Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical GRAM HAZRATPUR PO SAHKARI NAGAR DISTRICT BULANDSHAHR | BULANDSHAHR | BULANDSHAHR | UTTAR PRADESH | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical 19 NEW PARBHAT NAGAR MEERUT | Admitted-Fee/PreQual/Technical |
Tender Value
₹67 L
EMD Value
₹5.3 L
Closing Date
26 Mar 2026, 12:00 pmClosed
SE BSR Circle PWD Bulandshahr
SE BSR Circle PWD Bulandshahr
Reconstruction work of 7.00 meter span minor bridge on Shekhupura Raura to Jahangirabad via Bhaiyapur roa
2026_CEMRT_1128523_1
2103/96M/E-Tender/BSr Circle/2025-26 Dt.16.02.26
Open Tender
Civil Works - Bridges
Percentage
180 days
Bulandshahr
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹5.3 L
Yes
SE BSR Circle PWD Bulandshahr
7 Apr 2026
21 Mar 2026
26 Mar 2026
21 Mar 2026
26 Mar 2026
21 Mar 2026
21 Mar 2026 - 23 Mar 2026
23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1R.C.C. Box culvert 7.0X3.0X1 m (Part A) Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres As per Clause 202 Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST. | |||||
| 2Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical SpecificationSr No. 2.5 Ref No.202 Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST. | |||||
| 3Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST. | |||||
| 4Providing concrete for Plain/Reinforced cement concrete (P.C.C Grade M-10)in open foundation complete as per drawing and technical specifications Clauses 802,803,1202&1203 Sr No. 11.4 Ref No.800 & 1200 (PCC M-10) Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST. | |||||
| 5Providing concrete for Plain/Reinforced cement concrete (P.C.C Grade M-20) in open foundation complete as per drawing and technical specifications Clauses 802,803,1202&1203 Sr No. 11.4 Ref No.800 & 1200 (PCC grade M 20) Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST. | |||||
| 6RCC M25 Providing concrete for Plain/Reinforced cement concrete in sub structuren complete as per drawing and technical specifications Clauses 802,803,1202&1203 Sr No. 12.5 Ref No.800 Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST. | |||||
| 7RCC M25 Providing concrete for Plain/Reinforced cement concrete in super structure complete as per drawing and technical specifications Clauses 802,803,1202&1203 Sr. No. 13.1 Ref. No. 800 Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST. | |||||
| 8Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications MORTH 14.04(2702) Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST. | |||||
| 9Supplying, Fitting and Placing TMT bar Reinforcement (Fe 415) in substructure complete as per Drawing and Technical Specifications. Clauses 1002,1005,1010 & 1202 Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST. | |||||
| 10Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification.MORTH 14.2 Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST. | |||||
stage.html
html • 0.03 MB
cancelled_1.pdf
pdf • 0.28 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
T2.pdf
Tender Documents • 1.62 MB
BOQ_2104848.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .