Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 CrAccepted-AOC KARAMPUR PATIYALI KASGANJ | ₹10.0 Cr Quoted ₹10.1 Cr | L1 | Accepted-AOC FINANCIAL BID IS ACCEPTED AT THE PRICE OF Rs.10,04,44,787.23 |
| 2 | L2₹10.4 CrRejected-Finance AGRA ROAD ETA | ETA | ETA | UTTAR PRADESH | ₹10.4 Cr | L2 | Rejected-Finance REJECTED THIS IS HIGHER RATE. |
| 3 | L3₹10.7 CrRejected-Finance | ₹10.7 Cr | L3 | Rejected-Finance REJECTED THIS IS HIGHER RATE. |
| 4 | L4₹11.5 CrRejected-Finance | ₹11.5 Cr | L4 | Rejected-Finance REJECTED THIS IS HIGHER RATE. |
| 5 | Not Admitted-Fee/PreQual/Technical VILL SIDHIYAWA JAGDISHPUR AMETHI UP 227817 | JAGDISHPUR | AMETHI | UTTAR PRADESH | 227817 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹11.7 Cr
EMD Value
₹23.4 L
Closing Date
25 Mar 2021, 12:00 pmClosed
OFFICE OF SE UNNAO CIRCLE PWD UNNAO
OFFICE OF SE UNNAO CIRCLE PWD UNNAO
WIDENING OF HASANGANJ RASOOLABAD ROAD (MDR) FROM KM.01 TO KM. 15.500 IN DISTT. UNNAO
2021_CEUCZ_572458_1
2219/M/1MT-ETEN-U.CIR/20-21 DT.17-03-21
Open Tender
Civil Works
270 days
UNNAO
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹23.4 L
OFFICE OF SE UNNAO CIRCLE PWD UNNAO
9 Jul 2021
18 Mar 2021
26 Mar 2021
18 Mar 2021
25 Mar 2021
20 Mar 2021
20 Mar 2021
Amount
Construction of Embankment with approved material obtained from borrowpits with all lifts and leads,spreading,grading to required slope and compected to meet requirement of table 300-2..Including Labour Cess and Excluding G.S.T.
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Including Labour Cess and Excluding G.S.T.
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. Including Labour Cess and Excluding G.S.T.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density.Including Labour Cess and Excluding G.S.T.
Providing and applying primer coat with bitumen emulsion (SS) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70kg/sqm usingmannual means .Including Labour Cess and Excluding G.S.T.
Providing and applying tack coat with Bitumen V.G._10 using Bitumin pressure distributor at the rate of 0.35 kg per sqm on the prepared surface cleaned with hydraulic broom .Including Labour Cess and Excluding G.S.T.
Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades Including Labour Cess and Excluding G.S.T.
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type 'C'.Including Labour Cess and Excluding G.S.T..
Extention of 1000 mm hume pipe culvert Earthwork in excavation for structures as per drawing & technical specification clause 305.1 including setting out, construction of shoring & backing, removal of stumps & other delecterious matter, dressing of sides & botton, backfilling the excavation the remaining earth locally for road work.Including Labour Cess and Excluding G.S.T..
Extention of 1000 mm hume pipe culvert Plain cement concrete mix 1:3:6 40mm nominal size brick ballast , placed in foundation and compacted by vibration including curing for 14 days..Including Labour Cess and Excluding G.S.T.
Extention of 1000 mm hume pipe culvert Granular material(O. B. B.) filling in foundation trenches as per drawing & technical specition clause 305.3.9 on the sides of Hume pipe.Including Labour Cess and Excluding G.S.T
Extention of 1000 mm hume pipe culvert Providing reinforced concrete pipe NP3 for culvert on first class bedding of granular material in single row including fixing collar with cement mortar1:2(1cement: 2 coarse sand).Including Labour Cess and Excluding G.S.T
Extention of 1000 mm hume pipe culvert Brick masonry work in cement mortar 1:3(C:Cs) in foundation complete excluding pinting and plastering as per drawing & technical specifications clause 600, 1202 & 1203 .Including Labour Cess and Excluding G.S.T
Extention of 1000 mm hume pipe culvert Pointing with cement mortar 1:3(C:Cs) deep veriety (cut or weather) on brick & tile work including supply of all materials, labour and T&P reqd. for proper completion of work as per drawing & technical specification clauses 613.3 and 1204 Standard data book for analysis of rates for Rural Roads, Sr. no. 12.2,Including Labour Cess and Excluding G.S.T..
Construction of Shoulder with approved material obtained from borrowpits with all lifts and leads,spreading,grading to required slope and compected to meet requirement of table 300-2.Including Labour Cess and Excluding G.S.T..
Drain in Abadi Portion Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Including Labour Cess and Excluding G.S.T..
Drain in Abadi Portion Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days. Including Labour Cess and Excluding G.S.T.
Drain in Abadi Portion RCC Grade M 20 in substructure Furnishing and placing reinforced cement concrete in super structure as per drawing and Technical Specifications.Including Labour Cess and Excluding G.S.T.
Drain in Abadi Portion Supplying fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and Technical Specifications clauses.Including Labour Cess and Excluding G.S.T.
Extention of RCC Culvert Earthwork in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom,brakfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.Including Labour Cess and Excluding G.S.T.
Extention of RCC Culvert Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days.Including Labour Cess and Excluding G.S.T.
Extention of RCC Culvert Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering as per drawing and technical speficiations .Including Labour Cess and Excluding G.S.T.
Extention of RCC Culvert Providing and laying of weephole in brick massonary in abutment and wing wall with 100mm dia PVC pipe extending through the full width of the structuer with slope of 1v:20 H towarddrawing force complete as per drawing and technical specification (MORTH &H-13.8/2706&2200)..Including Labour Cess and Excluding G.S.T.
Extention of RCC Culvert Furnishing and placing reintforced cement concrement in super structure as per drawing and Technical Specifications.Including Labour Cess and Excluding G.S.T.
Extention of RCC Culvert Wearing coat.Including Labour Cess and Excluding G.S.T.
Extention of RCC Culvert Mild steel or iron in plain work such as in reinforced concrete / brick work (when not included in overall rates) wrought to required shape as necessary I/C bending for proper completion of the work and including supply of steel, it's wastage and hooks and authorized over lapping shall be measured.Including Labour Cess and Excluding G.S.T.
Extention of RCC Culvert Stuck pointing with cement and fine sand of 1.25 fineness modulus morter on stone work in proportion of 1:2 including supply of all materials, labour and tools and plants etc. required for proper completion of the work.Including Labour Cess and Excluding G.S.T.
Extention of RCC Culvert Filling G.S.B material between road and abutment.Including Labour Cess and Excluding G.S.T.
RAM SANEHI AND SONS
Ajay Builders
SIDDHARTH CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid