Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAdmitted-Finance | ₹6.7 L | L1 | Admitted-Finance |
| 2 | L2₹8.2 L+₹1.5 L (22.8%)Admitted-Finance | ₹8.2 L+₹1.5 L (22.8%) | L2 | Admitted-Finance |
| 3 | L3₹8.2 L+₹1.6 L (23.3%)Admitted-Finance | ₹8.2 L+₹1.6 L (23.3%) | L3 | Admitted-Finance |
| 4 | L4₹8.8 L+₹2.1 L (31.2%)Admitted-Finance | ₹8.8 L+₹2.1 L (31.2%) | L4 | Admitted-Finance |
| 5 | L5₹9.0 L+₹2.3 L (34.1%)Admitted-Finance | ₹9.0 L+₹2.3 L (34.1%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | rudra enterprises L5 | New Sign L2 | RAKESH KUMAR SHARMA L1 | AMAN KHAN L3 | DROOM CONSTRUCTION L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Supplying & Stacking of good earth at site by including royalty and carriage upto 5 k.m. complete. (The Good earth measured in stacks will be reduced by 20 % for payment) | 50 | P.Cum | 200 ₹10,000 Lowest | 400 ₹20,000 | 250 ₹12,500 | 400 ₹20,000 | 500 ₹25,000 |
| 2.00 | Supply & Stacking of jamuna sand at site I/C royalty and carriage, loading, un- loading with all lead and lifts. | 25 | P.cum | 250 ₹6,250 Lowest | 2,000 ₹50,000 | 750 ₹18,750 | 1,600 ₹40,000 | 900 ₹22,500 |
| 3.00 | Provision of Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately) Holes 60 cm dia and 60 cm deep | 400 | each | 10 ₹4,000 Lowest | 20 ₹8,000 | 25 ₹10,000 | 30 ₹12,000 | 15 ₹6,000 |
| 4.00 | Provision of Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately) Holes 45 cm dia and 45 cm deep | 6,000 | each | 10 ₹60,000 Lowest | 12 ₹72,000 | 10 ₹60,000 Lowest | 10 ₹60,000 Lowest | 15 ₹90,000 |
| 5.00 | Provision of supply and stacking of Neem Oil Cake at site. (40 kg each bag) | 85 | Each bag | 200 ₹17,000 Lowest | 600 ₹51,000 | 450 ₹38,250 | 800 ₹68,000 | 800 ₹68,000 |
| 6.00 | Provision of Supply and stacking of IFFCO Neem Coated Urea (45 kg bag) at site. | 15 | Each bag | 200 ₹3,000 Lowest | 300 ₹4,500 | 200 ₹3,000 Lowest | 800 ₹12,000 | 400 ₹6,000 |
| 7.00 | Providing and fixing of Tuflex Garden fencing Hexagonal net/or equivalentof green colour having contents ( Weight grams/sqm. 510 (+/- 8%)) in width of 60 cm. with bamboo of 90 cm. length. The bamboo should be painted with green colour paint of approved brand and manufacture (two or more coats) and fixed 30 cm. below ground level and 60 cm. above ground level at a distance of 1.50 mtrs. The net and bamboo should be binded with 2 mm. G.I. Wire at three places properly as per direction of Officer-in-charge. | 300 | Per Sqm | 120 ₹36,000 | 150 ₹45,000 | 180 ₹54,000 | 135 ₹40,500 | 100 ₹30,000 Lowest |
| 8.00 | Preparation of beds for hedging and shrubbery by excavating 60 cmdeep and trenching the excavated base to a further depth of 30 cm,refilling the excavated earth after breaking clods and mixing with sludgeor manure in the ratio of 8:1 (8 parts of stacked volume of earth afterreduction by 20% : one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary,watering and finally fine dressing, leveling etc. including stacking and disposal of materials declared unserviceable and surplus earth byspreading and leveling as directed, within a lead of 50 m, lift up to 1.5 m complete (cost of sludge, manure or extra earth to be paid for separately). | 488 | cum | 120 ₹58,560 | 200 ₹97,600 | 100 ₹48,800 Lowest | 180 ₹87,840 | 250 ₹1,22,000 |
| 9.00 | Provision of Hydraulic Excavator (3D) with driver and fuel. | 5 | Per day | 1,000 ₹5,000 Lowest | 8,000 ₹40,000 | 7,000 ₹35,000 | 7,000 ₹35,000 | 7,000 ₹35,000 |
| 10.00 | Providing and stacking of Murraya exotica of height 45-60 cm. in poly bag of size 15 cm as per direction of the officer-in-charge. | 8,000 | Each | 10 ₹80,000 Lowest | 16 ₹1,28,000 | 10 ₹80,000 Lowest | 10 ₹80,000 Lowest | 12 ₹96,000 |
Tender Value
₹12.8 L
EMD Value
₹25,610
Closing Date
22 Jul 2026, 3:00 pmClosed
DD/HD-5/DDA
Horticulture Division-5, Rohini, Sector-10
Name of work Do 400 Hact. of land in Phase-IV V Sector 27 28 Rohini. Do Green Area at Pocket A3, Sector 28, Rohini. Sub Head Horticultural Development work at site.
2026_DDA_917477_1
15/DD/Hort.-V/DDA/2026-27
Open Tender
Agricultural or Forestry
Item Rate
90 days
Horticulture Division-5, Rohini, Sector-10
Please refer Tender documents.
11 documents required · 11 mandatory
₹0
₹25,610
3 Aug 2026
15 Jul 2026
23 Jul 2026
15 Jul 2026
22 Jul 2026
15 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying & Stacking of good earth at site by including royalty and carriage upto 5 k.m. complete. (The Good earth measured in stacks will be reduced by 20 % for payment) | 50 | P.Cum | - | - |
| 2 | Supply & Stacking of jamuna sand at site I/C royalty and carriage, loading, un- loading with all lead and lifts. | 25 | P.cum | - | - |
| 3 | Provision of Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately) Holes 60 cm dia and 60 cm deep | 400 | each | - | - |
| 4 | Provision of Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately) Holes 45 cm dia and 45 cm deep | 6,000 | each | - | - |
| 5 | Provision of supply and stacking of Neem Oil Cake at site. (40 kg each bag) | 85 | Each bag | - | - |
| 6 | Provision of Supply and stacking of IFFCO Neem Coated Urea (45 kg bag) at site. | 15 | Each bag | - | - |
| 7 | Providing and fixing of Tuflex Garden fencing Hexagonal net/or equivalentof green colour having contents ( Weight grams/sqm. 510 (+/- 8%)) in width of 60 cm. with bamboo of 90 cm. length. The bamboo should be painted with green colour paint of approved brand and manufacture (two or more coats) and fixed 30 cm. below ground level and 60 cm. above ground level at a distance of 1.50 mtrs. The net and bamboo should be binded with 2 mm. G.I. Wire at three places properly as per direction of Officer-in-charge. | 300 | Per Sqm | - | - |
| 8 | Preparation of beds for hedging and shrubbery by excavating 60 cmdeep and trenching the excavated base to a further depth of 30 cm,refilling the excavated earth after breaking clods and mixing with sludgeor manure in the ratio of 8:1 (8 parts of stacked volume of earth afterreduction by 20% : one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary,watering and finally fine dressing, leveling etc. including stacking and disposal of materials declared unserviceable and surplus earth byspreading and leveling as directed, within a lead of 50 m, lift up to 1.5 m complete (cost of sludge, manure or extra earth to be paid for separately). | 488 | cum | - | - |
| 9 | Provision of Hydraulic Excavator (3D) with driver and fuel. | 5 | Per day | - | - |
| 10 | Providing and stacking of Murraya exotica of height 45-60 cm. in poly bag of size 15 cm as per direction of the officer-in-charge. | 8,000 | Each | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.29 MB
1280475NIT.pdf
Tender Documents • 2.11 MB
BOQ_964166.xls
BOQ • 0.25 MB
TC15.pdf
Additional Documents • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .