Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-Finance N A | FARIDABAD | HARYANA | 121004 | L1 | Accepted-Finance ok | |
| 2 | L2₹3.6 L+₹31,920 (9.62%)Accepted-Finance MANDI HIMACHAL PRADESH | LAHUL AND SPITI | HIMACHAL PRADESH | 175133 | L2 | Accepted-Finance ok | |
| 3 | L3₹4.1 L+₹78,825.75 (23.8%)Accepted-Finance | L3 | Accepted-Finance ok |
Tender Value
₹4.8 L
EMD Value
₹12,090
Closing Date
21 Feb 2022, 5:00 pmClosed
Commissioner MC Solan
Commissioner MC Solan
Channelaization of nallah and flooring upto Naroh Vilage in ward no.8
2022_UDDHP_56660_1
5621-24 dt. 31.01.2022
Open Tender
Civil Works
Item Rate
60 days
MC Solan
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Commissioner
₹12,090
25 Mar 2022
10 Feb 2022
22 Feb 2022
10 Feb 2022
21 Feb 2022
10 Feb 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of Engineer-in-charge. Note - item to be applicable in urban areas having directions for restricted hours for movement/ plying of load carrying motor vehicle of 3.5 cum or more.
Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size)
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:1:3:6 (1 cement : 3 coarse sand) : 6 graded stone aggregate 20 mm nominal size)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size)
Surender Kumar
Nain Singh
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .