| 1 | L1₹58.9 LAccepted-AOC | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹57.8 L+₹7.8 L (15.7%)Rejected-Finance | L2 | Rejected-Finance L2 Bidder |
Tender Value
₹62.9 L
EMD Value
₹1.3 L
Closing Date
17 Apr 2024, 12:00 pmClosed
CGM (OnM), LAR
Bijulee Bhawan, Paltan Bazar
Construction of new tower with pile foundation in place of river eroded tower at Loc- 439 of 220 KV D/C Rangia-Salakati Line
2024_AEGCL_36133_1
AEGCL/MD/Tech-325/RNG-SLKT/Loc No. 439/Bid
Open Tender
Electrical Works
Works
180 days
Loc- 439 of RNG-SLKT transmission line
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
₹1.3 L
3 Jan 2025
9 Feb 2024
18 Apr 2024
9 Feb 2024
17 Apr 2024
9 Feb 2024
Amount
Super structure
Galvanized iron superstructure (DB+0) inclusive of galvanized D shackle, pack washer, spring washer, step bolt, nuts and bolts etc.
Stub and cleat (partly galvanized)
Stub and stub setting template
Tower accessories
Supply of Anti-Climbing device
Conductor Accessories
Single tension Hardware fittings (Dead end type) including all aceessories suitable for AAAC Zebra
Ground wire accessories
Strain clamp
Description of Work / Item(s)
Amount
Super structure
Galvanized iron superstructure (DB+0) inclusive of galvanized D shackle, pack washer, spring washer, step bolt, nuts and bolts etc.
Stub and cleat (partly galvanized)
Stub and stub setting template
Tower accessories
Supply of Anti-Climbing device
Conductor Accessories
Single tension Hardware fittings (Dead end type) including all aceessories suitable for AAAC Zebra
Ground wire accessories
Strain clamp
Description of Work / Item(s)
Amount
Dismantling of complete towers at loc. 439 and transport the same to Rangia Store
At 439 (DA+0) , weight: 4.38 MT
Erection of super structure at loc. 439
At loc. 439 (DB+0), weight: 6.503 MT
Stringing of ground wire from loc. 434 to New Tower (Loc.No.-439) and from New Tower (Loc.No.-439) to Loc.No.-442 Total distance : 2.47 Km
Earthing per tower including supply of all earthing materials
Painting of tower with bituminous paints of approved quality to 3 mts from ground level including the cost of the paint.
Opening and lowering of Conductors from loc. 434 to Loc.No.-442 Span Length : 2.47 Km Total Km for Double Circuit =6x2.47 =14.82 Km
Shifting of conductors from loc. 434 to New Tower (Loc.No.-439) and from New Tower (Loc.No.-439) to Loc.No.-442 Total distance : 2.47 Km Total CKm for Double Circuit =2x2.47 =4.94 CKm
Description of Work / Item(s)
Amount
Erection and dismantling of ERS
Preparation and levelling of site
ERS Tower materials sorting, loading and carrying from Kahilipara Store and unloading at site camp. Weight in MT of 1 No. of ERS Tower=5.2 MT For 02 Nos. of ERS Tower-5.2 x 2= 10.4 MT
ERS Tower materials sorting, loading and carrying from Kahilipara Store and unloading at site camp. Weight in MT of 1 No. of ERS Tower=5.2 MT For 02 Nos. of ERS Tower-5.2 x 2= 10.4 MT
Carrying of ERS materilas from head camp to site camp by head load
Anchoring (including excavatgion) for 5 nos. of Anchors
Erection of 1 ERS Tower
Dismantling of conductors (3 Nos.) from the existing line of location
Restringing of conductors (3 Nos.) in the ERS Tower including changing of damaged insulators, jointing and repairing of the conductors
Opening, repairing and refitting of Jumpers
Dismantling
Dismantling of 1 ERS Tower including de-anchoring.
Restringing of conductors (3 Nos.) in therepaired existing tower including jointing etc. complete
ERS tower materials shifting from work site to the site camp by head load
ERS tower materilas sorting, loading and carrying from site xcamp and unloading at Kahilipra Store.
ERS tower materilas sorting, loading and carrying from site xcamp and unloading at Kahilipra Store.
Description of Work / Item(s)
Amount
Detail & check survey as per specification
Mobilization (including preparation of work space, Approach road, dewatering, arrangement of electricity, jungle clearing, earth filling and making all arrangement for completion of the work) and construction and supply of all materials & labours of temporary island/platform to faciallitate the construction of foundation including platform for storage of construction materials such as stone chips, sand, cement, steel reinforcement bar, mixture machines, tools & plants all foundation materials keeping & mixing.
Boring, providing and installation of bored cast-in-situ pile of specific diameter below the pile cap with M25 grade of cement concrete including the cost of reinforcement steel, cost of boring with temporary guide casting bentonite solution (length of the pile for payment shall be measured from the bottom of pile cap). All necessary labour materials plants, tools and tackles etc. complete as necessary for proper execution of the job. The unit rate should include excavation, dewatering, socketing, anchoring (if required), backfilling, form work for placing plain or reinforced cement concrete, supply & providing MS liner of 6 mm thickin piles up to 10 metre depth from the bottom of the pile cap, conducting standard penetration test and integrity test. Each leg will required 1 nos RCC bored pile of 1200 mm diameter i.e. 4 nos of pile each tower foundation. (Payment will be made as per actual length of the piles as per site condition necessary and approved drawing.) (A) 1200 mm dia piles 4 nos of pile 4 x18 =72
Providing and laying in M25 grade concrete of specified 28 days strength for pile cap, chimney and tie beam including reinforcement steel form work all necessary materials and equipments, transportation, batching, mixing, vibrating, dewatering etc. complete. Chimney 4x3.14159 x 0.6 x 0.6 x 3.5=15.834 Tie beam 4x8.59x0.5x0.75= 12.885
Setting of stubs (sets of four) including transportation & distribution of stub and accessories from store to site excluding the cost of excavation, concreting & back filling.
DIMBESWAR DAS PRIVATE LIMITED
DIMBESWAR DAS PRIVATE LIMITED
DIMBESWAR DAS PRIVATE LIMITED
DIMBESWAR DAS PRIVATE LIMITED
DIMBESWAR DAS PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .