Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹94.1 LAccepted-AOC ERODE 638 152 | ERODE | TAMIL NADU | 638152 | ₹94.1 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹98.9 LRejected-AOC | ₹98.9 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | VRR CONSTRUCTION | SMT CONSTRUCTIONS |
|---|---|---|---|---|---|
| 1.00Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. - Earth work excavation for foundation in all soils and sub-soils | |||||
| 2.00 | 0 to 2 m Data- 1.a | 443 | Cu.m | 1,00,118 ₹1.2 L | 1,10,750 ₹1.3 L |
| 3.00 | 2m to 4m Data- 1.b | 443 | Cu.m | 1,05,877 ₹1.2 L | 1,11,193 ₹1.3 L |
| 4.00 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. Data-5 | 16 | Cu.m | 23,952 ₹28,263.36 | 25,152 ₹29,679.36 |
| 5.00 | Plain Cement concrete 1:4:8 (one cement, five sand and ten aggregate) 100mm thick using 20mm metal for foundation and flooring using hard broken granite stone jelly including dewatering, shoring, strutting wherever necessary and curing etc. complete complying with standard specification. Data-9 | 24 | Cu.m | 1,29,168 ₹1.5 L | 1,35,624 ₹1.6 L |
| 6.00Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid) (Side Shuttering) | |||||
| 7.00Vertical Shuttering | |||||
| 8.00 | 0-0.90m Data-15/a-ii | 699 | Sq.m | 9,32,466 ₹11.0 L | 9,79,299 ₹11.6 L |
| 9.00Beam, Slab shuttering | |||||
| 10.00 | Upto 90cm Data-15/a-i | 140 | Sq.m | 1,55,680 ₹1.8 L | 1,63,380 ₹1.9 L |
Tender Value
₹96 L
EMD Value
₹96,000
Closing Date
11 Aug 2025, 3:00 pmClosed
THE COMMISSIONER TAMBARAM CORPORATION
TCMC Main Office
Construction UG SUMP in New Corporation office Building at SF No218/2,226/1,227 in Tambaram City Municipal Corporation Tamabaram
2025_DMA_589343_4
340/2025/E1/Z4
Open Tender
Civil Works
90 days
TCMC Main Office
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹96,000
19 May 2026
5 Aug 2025
11 Aug 2025
5 Aug 2025
11 Aug 2025
5 Aug 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.69 MB
BOQ_704043.xls
BOQ • 0.36 MB
5.pdf
Tender Documents • 0.73 MB
Download all tender documents and submit your bid