SURATGARH
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE(A) SURATGARH
₹86,400
Yes
17 Oct 2026
25 Aug 2026
30 Sept 2026
25 Aug 2026
28 Sept 2026
14 Sept 2026
25 Aug 2026 - 8 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M & L for site clearance including clearing away all grass vegetation, sapling shrubs,brushwood along the fencing area complete all as specified and as directed. | 400 | Square metre | - | - |
| 2 | Excavating over areas, n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. and getting out in soft / loose soil & getting out complete all as specified and directed by Engineer-in-Charge. | 250 | Cubic Metre | - | - |
| 3 | Excavating over areas, exc 1.5 m but not exc 3.0m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. and getting out in soft / loose soil & getting out complete all as specified and directed by Engineer-in-Charge. | 270 | Cubic metre | - | - |
| 4 | Excavating over areas, exc 3.0 m but not exc 4.5m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. and getting out in soft / loose soil & getting out complete all as specified and directed by Engineer-in-Charge. | 270 | Cubic metre | - | - |
| 5 | Excavating over areas, exc 4.5 m but not exc 6.0m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc.and getting out in soft / loose soil & getting out complete all as specified and directed by Engineer-in-Charge. | 80 | Cubic Metre | - | - |
| 6 | Returning, filling in, including spreading, leveling watering and well ramming in layers n.exc 25 cm in soft/loose soil complete all as specified and directed by Engineer-in-charge. | 783 | Cubic Metre | - | - |
| 7 | Removal of excavated soil/ material to a distance not exc 50 metre and depositing where directed at a level not exc 1.50 metre above the starting point complete all as specified and directed by Engineer-in-charge. | 87 | Cubic Metre | - | - |
| 8 | M & L in broken stone of gauge exc 80 mm to n exc. 150 mm, deposited, Loose filling with aggregates in soakage pits, soakage wells | 162 | Cubic Metre | - | - |
| 9 | M & L in hardcore broken stone of gauge exc 40 mm to n exc.63 mm, deposited, Loose filling with aggregates in soakage pits, soakage wells watered and rammed to a true surface complete all as specified and directed by Engineer-in-charge | 162 | Cubic Metre | - | - |
| 10 | M & L in broken stone of gauge 20 mm, deposited, deposited, Loose filling with aggregates in soakage pits, soakage wells watered and rammed to a true surface complete all as specified and directed by Engineer-in-charge | 162 | Cubic Metre | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
T51.pdf
Tender Documents • 1.10 MB
BOQ_881252.xls
BOQ • 0.32 MB
Coori1.pdf
PDF • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .