Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.7 LAccepted-AOC SAI VILLA C 65 EKTA NAGAR BAREILLY UTTAR PRADESH 243 122 | BAREILLY | UTTAR PRADESH | 243122 | L1 | Accepted-AOC Accepted being L1 | |
| 2 | L2₹49.9 L+₹81,921 (1.67%)Rejected-Finance 21 9TH MAIN 4TH CROSS GOWDAKEHOLA BAGALAKUNTE NAGASANDRA POST BANGALORE 560073 | BENGALURU URBAN | KARNATAKA | 560073 | L2 | Rejected-Finance Rejected. Quoted rates are higher than L1 | |
| 3 | L3₹49.9 L+₹87,011 (1.77%)Rejected-Finance | L3 | Rejected-Finance Rejected. Quoted rates are higher than L1 | |
| 4 | L4₹50.9 L+₹1.8 L (3.70%)Rejected-Finance | L4 | Rejected-Finance Rejected. Quoted rates are higher than L1 | |
| 5 | L5₹51.6 L+₹2.5 L (5.09%)Rejected-Finance | L5 | Rejected-Finance Rejected. Quoted rates are higher than L1 |
| Sl No | Description | Qty | Unit | Neptune Engineers and Builders L9 | RAMESH BABU CO L4 | A.GOVINDARAJ L3 | shashi shekar construction L5 | SRI MAHALAKSHMI CONSTRUCTIONS L2 | Maruthi constructions L6 | ARUNOTHAYA TRADERS L8 | M/S SRI BALAJI ENTERPRISES L7 | M/S Shiv Shakti Enterprises L10 | NORTH INDIA PEST CONTROL L1 | raashi constructions L12 | s v m construction building & engineers L11 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | M&L Repair to ends of chajjas/ parapets by removing old concrete, loose material & cleaning of the reinforcement and finishing the surface with rich cement mortar 1:3 , finished fair & even and making good with existing finishes complete all as specified and as directed.
Note: Rate quoted by the tenderer shall be deemed to inclusive of double steel scaffolding. | 25 | Each Job | 540 ₹13,500 | 652 ₹16,300 | 600 ₹15,000 | 445 ₹11,125 | 396 ₹9,900 | 430 ₹10,750 | 540 ₹13,500 | 325 ₹8,125 Lowest | 551 ₹13,775 | 480 ₹12,000 | 390 ₹9,750 | 620 ₹15,500 |
| 2.00 | M&L for Dismantling/ taking down old existing unserviceable cement plaster, loose/ unsound weaken cement concrete of any description and in any position from existing external / internal surface of RCC roof/ slab/ beams/ columns/ RCC facias for an average depth of 25mm (Approx height 7.5m from natural ground level) with power driven pneumatic flat/pointed chisel and removing the honeycombed area including all the corners and making a neat profile of the cavities, roughen the smooth surface , scrapping out/removing corrosion all loose/scale/rust etc form the visible reinforcement by applying rust remover such as Rust Off 100 of make M/s Sika India Pvt Ltd, or equivalent in M/s Fosroc Chemicals, M/s BOSTIk India pvt limited, M/s STP Limited, M/s Thermax Limited( as approved by GE) and cleaning the steel reinforcement properly all as per manufacturer instructions and all as specified and directed and comprising of below mentioned process :- | 40 | Sqm | 1,250 ₹50,000 | 1,352 ₹54,080 | 1,300 ₹52,000 | 1,250 ₹50,000 | 1,200 ₹48,000 | 1,500 ₹60,000 | 1,250 ₹50,000 | 1,200 ₹48,000 | 1,448 ₹57,920 | 1,220 ₹48,800 | 1,190 ₹47,600 Lowest | 1,400 ₹56,000 |
| 3.00(a) Providing cement based admixed with Sikacim, integral waterproofing liquid M/s Sika India Pvt Ltd, or equivalent in M/s Fosroc Chemicals, , M/s BOSTIk India pvt limited, M/s STP Limited, M/s Thermex Ltd (as approved by GE) @ 0.2% by weight of cement or as per manufacturer’s instructions over a coat of acrylic emulsion bonding agent such as per as Sika Latex in 1:1:3 ratio of Make M/s Sika India Pvt Ltd, or equivalent in M/S Fosroc chemicals, M/s BOSTIk India pvt limited, M/s STP Limited, M/s Thermex Ltd (as approved by GE) having specific gravity of 1.02 or as per manufacturer’s instructions with necessary surface preparation such as creating mechanical key like roughening the surface by scrabbing, grit blasting and cleaning the existing surface using high pressure water jet machine having pressure upto 500 bar pressure to remove the dirt, dust, loose particles , wax, efforencene and other contaminations from the surface of RCC columns/ beams/ slabs/ facia/ any brick/ stone surfaces etc all as per manufacturer instructions and all as specified and directed by Engineer-in-Charge. | |||||||||||||||
| 4.00(b) Providing and applying FRIAZINC R, corrosion inhabiliting Active Zinc rich primer of make M/s Sika India Pvt Ltd, or equivalent in M/s Fosroc Chemicals, , M/s BOSTIk India pvt limited, M/s STP Limited, M/s Thermex Ltd (as approved by GE) along the exposed reinforcement surface property and allowed to dry. | |||||||||||||||
| 5.00(c) Providing and applying Hibond, Epoxy based Thixotropic bonding adhesive of Make of M/s Sika India Pvt Ltd, or equivalent in M/s Fosroc Chemicals, M/s BOSTIk India pvt limited, M/s STP Limited, M/s Thermex Ltd ( as approved by GE) over the prepared concrete surface to get a good bonding between existing concrete surface and providing Sika Rep Microcrete 4 Fiber reinforced cementitious repair micro concrete of make M/s Sika India Pvt Ltd, or equivalent in M/s Fosroc Chemicals, M/s BOSTIk India pvt limited, M/s STP Limited, M/s Thermex Ltd ( as approved by GE) over Epoxy based bonding agent applied area before 6 Hrs etc including providing necessary proportions , bracing and runners to relieve the member from the load coming on it including scaffolding leak proof shuttering with working platform as required and as per design and pattern complete including preparing the surface to match with the existing surface all as specified and directed. | |||||||||||||||
| 6.00(d) Note : The work under (Item No. 2 to 5 of BOQ) shall be carried out through authorized and qualified applicators of the any following manufacturer only. M/s Sika India Pvt Ltd, M/s Fosroc Chemicals, M/s STP Limited, M/s BOSTIk India pvt limited,M/s Thermax Limited | |||||||||||||||
| 7.00(i) A performance guarantee certificate for two years shall be submitted by the contractor to the GE on completion of work as specified. | |||||||||||||||
| 8.00(ii) The unit rate quoted for item No. 2 to 5 of BOQ is deemed to be included for Removing of accumulated earth of any width and depth upto 15 cm cleaning/cutting the grass with hand operated petrol/kerosene driven grass cutting machine and removing the grass waste around 3 m from plinth protection to outside MD land Note: Periodicity of cutting of grass shall be before commencement of work and after completion of repairs. | |||||||||||||||
| 9.00 | Complete removal of existing treatment of old walls and washing, rubbing down, applying two coat smartcare damp block 2K or equivalent @ 15sqft/kg to arrest the dampness of wall/ceiling and finish the surface with water proofing putty of 1mm thick even smooth and two coats of oil bond distemper over a coat of primer complete all as specified and directed.
Note: (i) The unit quoted rate shall be inclusive of material,any helght of bldg of any size and all labours, tools and plants including scaffolding required for working upto approx 25 mtr height from natural ground level and nothing extra shall be admissible on this account.
(ii) Adoption of necessary safety arrangement like safety belts, ropes, helmets, netting etc. which are required for safety of working labour at height exceeding 3 to 25 mtr height shall be mandatary and deemed to be included in the unit rate quoted. | 450 | Sqm | 200 ₹90,000 | 200 ₹90,000 | 250 ₹1,12,500 | 232 ₹1,04,400 | 165 ₹74,250 Lowest | 181 ₹81,450 | 230 ₹1,03,500 | 200 ₹90,000 | 212 ₹95,400 | 227 ₹1,02,150 | 165 ₹74,250 Lowest | 230 ₹1,03,500 |
| 10.00 | M & L preparation of old surfaces by complete removal of existing treatment of wall by using pressure washer, of exterior wall decorating and water proofing treatment to wall surface by wire brushing in order to remove dust, dirt, loose particles, laitance. Thereafter wash the surface with clean water & allow to dry.Making groove as requirment according to crack, clean with water, Fill visible cracks/ joints by smart care crack sealer caulking compound & allow to dry for 24 hours. Apply a primer coat of (apex ultima protek base coat or equivalent) and allow to dry for 6 hours. Thereafter apply 02 coats of Weather coat (apex ultima protek top coat or equivalent) & shade by brush at the interval of 08 hours between the coat and allow to dry to match the existing shade including necessary scaffolding for any height, covering etc ( as approved by GE) and all as per manufacturer instructions and all as specified and directed.
Note: (i) The unit quoted rate shall be inclusive of material,any height of bldg of any size and all labours, tools and plants including scaffolding required for working upto approx 25 mtr height from natural ground level and nothing extra shall be admissible on this account.
(ii) Adoption of necessary safety arrangement like safety belts, ropes, helmets, netting etc. which are required for safety of working labour at height exceeding 3 to 35 mtr height shall be mandatary and deemed to be included in the unit rate quoted. | 150 | Sqm | 220 ₹33,000 | 200 ₹30,000 | 230 ₹34,500 | 303 ₹45,450 | 165 ₹24,750 Lowest | 201 ₹30,150 | 220 ₹33,000 | 200 ₹30,000 | 202 ₹30,300 | 218 ₹32,700 | 165 ₹24,750 Lowest | 200 ₹30,000 |
Tender Value
Refer Docs
EMD Value
₹99,900
Closing Date
14 Jul 2026, 6:00 pmClosed
Garrison Engineer M AF Jalahalli
Garrison Engineer M AF Jalahalli Bangalore 560013
REPAIR MAINT TO DAMAGED ROOF WALL OF BLDGS LEAKAGE SEEPAGE TREATMENT PLUMBING WORK AND OTHER MISC B R WORKS AT AFTC AND AFS JALAHALLI
2026_MES_774345_1
8351/E8
Open Tender
Civil Works
Item Rate
180 days
Garrison Engineer M AF Jaalahalli
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Garrison Engineer M AF Jalahalli
₹99,900
Yes
25 Jul 2026
23 Jun 2026
21 Jul 2026
23 Jun 2026
14 Jul 2026
7 Jul 2026
23 Jun 2026 - 30 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L Repair to ends of chajjas/ parapets by removing old concrete, loose material & cleaning of the reinforcement and finishing the surface with rich cement mortar 1:3 , finished fair & even and making good with existing finishes complete all as specified and as directed.
Note: Rate quoted by the tenderer shall be deemed to inclusive of double steel scaffolding. | 25 | Each Job | - | - |
| 2 | M&L for Dismantling/ taking down old existing unserviceable cement plaster, loose/ unsound weaken cement concrete of any description and in any position from existing external / internal surface of RCC roof/ slab/ beams/ columns/ RCC facias for an average depth of 25mm (Approx height 7.5m from natural ground level) with power driven pneumatic flat/pointed chisel and removing the honeycombed area including all the corners and making a neat profile of the cavities, roughen the smooth surface , scrapping out/removing corrosion all loose/scale/rust etc form the visible reinforcement by applying rust remover such as Rust Off 100 of make M/s Sika India Pvt Ltd, or equivalent in M/s Fosroc Chemicals, M/s BOSTIk India pvt limited, M/s STP Limited, M/s Thermax Limited( as approved by GE) and cleaning the steel reinforcement properly all as per manufacturer instructions and all as specified and directed and comprising of below mentioned process :- | 40 | Sqm | - | - |
| 3 | (a) Providing cement based admixed with Sikacim, integral waterproofing liquid M/s Sika India Pvt Ltd, or equivalent in M/s Fosroc Chemicals, , M/s BOSTIk India pvt limited, M/s STP Limited, M/s Thermex Ltd (as approved by GE) @ 0.2% by weight of cement or as per manufacturer’s instructions over a coat of acrylic emulsion bonding agent such as per as Sika Latex in 1:1:3 ratio of Make M/s Sika India Pvt Ltd, or equivalent in M/S Fosroc chemicals, M/s BOSTIk India pvt limited, M/s STP Limited, M/s Thermex Ltd (as approved by GE) having specific gravity of 1.02 or as per manufacturer’s instructions with necessary surface preparation such as creating mechanical key like roughening the surface by scrabbing, grit blasting and cleaning the existing surface using high pressure water jet machine having pressure upto 500 bar pressure to remove the dirt, dust, loose particles , wax, efforencene and other contaminations from the surface of RCC columns/ beams/ slabs/ facia/ any brick/ stone surfaces etc all as per manufacturer instructions and all as specified and directed by Engineer-in-Charge. | - | - | - | - |
| 4 | (b) Providing and applying FRIAZINC R, corrosion inhabiliting Active Zinc rich primer of make M/s Sika India Pvt Ltd, or equivalent in M/s Fosroc Chemicals, , M/s BOSTIk India pvt limited, M/s STP Limited, M/s Thermex Ltd (as approved by GE) along the exposed reinforcement surface property and allowed to dry. | - | - | - | - |
| 5 | (c) Providing and applying Hibond, Epoxy based Thixotropic bonding adhesive of Make of M/s Sika India Pvt Ltd, or equivalent in M/s Fosroc Chemicals, M/s BOSTIk India pvt limited, M/s STP Limited, M/s Thermex Ltd ( as approved by GE) over the prepared concrete surface to get a good bonding between existing concrete surface and providing Sika Rep Microcrete 4 Fiber reinforced cementitious repair micro concrete of make M/s Sika India Pvt Ltd, or equivalent in M/s Fosroc Chemicals, M/s BOSTIk India pvt limited, M/s STP Limited, M/s Thermex Ltd ( as approved by GE) over Epoxy based bonding agent applied area before 6 Hrs etc including providing necessary proportions , bracing and runners to relieve the member from the load coming on it including scaffolding leak proof shuttering with working platform as required and as per design and pattern complete including preparing the surface to match with the existing surface all as specified and directed. | - | - | - | - |
| 6 | (d) Note : The work under (Item No. 2 to 5 of BOQ) shall be carried out through authorized and qualified applicators of the any following manufacturer only.
M/s Sika India Pvt Ltd, M/s Fosroc Chemicals, M/s STP Limited, M/s BOSTIk India pvt limited,M/s Thermax Limited | - | - | - | - |
| 7 | (i) A performance guarantee certificate for two years shall be submitted by the contractor to the GE on completion of work as specified. | - | - | - | - |
| 8 | (ii) The unit rate quoted for item No. 2 to 5 of BOQ is deemed to be included for Removing of accumulated earth of any width and depth upto 15 cm cleaning/cutting the grass with hand operated petrol/kerosene driven grass cutting machine and removing the grass waste around 3 m from plinth protection to outside MD land Note: Periodicity of cutting of grass shall be before commencement of work and after completion of repairs. | - | - | - | - |
| 9 | Complete removal of existing treatment of old walls and washing, rubbing down, applying two coat smartcare damp block 2K or equivalent @ 15sqft/kg to arrest the dampness of wall/ceiling and finish the surface with water proofing putty of 1mm thick even smooth and two coats of oil bond distemper over a coat of primer complete all as specified and directed.
Note: (i) The unit quoted rate shall be inclusive of material,any helght of bldg of any size and all labours, tools and plants including scaffolding required for working upto approx 25 mtr height from natural ground level and nothing extra shall be admissible on this account.
(ii) Adoption of necessary safety arrangement like safety belts, ropes, helmets, netting etc. which are required for safety of working labour at height exceeding 3 to 25 mtr height shall be mandatary and deemed to be included in the unit rate quoted. | 450 | Sqm | - | - |
| 10 | M & L preparation of old surfaces by complete removal of existing treatment of wall by using pressure washer, of exterior wall decorating and water proofing treatment to wall surface by wire brushing in order to remove dust, dirt, loose particles, laitance. Thereafter wash the surface with clean water & allow to dry.Making groove as requirment according to crack, clean with water, Fill visible cracks/ joints by smart care crack sealer caulking compound & allow to dry for 24 hours. Apply a primer coat of (apex ultima protek base coat or equivalent) and allow to dry for 6 hours. Thereafter apply 02 coats of Weather coat (apex ultima protek top coat or equivalent) & shade by brush at the interval of 08 hours between the coat and allow to dry to match the existing shade including necessary scaffolding for any height, covering etc ( as approved by GE) and all as per manufacturer instructions and all as specified and directed.
Note: (i) The unit quoted rate shall be inclusive of material,any height of bldg of any size and all labours, tools and plants including scaffolding required for working upto approx 25 mtr height from natural ground level and nothing extra shall be admissible on this account.
(ii) Adoption of necessary safety arrangement like safety belts, ropes, helmets, netting etc. which are required for safety of working labour at height exceeding 3 to 35 mtr height shall be mandatary and deemed to be included in the unit rate quoted. | 150 | Sqm | - | - |
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
8351GENPAGE.pdf
Tender Documents • 0.45 MB
BOQ_867081.xls
BOQ • 0.36 MB
8351PS.pdf
Additional Documents • 0.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .