| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC AT PO PHUSRO BAZAR DIST BOKARO PIN 829144 | PHUSRO | BOKARO | JHARKHAND | 829144 | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical AT SINGH NAGAR PHUSRO P O PHUSRO BAZAR DIST BOKARO | PHUSRO | BOKARO | JHARKHAND | 829144 | - | Rejected-Technical No relevant experience as per NIT | |
| 3 | Rejected-Technical 00 KALU KUWAN BANDA BANDA UTTAR PRADESH 210001 | BANDA | UTTAR PRADESH | 210001 | - | Rejected-Technical No relevant experience as per NIT |
Tender Value
Refer Docs
EMD Value
₹4,500
Closing Date
21 Feb 2025, 6:55 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
PE EnM dhori khas
PE EnM dhori khas
Repairing and maintenance of Trippler sl. no. 01 with Rail transporting and making of bevel pulley at 7, 8 incline of Dhori (K) Colliery
2025_CCL_328394_3
PO/D(K)/EnM/Tender/24-25/27
Open Tender
Miscellaneous Works
Item Rate
10 days
PE EnM dhori khas
As per NIT
2 documents required · 2 mandatory
₹4,500
3 Mar 2025
8 Feb 2025
22 Feb 2025
10 Feb 2025
21 Feb 2025
10 Feb 2025
10 Feb 2025 - 12 Feb 2025
Amount
Tripller Repairing
Damaged and broken joist cutting by gas set both end 64 point X 04”=
Joist cutting by gas set 08’ long X 04 Nos. =
3/4”size bolt cutting by gas set.
Joist cutting by gas set 12” X 04 Nos. =
Hole making in joist
joist setting and welding point to point 04”X 64 point
New tippler plate rivet cutting 01” size and rivet dismantling then plate dismantling both end by gas set.02 Nos. X 02 Nos.=
Shaft new making as per size 325mm long X 55mm dia.
Broken shaft welded portion cutting in round and dismantling by hyd. press
Shaft fitting in plate and welding in round
Plate fitting in new Tippler by 3/4” X 04” bolt nut 24 Nos. new fitting tightening and welding.
Lower base frame setting in new frame after alignment checking and completely welding as per size (18” long + 12” wide) X 04 side outer and inner in 03 layer Total welding (120” X 02 X 03)
03 Nos. each side plate setting with nut bolts 3/4”x 04”- 20 Nos. fitting and full tightening.
Side plate cutting as per size (12”+ 12”+ 18) X 12 Nos. =
Hole making in plate 3/4” size 05 Nos. each, Total holes 05 X 12 =
Tippler frame extending by angle frame making as per reqd. size and shape 16.5”X 09”X 02 Nos. and setting and welding and fitting with nut bolts.
Side plate completely welding as per size(12”+ 12”+18”) X 3 X 2 X 4 side=
Rail bending by gas heating and hyd. Press as per reqd. shape and size.
Rail welding with lower base frame after alignment setting
Angle welding with lower furse plate 06’ longX02Nos.Xboth side (72”X 02X02)
Plate cutting as per size (04” wide X 74” long) X 02 Nos.=
Plate setting on angle and welding with lower base for chuck Rail both end 06’ X 02= 72”X 02 X 02=
Drawer Patti cutting 30” long X 02 Nos. =
Stopper plate welding both side as reqd. With drawer patti cutting 04 mouth and welding with plate
Pattern making
Mold making
Raw material for CI casting of break wheel drum
Brake wheel machining
Bush bore making by machining 80mm X 150mm long
Key and key way making 25mm wide Xn08mm deep X 150mm long
Break lining replacement and new rivet riveting
Break handle new making and fitting for break drum
Copper rivet 08 mm replacement
Rail cutting work
Rail cutting by gas set 130 mouth (12”X 130 mouth)=
Jointing hole making 02 Nos. each both end of Rail by gas set after hole centre alignment 04 Nos. in each total Rail 130 Nos. X 04 Nos.=
Rail ‘V’ point making by cutting 10” both end in each rail total (10”+10”) X 32Nos. Total cutting-
Track line Rail ‘V’ point jointing by welding both end 32 joint X 10”X 02
Hole making in rail 05 Nos. in each X 16 Nos. rail, Total holes-
Supply and fixing of fish plate
Rail fixing in plate and point to point 03” size welding Total welding 03” X 10 point X 16 nos.
Bevel pulley with frame 15 sets
Bottom plate rivet cutting 01” size 18nos. (03” X 18 Nos. X 15 nos.=
5/2.5”size channel cutting 100 mouth (10” X 150 Nos.) =
Tub wheel axle dismantling by hyd. Press – (02 mouth X 15 nos.)
Shaft cutting 02 nos. in each shaft = (06” X 02 Nos.) X 15 nos. =
Shaft machining – 02 mouth each shaft = 02 nos. X 15nos.
Shaft lock hole making
Channel middle portion cutting 02”round 30 Nos. (06”X 30 nos.) =
Shaft fitting and welding with channel–15 nos.in 03 layer (06”X 03X 15 nos.=
Pulley caller making 01 side by 3/4”size rod 40” long bending and setting on caller and completely welding in 02 layer- (40”X 02) X 15 nos.=
Total impact of GST for the purpose of CTC
techsummary_340403.pdf
PDF • 0.90 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_340403.pdf
PDF • 0.35 MB
AOC.pdf
PDF • 2.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .