Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹10.8 Cr
EMD Value
₹22.1 L
Closing Date
13 Oct 2026, 12:00 pmDue today
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
SE, BSR CIRCLE, PWD, BULANDSHAHR
SE, BSR CIRCLE, PWD, BULANDSHAHR
Widening and strengthening work of Chhaprawat-Kota-Sanota Road (ODR) from Chainage 0.000 to Chainage 5.100 km in Bulandshahr District
2026_CEMRT_1193728_3
9050/96M (II)/E-TENDER/BSR CIRCLE/2025-26 Dated 10-09-2026
Open Tender
Civil Works - Roads
Item Rate
270 days
SE, BSR CIRCLE, PWD
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,714
₹22.1 L
SE, BSR CIRCLE, PWD, BULANDSHAHR
7 Oct 2026
7 Oct 2026
13 Oct 2026
7 Oct 2026
13 Oct 2026
7 Oct 2026
8 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MORT&H Specification Including cost of all material, labour, T&P, royalty, labour cess, all taxes complete, but excluding cost GST. | 20,500 | Sqm | - | - |
| 2 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m.Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. | 5,000 | Cum | - | - |
| 3 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. | 9,700 | Cum | - | - |
| 4 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. | 2,890 | Cum | - | - |
| 5 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. | 3,750 | Cum | - | - |
| 6 | (Cement Treated base).Providing laying and spreading of graded stone aggregate (WMM) after mixing with 4 % Ordenary portland cement with water of OMC in Mechanical mix plant carriage of mixed material by tipper to site. Lying in uniform single layer sub base/sub grade (Modified soil) and compacting with the road roller to achive unconfined compressive strength as specified by Enginner-in-charge.. Including cost of all material, labour, T&P,and royalty but excluding cost of GST. | 4,130 | Cum | - | - |
| 7 | Providing and applying primer coat with SS-1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. | 23,400 | Sqm | - | - |
| 8 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. | 935 | Cum | - | - |
| 9 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing..Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. | 325 | Cum | - | - |
| 10 | Construction of un-reinforced, dowl jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30(Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges,steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer,sealant, dowel bars near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Cum Floter-Trimix Flooring Machine. Technical Specification Clause 1501 S.I. No.20.12 (b).Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. | 620 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
Tendernotice_2.pdf
PDF • 0.23 MB
SBD.pdf
Tender Documents • 1.29 MB
BOQ_2253710.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .