Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.6 CrAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹16.0 Cr+₹1.4 Cr (9.65%)Rejected-Finance NOT SPECIFIED | L2 | Rejected-Finance L2 | |
| 3 | L3₹16.8 Cr+₹2.2 Cr (15.2%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹18.1 Cr+₹3.5 Cr (24.2%)Rejected-Finance PLOT 9 BESIDES HANUMAN MANDER RAMASREYA KA PURWA GOMITI NAGAR LUCKNOW | LUCKNOW | LUCKNOW | UTTAR PRADESH | L4 | Rejected-Finance L4 | |
| 5 | Not Admitted-Fee/PreQual/Technical KRISHNA COMPLEX JAIN COLLEGE ROAD SAHARANPUR UTTAR PRADESH PIN CODE 247001 | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹19 Cr
EMD Value
₹38 L
Closing Date
7 May 2020, 2:00 pmClosed
SE XITH CIRCLE AYODHYA
SE XI TH CIRCLE IRRIGATION WORKS AYODHYA
LOT 02 FLOOD PROTECTION WORKS BETWEEN KM-17.395 TO KM-18.095 OF CHAHLARI GHAT GANESHPUR BUNDH ON ON RIGHT BANK RIVER GHAGHRA IN DISTRICT SITAPUR
2020_UPIDC_463832_1
01/SEXI/2020-21
Open Tender
Civil Works
Item Rate
90 days
SITAPUR
AS PER TENDER DOCUMENT
2 documents required · 2 mandatory
₹8,614
E E FLOOD WORKS DIVISION AYODHYA
₹38 L
24 Jun 2020
29 Apr 2020
7 May 2020
29 Apr 2020
7 May 2020
29 Apr 2020
Amount
Earth work in digging for Launching Apron in ordinary soil including hard clay, chharri, and bajari upto 5% with all lead, lifts, labour and T&P etc. required for proper completion of work.
Supplying & Laying New Empty Cement Bag filled with Earth/RBM & Sewing it by machine and filling it in Nylon Crate Size (1.00X1.00 X1.00) m having mesh Size 200X200mm For making Platform/Base of Revetment etc Complete.
Earth Work in filling in Construction of Spur Shank in all lead, lifts, labour and T&P etc. required for proper completion of work.
Supplying & Laying of Mirzapur Stone Boulder in GI Wire Crate (1.50x1.50x1.00m mesh size 200x200mm with 8 SWG GI wire) for Launching Apron including cost of all material, labour, lead, lift, T&P etc required for proper completion of work.
Supplying & Laying of Mirzapur Stone Boulder in Launching Apron (without Wire Crate) including cost of all material, labour, lead, lift, T&P etc required for proper completion of work.
Supplying & Laying Geo Textile Sheet 200 GSM made with woven multifilament polypropylene yarn below boulder pitching including cost of all material, labour, lead, lift, T&P etc required for proper completion of work.
Laying Earth Cover over Geo Textile Sheet in all lead & lift including cost of labour, T&P etc. complete required for proper completion of work.
Supplying & Laying Mirzapur Stone Boulder in Pitching including cost of all material, labour, lead, lift, T&P etc required for proper completion of work.
E/W in cutting for slope pitching and launching apron i/c all lead & lift and proper disposal of earth etc complete.
E/W in Cutting of old damage bund for making setback of bund between km-17.535 to km-17.835 in all lead & lift and proper manual compaction and dressing etc complete.
E/W in Filling for making setback of bund between km-17.535 to km-17.835 by transported earth in all lead and lift proper manual compaction and dressing etc complete.
M/S R.P. SINGH AND COMPANY
M/s Bhardwaj Constructions
LAXMINARAIN INFRABUILD PRIVATE LIMITED
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .