Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | NA₹174.47Accepted-AOC | NA | Accepted-AOC Awarded | |
| 2 | NA₹174.47Accepted-AOC | NA | Accepted-AOC Awarded | |
| 3 | NA₹174.47Accepted-AOC 105 APR COLONY KATANGA JABALPUR MADHYA PRADESH 482001 | JABALPUR | MADHYA PRADESH | 482001 | NA | Accepted-AOC Awarded | |
| 4 | NA₹174.47Accepted-AOC | NA | Accepted-AOC Awarded | |
| 5 | NA₹174.47Accepted-AOC | NA | Accepted-AOC Awarded |
| Sl No | Description | Qty | Unit | Electrofront Transpower Pvt Ltd L1 | NISHANT TRANSFORMER L27 | Sanjay Electricals and Engineering Works L36 | NIRMAN UDYOG L1 | Digamber Electricals L26 | Malwal Electricals L15 | Dynopower System Equipments L46 | Wireman Electricals Pvt. Ltd. L43 | ANANT SALES CORPORATION L5 | M/S BANSALA ENGINEERS POWERTECH LLP L31 | K. P. S. ENTERPRISES L32 | ADITI ELECTRICALS L18 | Transtech Engineer L41 | ANGIRA ELECTRICAL INDUSTRIES L1 | Power Batteries (Trf.Div.) L45 | Om Enterprises L1 | KRISHNA POWER L10 | Pragya Enterprises L22 | JEEVAN JYOTI TRANSFORMERS L21 | SIGNAL and TELECOM CONST INDIA L28 | Electrotech Transmission P L L39 | PRECISION POLES PVT LTD L1 | TESLA TRANSMISSION CONTROL (TRANSFORMER DIVISION) L12 | MP SALES L8 | New Aman Industries L34 | Narmada Construction L1 | SHAMA ELECTRICALS L1 | Dayalok Transformers Private Limited L13 | JYOTI POWER CONTROLS L2 | P L TRANSFORMERS L1 | Power tech industries L9 | TRISHUL ELECTRICALS L1 | M/S NIRMAL TRANSFORMERS-NIMBAHERA L1 | jai ambey electricals L1 | SANJAY AGRO PIPE L1 | UNISONS FIELDS SERVICES L1 | Raj Transformer And Electrical Equipment L7 | S. B. INDUSTRIES L19 | TOP TECH POWERS L29 | GAGAN JYOTI TRANSFORMERS L1 | NORAN TRANSMISSION PVT LTD L1 | AKANSHA TRANSFORMAR L1 | JABALPUR ENERGY L1 | Royal Enterprises L20 | Electromech engineers L40 | MALWA UDYOG L35 | ARVIND ELECTRICALS L1 | APURVA INDUSTRIES L1 | AR TRANSFORMERS PRIVATE LIMITED L30 | DHARMA TRANSFORMER AND CONTROL PANEL L1 | RIYA INDUSTRIES L1 | Kajal Transformers L1 | Shrinath Transformers L42 | LALIT INDUSTRIES L47 | Pradeep Enterprises L1 | R AND D TRANSFORMERS L44 | SHREE KAALIKA POWER & TECHNOCRATS (OPC) PRIVATE LIMITED L1 | ARANYA TRANSFORMERS L1 | ARPIT ENTERPRISES L1 | SHRI SATI INDUSTRIES L1 | urjadhara industries pvt ltd L1 | UDGAM INDUSTRIES L1 | SHUBHAM CONSTRUCTION L1 | R. K. ELECTRICAL L1 | MICHAEL INDUSTRIES L1 | M K INDUSTRIES L41 | AGARWAL INFRASTRUCTURE L1 | SHRIRAM ELECTRICALS L1 | UNIVERSAL POWER TECH L1 | RENU ELECTRICALS AND TRANSFORMER L3 | PREMIER CONDUCTORS PRIVATE LIMITED L1 | AMIT ENTERPRISES L1 | Vindhyanchal Electrical L1 | DATTA ELECTRO FABRICATORS L25 | SHRIAA ENTERPRISES L1 | AMAN POWER SOLUTIONS L1 | RSS ELECTRICAL INDUSTRIES L1 | SHRESHTH POWERTECH ENGINEERING CO L1 | A ONE ELECTRICALS L1 | A.G. ENTERPRISES L1 | SHIVANG INDUSTRIES L1 | SHALINI D/O MAHENDRA SINGH CHOUHAN L4 | SURYA ENGINEERS L1 | Maahadev Transformer L1 | Sheel Engineering Industries L16 | M/s Subh Laxmi Transformer L48 | INDIAN TRANSFORMER WORK VISION L1 | UV TRANSFORMER L1 | Prakamya Electricals L6 | SHRI LAXMI INFRA POWER L1 | SHRI LAXMI INDUSTRIES L23 | BHUWAN JYOTI TRANSFORMERS L14 | Moulik Electricals L1 | FUSION INDUSTRIES L1 | Kiran Industries L37 | SIDHI VINAYAK TRANSFORMERS L38 | NOVUS ELECTROTECH LIMITED L17 | SHUBHAM ELECTRICALS L11 | POWER TRANSMISSION SYSTEMS L1 | RISHU ELECTRICALS L1 | DEV TRANSFORMERS L33 | PHOTON TRANSFORMER L24 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Price schedule I (A) Net reparing cost 16 KVA Non-Star ( only new design) | 16 | KVA | - | 13,688 ₹13,688 | 11,800 ₹11,800 | - | 11,634.8 ₹11,634.8 | 16,166 ₹16,166 | 16,455.1 ₹16,455.1 | 14,449.1 ₹14,449.1 | 11,564 ₹11,564 | 11,994.7 ₹11,994.7 | 12,036 ₹12,036 | 11,033 ₹11,033 Lowest | 13,536.96 ₹13,536.96 | - | 11,890.86 ₹11,890.86 | - | 11,092 ₹11,092 | 12,366.4 ₹12,366.4 | 11,742.31 ₹11,742.31 | 11,988.8 ₹11,988.8 | 13,548.76 ₹13,548.76 | - | 11,092 ₹11,092 | 11,210 ₹11,210 | 11,912.1 ₹11,912.1 | - | - | 15,416.7 ₹15,416.7 | 14,018.4 ₹14,018.4 | - | 11,210 ₹11,210 | - | - | - | - | - | 11,186.4 ₹11,186.4 | 11,994.7 ₹11,994.7 | 12,142.2 ₹12,142.2 | - | - | - | - | 12,248.4 ₹12,248.4 | 13,539.32 ₹13,539.32 | 12,154 ₹12,154 | - | - | 11,859 ₹11,859 | - | - | - | 13,629 ₹13,629 | 21,358 ₹21,358 | - | 14,490.4 ₹14,490.4 | - | - | - | - | - | - | - | - | - | 13,924 ₹13,924 | - | - | - | 14,299.24 ₹14,299.24 | - | - | - | 13,922.82 ₹13,922.82 | - | - | - | - | - | - | - | 12,626 ₹12,626 | - | - | 11,210 ₹11,210 | 16,402 ₹16,402 | - | - | 14,455 ₹14,455 | - | 11,796.46 ₹11,796.46 | 11,499.24 ₹11,499.24 | - | - | 16,024.4 ₹16,024.4 | 13,452 ₹13,452 | 15,310.5 ₹15,310.5 | 12,163.44 ₹12,163.44 | - | - | 13,422.5 ₹13,422.5 | 13,899.22 ₹13,899.22 |
| 1.10 | Price schedule I (A) Net reparing cost 16 KVA BEE Level-1(Old)/Level 2 (Old) | 16 | KVA | - | 14,044.36 ₹14,044.36 | 12,508 ₹12,508 | - | 11,823.6 ₹11,823.6 | 17,788.5 ₹17,788.5 | 18,172 ₹18,172 | 17,405 ₹17,405 | 10,478.4 ₹10,478.4 Lowest | 13,735.2 ₹13,735.2 | 13,747 ₹13,747 | 11,298.5 ₹11,298.5 | 13,684.46 ₹13,684.46 | - | 12,952.86 ₹12,952.86 | - | 11,894.4 ₹11,894.4 | 12,425.4 ₹12,425.4 | 15,249.64 ₹15,249.64 | 13,640.8 ₹13,640.8 | 13,703.34 ₹13,703.34 | - | 11,918 ₹11,918 | 11,800 ₹11,800 | 13,109.8 ₹13,109.8 | - | - | 16,697 ₹16,697 | 16,166 ₹16,166 | - | 11,752.8 ₹11,752.8 | - | - | - | - | - | 11,941.6 ₹11,941.6 | 12,980 ₹12,980 | 13,676.2 ₹13,676.2 | - | - | - | - | 12,307.4 ₹12,307.4 | 13,688.89 ₹13,688.89 | 13,216 ₹13,216 | - | - | 13,233.7 ₹13,233.7 | - | - | - | 14,927 ₹14,927 | 23,275.5 ₹23,275.5 | - | 17,446.3 ₹17,446.3 | - | - | - | - | - | - | - | - | - | 15,694 ₹15,694 | - | - | - | 16,489.32 ₹16,489.32 | - | - | - | 18,166.1 ₹18,166.1 | - | - | - | - | - | - | - | 13,983 ₹13,983 | - | - | 11,918 ₹11,918 | 17,582 ₹17,582 | - | - | 13,363.5 ₹13,363.5 | - | 12,391.18 ₹12,391.18 | 14,911.09 ₹14,911.09 | - | - | 17,623.3 ₹17,623.3 | 13,452 ₹13,452 | 16,638 ₹16,638 | 12,799.46 ₹12,799.46 | - | - | 13,422.5 ₹13,422.5 | 18,136.6 ₹18,136.6 |
| 1.20 | Price schedule I (A) Net reparing cost 25 KVA Non-Star ( only new design) | 25 | KVA | - | 30,045.16 ₹30,045.16 | 28,616.18 ₹28,616.18 | - | 28,969 ₹28,969 | 29,116.5 ₹29,116.5 | 29,323 ₹29,323 | 28,939.5 ₹28,939.5 | 27,381.9 ₹27,381.9 | 28,967.82 ₹28,967.82 | 28,969 ₹28,969 | 28,553.64 ₹28,553.64 | 29,107.06 ₹29,107.06 | - | 29,118.86 ₹29,118.86 | - | 28,178.4 ₹28,178.4 | 28,945.4 ₹28,945.4 | 28,161.44 ₹28,161.44 | 28,862.8 ₹28,862.8 | 29,134.2 ₹29,134.2 | - | 28,792 ₹28,792 | 28,868.7 ₹28,868.7 | 29,181.4 ₹29,181.4 | - | - | 27,612 ₹27,612 | 26,042.6 ₹26,042.6 Lowest | - | 28,915.9 ₹28,915.9 | - | - | - | - | - | 28,674 ₹28,674 | 28,986.7 ₹28,986.7 | 28,898.2 ₹28,898.2 | - | - | - | - | 28,969 ₹28,969 | 29,101.16 ₹29,101.16 | 28,674 ₹28,674 | - | - | 28,827.4 ₹28,827.4 | - | - | - | 29,116.5 ₹29,116.5 | 29,323 ₹29,323 | - | 29,016.2 ₹29,016.2 | - | - | - | - | - | - | - | - | - | 29,146 ₹29,146 | - | - | - | 26,564.16 ₹26,564.16 | - | - | - | 26,349.4 ₹26,349.4 | - | - | - | - | - | - | - | 27,553 ₹27,553 | - | - | 28,674 ₹28,674 | 28,762.5 ₹28,762.5 | - | - | 27,635.6 ₹27,635.6 | - | 28,966.64 ₹28,966.64 | 27,994.35 ₹27,994.35 | - | - | 28,396.7 ₹28,396.7 | 29,028 ₹29,028 | 27,789 ₹27,789 | 28,851 ₹28,851 | - | - | 28,821.5 ₹28,821.5 | 26,378.9 ₹26,378.9 |
| 1.30 | Price schedule I (A) Net reparing cost 25 KVA BEE Level-1(Old)/Level 2 (Old) | 25 | KVA | - | 33,606.4 ₹33,606.4 | 32,118.42 ₹32,118.42 | - | 32,190.4 ₹32,190.4 | 14,248.5 ₹14,248.5 Lowest | 32,868.9 ₹32,868.9 | 32,450 ₹32,450 | 31,954.4 ₹31,954.4 | 32,189.22 ₹32,189.22 | 32,155 ₹32,155 | 31,093 ₹31,093 | 32,824.06 ₹32,824.06 | - | 32,540.86 ₹32,540.86 | - | 31,588.6 ₹31,588.6 | 32,131.4 ₹32,131.4 | 32,103.41 ₹32,103.41 | 32,048.8 ₹32,048.8 | 32,809.9 ₹32,809.9 | - | 32,214 ₹32,214 | 32,160.9 ₹32,160.9 | 32,804 ₹32,804 | - | - | 31,423.4 ₹31,423.4 | 27,907 ₹27,907 | - | 31,960.3 ₹31,960.3 | - | - | - | - | - | 32,143.2 ₹32,143.2 | 32,155 ₹32,155 | 31,730.2 ₹31,730.2 | - | - | - | - | 32,190.4 ₹32,190.4 | 32,818.16 ₹32,818.16 | 32,509 ₹32,509 | - | - | 32,662.4 ₹32,662.4 | - | - | - | 32,686 ₹32,686 | 32,509 ₹32,509 | - | 32,532.6 ₹32,532.6 | - | - | - | - | - | - | - | - | - | 32,568 ₹32,568 | - | - | - | 28,465.14 ₹28,465.14 | - | - | - | 29,806.8 ₹29,806.8 | - | - | - | - | - | - | - | 30,562 ₹30,562 | - | - | 32,096 ₹32,096 | 32,184.5 ₹32,184.5 | - | - | 31,281.8 ₹31,281.8 | - | 32,769.78 ₹32,769.78 | 31,883.89 ₹31,883.89 | - | - | 31,759.7 ₹31,759.7 | 32,745 ₹32,745 | 31,547.3 ₹31,547.3 | 31,978 ₹31,978 | - | - | 32,509 ₹32,509 | 29,777.3 ₹29,777.3 |
| 1.40 | Price schedule I (A) Net reparing cost 63 KVA Non-Star ( only new design) | 63 | KVA | - | 40,780.8 ₹40,780.8 | 36,156.38 ₹36,156.38 | - | 36,025.4 ₹36,025.4 | 36,698 ₹36,698 | 36,993 ₹36,993 | 36,403 ₹36,403 | 34,314.4 ₹34,314.4 | 35,941.62 ₹35,941.62 | 36,049 ₹36,049 | 36,459.64 ₹36,459.64 | 36,688.56 ₹36,688.56 | - | 36,906.86 ₹36,906.86 | - | 36,049 ₹36,049 | 35,919.2 ₹35,919.2 | 36,295.51 ₹36,295.51 | 35,942.8 ₹35,942.8 | 36,674.4 ₹36,674.4 | - | 36,462 ₹36,462 | 35,754 ₹35,754 | 37,022.5 ₹37,022.5 | - | - | 35,293.8 ₹35,293.8 | 35,128.6 ₹35,128.6 | - | 35,824.8 ₹35,824.8 | - | - | - | - | - | 36,178.8 ₹36,178.8 | 35,901.5 ₹35,901.5 | 35,978.2 ₹35,978.2 | - | - | - | - | 35,942.8 ₹35,942.8 | 36,682.66 ₹36,682.66 | 36,403 ₹36,403 | - | - | 36,408.9 ₹36,408.9 | - | - | - | 36,698 ₹36,698 | 37,229 ₹37,229 | - | 36,485.6 ₹36,485.6 | - | - | - | - | - | - | - | - | - | 37,052 ₹37,052 | - | - | - | 33,995.8 ₹33,995.8 Lowest | - | - | - | 36,084.4 ₹36,084.4 | - | - | - | - | - | - | - | 35,577 ₹35,577 | - | - | 36,344 ₹36,344 | 37,760 ₹37,760 | - | - | 35,577 ₹35,577 | - | 36,036.02 ₹36,036.02 | 36,025.21 ₹36,025.21 | - | - | 36,025.4 ₹36,025.4 | 36,698 ₹36,698 | 35,547.5 ₹35,547.5 | 35,783.5 ₹35,783.5 | - | - | 36,285 ₹36,285 | 36,066.7 ₹36,066.7 |
| 1.50 | Price schedule I (A) Net reparing cost 63 KVA BEE Level-1(Old)/Level 2 (Old) | 63 | KVA | - | 43,636.4 ₹43,636.4 | 39,830.9 ₹39,830.9 | - | 39,530 ₹39,530 | 41,890 ₹41,890 | 42,244 ₹42,244 | 41,123 ₹41,123 | 37,264.4 ₹37,264.4 | 37,631.38 ₹37,631.38 | 37,642 ₹37,642 | 41,651.64 ₹41,651.64 | 41,880.56 ₹41,880.56 | - | 40,564.86 ₹40,564.86 | - | 41,028.6 ₹41,028.6 | 37,583 ₹37,583 | 37,462.72 ₹37,462.72 | 37,594.8 ₹37,594.8 | 41,854 ₹41,854 | - | 41,300 ₹41,300 | 36,403 ₹36,403 | 40,739.5 ₹40,739.5 | - | - | 38,987.2 ₹38,987.2 | 37,895.7 ₹37,895.7 | - | 36,875 ₹36,875 | - | - | - | - | - | 34,515 ₹34,515 | 37,140.5 ₹37,140.5 | 37,630.2 ₹37,630.2 | - | - | - | - | 37,642 ₹37,642 | 41,874.66 ₹41,874.66 | 41,418 ₹41,418 | - | - | 41,600.9 ₹41,600.9 | - | - | - | 41,831 ₹41,831 | 42,397.4 ₹42,397.4 | - | 41,182 ₹41,182 | - | - | - | - | - | - | - | - | - | 41,996.2 ₹41,996.2 | - | - | - | 35,948.7 ₹35,948.7 | - | - | - | 40,851.6 ₹40,851.6 | - | - | - | - | - | - | - | 26,963 ₹26,963 Lowest | - | - | 41,182 ₹41,182 | 43,424 ₹43,424 | - | - | 31,860 ₹31,860 | - | 38,748.84 ₹38,748.84 | 37,188.9 ₹37,188.9 | - | - | 40,774.9 ₹40,774.9 | 41,772 ₹41,772 | 39,471 ₹39,471 | 36,084.4 ₹36,084.4 | - | - | 41,595 ₹41,595 | 40,828 ₹40,828 |
| 1.60 | Price schedule I (A) Net reparing cost 100 KVA Non-Star ( only new design) | 100 | KVA | - | 46,079 ₹46,079 | 46,692.6 ₹46,692.6 | - | 45,819.4 ₹45,819.4 | 45,902 ₹45,902 | 46,444.8 ₹46,444.8 | 45,312 ₹45,312 | 42,598 ₹42,598 | 45,996.4 ₹45,996.4 | 46,079 ₹46,079 | 45,663.64 ₹45,663.64 | 45,892.56 ₹45,892.56 | - | 46,110.86 ₹46,110.86 | - | 45,595.2 ₹45,595.2 | 45,902 ₹45,902 | 45,903.2 ₹45,903.2 | 45,972.8 ₹45,972.8 | 45,889.31 ₹45,889.31 | - | 45,784 ₹45,784 | 44,427 ₹44,427 | 46,256 ₹46,256 | - | - | 43,190.36 ₹43,190.36 | 40,013.8 ₹40,013.8 Lowest | - | 44,427 ₹44,427 | - | - | - | - | - | 45,748.6 ₹45,748.6 | 45,872.5 ₹45,872.5 | 46,008.2 ₹46,008.2 | - | - | - | - | 45,959.82 ₹45,959.82 | 45,886.66 ₹45,886.66 | 46,138 ₹46,138 | - | - | 45,494.9 ₹45,494.9 | - | - | - | 45,902 ₹45,902 | 44,840 ₹44,840 | - | 45,359.2 ₹45,359.2 | - | - | - | - | - | - | - | - | - | 46,256 ₹46,256 | - | - | - | 40,813.84 ₹40,813.84 | - | - | - | 43,188 ₹43,188 | - | - | - | - | - | - | - | 43,896 ₹43,896 | - | - | 45,666 ₹45,666 | 45,902 ₹45,902 | - | - | 44,309 ₹44,309 | - | 45,814.68 ₹45,814.68 | 45,723.48 ₹45,723.48 | - | - | 44,798.7 ₹44,798.7 | 45,902 ₹45,902 | 42,863.5 ₹42,863.5 | 44,592.2 ₹44,592.2 | - | - | 45,607 ₹45,607 | 43,217.5 ₹43,217.5 |
| 1.70 | Price schedule I (A) Net reparing cost 100 KVA BEE Level-1(Old)/Level 2 (Old) | 100 | KVA | - | 50,061.5 ₹50,061.5 | 48,925.16 ₹48,925.16 | - | 50,145.28 ₹50,145.28 | 51,448 ₹51,448 | 51,743 ₹51,743 | 51,271 ₹51,271 | 45,288.4 ₹45,288.4 | 49,190.66 ₹49,190.66 | 49,147 ₹49,147 | 51,209.64 ₹51,209.64 | 51,438.56 ₹51,438.56 | - | 50,122.86 ₹50,122.86 | - | 50,545.3 ₹50,545.3 | 48,970 ₹48,970 | 49,230.09 ₹49,230.09 | 49,040.8 ₹49,040.8 | 51,417.9 ₹51,417.9 | - | 51,094 ₹51,094 | 49,442 ₹49,442 | 50,297.5 ₹50,297.5 | - | - | 49,300.4 ₹49,300.4 | 43,931.4 ₹43,931.4 Lowest | - | 49,011.3 ₹49,011.3 | - | - | - | - | - | 48,970 ₹48,970 | 48,822.5 ₹48,822.5 | 49,076.2 ₹49,076.2 | - | - | - | - | 49,083.28 ₹49,083.28 | 51,432.66 ₹51,432.66 | 49,737 ₹49,737 | - | - | 51,158.9 ₹51,158.9 | - | - | - | 51,094 ₹51,094 | 49,029 ₹49,029 | - | 51,330 ₹51,330 | - | - | - | - | - | - | - | - | - | 51,802 ₹51,802 | - | - | - | 44,810.5 ₹44,810.5 | - | - | - | 50,763.6 ₹50,763.6 | - | - | - | - | - | - | - | 47,554 ₹47,554 | - | - | 50,976 ₹50,976 | 51,448 ₹51,448 | - | - | 47,908 ₹47,908 | - | 51,258.02 ₹51,258.02 | 49,025.23 ₹49,025.23 | - | - | 50,793.1 ₹50,793.1 | 51,448 ₹51,448 | 49,135.2 ₹49,135.2 | 49,029 ₹49,029 | - | - | 50,917 ₹50,917 | 50,734.1 ₹50,734.1 |
| 1.80 | Price schedule I (A) Net reparing cost 200 KVA Non-Star ( only new design) | 200 | KVA | - | 70,918 ₹70,918 | 70,720.94 ₹70,720.94 | - | 70,818.88 ₹70,818.88 | 70,505 ₹70,505 | 70,800 ₹70,800 | 69,856 ₹69,856 | 68,062.4 ₹68,062.4 | 70,787.02 ₹70,787.02 | 70,741 ₹70,741 | 70,266.64 ₹70,266.64 | 70,495.56 ₹70,495.56 | - | 71,244.86 ₹71,244.86 | - | 67,496 ₹67,496 | 70,752.8 ₹70,752.8 | 70,512.23 ₹70,512.23 | 70,634.8 ₹70,634.8 | 70,469.6 ₹70,469.6 | - | 66,670 ₹66,670 | 67,555 ₹67,555 | 71,478.5 ₹71,478.5 | - | - | 67,767.4 ₹67,767.4 | 55,660.6 ₹55,660.6 Lowest | - | 67,708.4 ₹67,708.4 | - | - | - | - | - | 67,053.5 ₹67,053.5 | 70,829.5 ₹70,829.5 | 70,670.2 ₹70,670.2 | - | - | - | - | 70,818.88 ₹70,818.88 | 70,489.66 ₹70,489.66 | 71,272 ₹71,272 | - | - | 70,333.9 ₹70,333.9 | - | - | - | 69,974 ₹69,974 | 67,850 ₹67,850 | - | 69,879.6 ₹69,879.6 | - | - | - | - | - | - | - | - | - | 69,443 ₹69,443 | - | - | - | 56,773.34 ₹56,773.34 | - | - | - | 70,571.08 ₹70,571.08 | - | - | - | - | - | - | - | 67,201 ₹67,201 | - | - | 69,266 ₹69,266 | 72,570 ₹72,570 | - | - | 68,558 ₹68,558 | - | 70,187.58 ₹70,187.58 | 70,325.73 ₹70,325.73 | - | - | 69,720.3 ₹69,720.3 | 70,210 ₹70,210 | 68,516.7 ₹68,516.7 | 67,726.1 ₹67,726.1 | - | - | 69,856 ₹69,856 | 70,630.08 ₹70,630.08 |
| 1.90 | Price schedule I (A) Net reparing cost 200 KVA BEE Level-1(Old)/Level 2 (Old) | 200 | KVA | - | 62,794.88 ₹62,794.88 | 78,328.4 ₹78,328.4 | - | 76,334.2 ₹76,334.2 | 76,405 ₹76,405 | 76,818 ₹76,818 | 76,346 ₹76,346 | 67,826.4 ₹67,826.4 | 77,205.04 ₹77,205.04 | 77,172 ₹77,172 | 74,455.64 ₹74,455.64 | 76,395.56 ₹76,395.56 | - | 76,436.86 ₹76,436.86 | - | 71,036 ₹71,036 | 77,172 ₹77,172 | 76,517.16 ₹76,517.16 | 77,124.8 ₹77,124.8 | 76,392.6 ₹76,392.6 | - | 71,862 ₹71,862 | 73,691 ₹73,691 | 76,611.5 ₹76,611.5 | - | - | 73,313.4 ₹73,313.4 | 60,274.4 ₹60,274.4 Lowest | - | 73,455 ₹73,455 | - | - | - | - | - | 70,038.9 ₹70,038.9 | 77,225.1 ₹77,225.1 | 77,160.2 ₹77,160.2 | - | - | - | - | 77,231 ₹77,231 | 76,389.66 ₹76,389.66 | 78,977.4 ₹78,977.4 | - | - | 76,115.9 ₹76,115.9 | - | - | - | 76,346 ₹76,346 | 76,818 ₹76,818 | - | 76,287 ₹76,287 | - | - | - | - | - | - | - | - | - | 74,340 ₹74,340 | - | - | - | 61,479.18 ₹61,479.18 | - | - | - | 75,496.4 ₹75,496.4 | - | - | - | - | - | - | - | 72,393 ₹72,393 | - | - | 74,340 ₹74,340 | 79,945 ₹79,945 | - | - | 69,148 ₹69,148 | - | 76,310.6 ₹76,310.6 | 76,225.74 ₹76,225.74 | - | - | 74,959.5 ₹74,959.5 | 76,287 ₹76,287 | 74,688.1 ₹74,688.1 | 73,514 ₹73,514 | - | - | 75,992 ₹75,992 | 75,437.4 ₹75,437.4 |
Tender Value
₹119.1 Cr
EMD Value
₹1 L
Closing Date
25 Jul 2022, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE (Pur)
Purchase O/o MD (WZ), GPH Compound Pologround, Indore - 452003
RCA for Repairing and Testing of 11/0.433 KV Distribution Transformers (16 KVA to 200 KVA) for 2 years
2022_MPPKV_209201_1
MD/WZ/06/PUR/NIT-273/TS-1620
Open Tender
Miscellaneous Goods
Item Wise
730 days
MD office
Please refer Tender documents.
8 documents required · 8 mandatory
₹10,000
Yes
₹1 L
Yes
12 Jan 2026
8 Jun 2022
26 Jul 2022
8 Jun 2022
25 Jul 2022
14 Jun 2022
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Price schedule I (A) Net reparing cost 16 KVA Non-Star ( only new design) | 16 | KVA | - | - |
| 1.1 | Price schedule I (A) Net reparing cost 16 KVA BEE Level-1(Old)/Level 2 (Old) | 16 | KVA | - | - |
| 1.2 | Price schedule I (A) Net reparing cost 25 KVA Non-Star ( only new design) | 25 | KVA | - | - |
| 1.3 | Price schedule I (A) Net reparing cost 25 KVA BEE Level-1(Old)/Level 2 (Old) | 25 | KVA | - | - |
| 1.4 | Price schedule I (A) Net reparing cost 63 KVA Non-Star ( only new design) | 63 | KVA | - | - |
| 1.5 | Price schedule I (A) Net reparing cost 63 KVA BEE Level-1(Old)/Level 2 (Old) | 63 | KVA | - | - |
| 1.6 | Price schedule I (A) Net reparing cost 100 KVA Non-Star ( only new design) | 100 | KVA | - | - |
| 1.7 | Price schedule I (A) Net reparing cost 100 KVA BEE Level-1(Old)/Level 2 (Old) | 100 | KVA | - | - |
| 1.8 | Price schedule I (A) Net reparing cost 200 KVA Non-Star ( only new design) | 200 | KVA | - | - |
| 1.9 | Price schedule I (A) Net reparing cost 200 KVA BEE Level-1(Old)/Level 2 (Old) | 200 | KVA | - | - |
stage.html
html • 0.56 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_245496.xls
BOQ Document • 0.34 MB
99567909.pdf
Tender Document • 0.29 MB
TenderDocumentTS1620.pdf
Tender Document • 1.54 MB
99567911.html
Tender Document • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .