Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-AOC | ₹3.5 L | L1 | Accepted-AOC accept |
| 2 | L2₹4.1 L+₹61,943.73 (17.6%)Rejected-AOC | ₹4.1 L+₹61,943.73 (17.6%) | L2 | Rejected-AOC Reject |
| 3 | L3₹4.2 L+₹66,304.73 (18.9%)Rejected-AOC | ₹4.2 L+₹66,304.73 (18.9%) | L3 | Rejected-AOC accept |
| Sl No | Description | Qty | Unit | SRI AARURA CONSTRUCTIONS L3 | MJ Infrastructures L1 | T.L.NARAYANASAMY L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earthwork excavation in all types of soils including ali initial lead and lift etc complete | 84 | M3 | 125 ₹10,500 | 102.85 ₹8,639.4 Lowest | 121 ₹10,164 |
| 2.00 | Conveyance of excavated earth from site to 15 km far away to permitted low level areas including all cost etc complete | 84 | M3 | 70 ₹5,880 | 57.66 ₹4,843.06 Lowest | 67.5 ₹5,670 |
| 3.00 | BOTTOM LAYER : Providing water bound macadam for 75mm consolidated thickness for the bottom layer with grade II metal using 1m3 of 63mm to 45mm IRC size HBG metal with 0.24 m3 of gravel for screening for 10m2 of 75mm consolidated thickness,the grading of metal to confirm the table 400-6 of MOST specifications including cost of conveyance of all the material to the work site and stacking them with the standard departmental gauge labour charges for spreading metal and gravel hand packing metal to chamber watering with all leads for water forming edge bund etc., and consolidating by power roller and hire charges for all other tools and plant etc., complete as per clause 404 of ministry of surface transport specifications II revision. | 42 | M3 | 2,515 ₹1,05,630 | 2,133.07 ₹89,589.15 Lowest | 2,509.5 ₹1,05,399 |
| 4.00 | TOP LAYER : Providing water bound macadam for 75mm consolidated thickness for the TOP layer with grade II metal using 1m3 of 53mm to 22mm IRC size HBG metal with 0.24 m3 of gravel for screening for 10m2 of 75mm consolidated thickness,the grading of metal to confirm the table 400-6 of MOST specifications including cost of conveyance of all the material to the work site and stacking them with the standard departmental gauge labour charges for spreading metal and gravel hand packing metal to chamber watering with all leads for water forming edge bund etc., and consolidating by power roller and hire charges for all other tools and plant etc., complete as per clause 404 of ministry of surface transport specifications II revision. | 42 | M3 | 2,737.5 ₹1,14,975 | 2,327.13 ₹97,739.46 Lowest | 2,737.5 ₹1,14,975 |
| 5.00 | Tack coat over WBM using 4kg of 80/100 bitumen for 10 m2 area in manually including hire charges of machinery and labour charges etc., complete | 560 | M2 | 70 ₹39,200 | 54.06 ₹30,273.6 Lowest | 63.6 ₹35,616 |
| 6.00 | Providing and laying of plastic premix carpet with seal coat type 'A' 20mm consolidated thickness using IRC size machine broken HG metal 0.18 cum of 13.20mm and 0.09 cum of 11.20mm with 14.60 kg of 80/100 grade Bitumen for premixing for 10 sq.m of premix carpet and 0.09 cum of 6.70mm IRC size HBG metal with 9.80 kg of 80/100 grade bitumen for 10 sq.m for seal coat including cost and conveyance of all materials from approved quarry to work site and stacking them to departmental gauge for pre measurements including cost of bitumen which will be procured by the contractor at his own cost including conveyance of bitumen to work spot, handling charges for the same at both ends including heating the bitumen boiler, heating the aggregates and mixing them with Bitumen in mini hot mix plant for premix carpet rolling by power roller for premix carpets and sealcoat separately including labour charges for spreading the mix for premix carpet application bitumen for seal coat over the premix carpet including labour charges for spreading the seal coat including hire charges and running charges for mini hot mix plant power roller and all other tools and plants employed all indicated charges such as barricading, providing danger lights etc., complete complying with standards specifications as per MOST 509, 513. . | 560 | M2 | 253 ₹1,41,680 | 215.13 ₹1,20,475.6 Lowest | 253 ₹1,41,680 |
| 7.00Add :- GST @ 18% | ||||||
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
29 Jun 2026, 3:00 pmClosed
Asst Commissioner
East Zone Singanallur-641005
Restoration of BT Surface at Surya Nagar and ward areas in Ward No-56 East Zone
2026_MAWS_681272_24
E3/2026/EZ
Open Tender
Civil Works - Roads
Item Rate
East Zone Singanallur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,000
Yes
18 Sept 2026
17 Jun 2026
30 Jun 2026
17 Jun 2026
29 Jun 2026
17 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation in all types of soils including ali initial lead and lift etc complete | 84 | M3 | - | - |
| 2 | Conveyance of excavated earth from site to 15 km far away to permitted low level areas including all cost etc complete | 84 | M3 | - | - |
| 3 | BOTTOM LAYER : Providing water bound macadam for 75mm consolidated thickness for the bottom layer with grade II metal using 1m3 of 63mm to 45mm IRC size HBG metal with 0.24 m3 of gravel for screening for 10m2 of 75mm consolidated thickness,the grading of metal to confirm the table 400-6 of MOST specifications including cost of conveyance of all the material to the work site and stacking them with the standard departmental gauge labour charges for spreading metal and gravel hand packing metal to chamber watering with all leads for water forming edge bund etc., and consolidating by power roller and hire charges for all other tools and plant etc., complete as per clause 404 of ministry of surface transport specifications II revision. | 42 | M3 | - | - |
| 4 | TOP LAYER : Providing water bound macadam for 75mm consolidated thickness for the TOP layer with grade II metal using 1m3 of 53mm to 22mm IRC size HBG metal with 0.24 m3 of gravel for screening for 10m2 of 75mm consolidated thickness,the grading of metal to confirm the table 400-6 of MOST specifications including cost of conveyance of all the material to the work site and stacking them with the standard departmental gauge labour charges for spreading metal and gravel hand packing metal to chamber watering with all leads for water forming edge bund etc., and consolidating by power roller and hire charges for all other tools and plant etc., complete as per clause 404 of ministry of surface transport specifications II revision. | 42 | M3 | - | - |
| 5 | Tack coat over WBM using 4kg of 80/100 bitumen for 10 m2 area in manually including hire charges of machinery and labour charges etc., complete | 560 | M2 | - | - |
| 6 | Providing and laying of plastic premix carpet with seal coat type 'A' 20mm consolidated thickness using IRC size machine broken HG metal 0.18 cum of 13.20mm and 0.09 cum of 11.20mm with 14.60 kg of 80/100 grade Bitumen for premixing for 10 sq.m of premix carpet and 0.09 cum of 6.70mm IRC size HBG metal with 9.80 kg of 80/100 grade bitumen for 10 sq.m for seal coat including cost and conveyance of all materials from approved quarry to work site and stacking them to departmental gauge for pre measurements including cost of bitumen which will be procured by the contractor at his own cost including conveyance of bitumen to work spot, handling charges for the same at both ends including heating the bitumen boiler, heating the aggregates and mixing them with Bitumen in mini hot mix plant for premix carpet rolling by power roller for premix carpets and sealcoat separately including labour charges for spreading the mix for premix carpet application bitumen for seal coat over the premix carpet including labour charges for spreading the seal coat including hire charges and running charges for mini hot mix plant power roller and all other tools and plants employed all indicated charges such as barricading, providing danger lights etc., complete complying with standards specifications as per MOST 509, 513. . | 560 | M2 | - | - |
| 7 | Add :- GST @ 18% | - | - | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Tendernotice_2.pdf
PDF • 0.10 MB
Roads.pdf
Tender Documents • 0.51 MB
BOQ_818778.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .