Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.2 LAdmitted-Fee/PreQual/Technical/Finance | -43.11% | ₹7.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.8 L+₹57,268.22 (7.95%)Admitted-Fee/PreQual/Technical/Finance | -38.59% | ₹7.8 L+₹57,268.22 (7.95%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹7.9 L+₹64,743.49 (8.98%)Admitted-Fee/PreQual/Technical/Finance | -38.00% | ₹7.9 L+₹64,743.49 (8.98%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹8.2 L+₹1.0 L (14.3%)Admitted-Fee/PreQual/Technical/Finance | -35.00% | ₹8.2 L+₹1.0 L (14.3%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹8.6 L+₹1.4 L (18.9%)Admitted-Fee/PreQual/Technical/Finance | -32.33% | ₹8.6 L+₹1.4 L (18.9%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹14.9 L
EMD Value
₹29,900
Closing Date
18 Aug 2026, 4:00 pmClosed
AS PER THE NIT
AS PER THE NIT
Fencing and levelling of playground and other allied works near Govt. Middle School Gogo Humhama Budgam.
2026_PWDJK_320708_1
NIT NO 61/RNB/RAJ OF 2026-27 DATED 12.08.2026
Open Tender
Civil Works
Percentage
30 days
SRINAGAR
AS PER THE NIT
2 documents required · 2 mandatory
₹600
Yes
AS PER THE NIT
₹29,900
Yes
2 Sept 2026
12 Aug 2026
19 Aug 2026
13 Aug 2026
18 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil : | 704.53 | Cum | - | - |
| 2 | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material :All kinds of soil : | 704.53 | Cum | - | - |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 493.17 | Cum | - | - |
| 4 | Disposal of mulba/ excavated earth by MT incl. loading unloading upto 5 Kmtr.beyond municipal limits as per the directions of EIC at site complete. | 211.36 | Cum | - | - |
| 5 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) upto floor V level. | 8.38 | Cum | - | - |
| 6 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :incl. dewatering if any | 38.83 | Cum | - | - |
| 7 | P/L stone soling/ GSB Nallah makh/Quarry makh or 2nd class sand in foundation trenches /inside plinth including compacting, including all carriage of material complete. | 40.91 | Cum | - | - |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 8.33 | Cum | - | - |
| 9 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 13.5 | Cum | - | - |
| 10 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 31.82 | Cum | - | - |
stage.html
html • 0.03 MB
finance_1067180.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
BOQ_1067180.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .