Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.8 L+₹15,570 (3.33%)Rejected-Finance | L2 | Rejected-Finance BEING L2 | |
| 3 | L3₹5.0 L+₹31,530 (6.75%)Rejected-Finance | L3 | Rejected-Finance BEING L3 | |
| 4 | L4₹5.7 L+₹1.0 L (21.9%)Rejected-Finance | L4 | Rejected-Finance BEING L4 | |
| 5 | Not Admitted-Fee/PreQual/Technical 329 COD COLONY KOYLA NAGAR PO KIDWAI NAGAR KANPUR 208011 | KANPUR | KANPUR | UTTAR PRADESH | 208011 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹20,700
Closing Date
13 Feb 2021, 6:00 pmClosed
GE I R and D Kanpur
GE I R and D Kanpur DMSRDE Complex, GT Road Kanpur 208013
OUTSOURCING OF LIFTS AT 60 SCIENTIST HOSTEL, MAIN BUILDING AND FFIT BUILDING UNDER GE (I) R and D KANPUR.
2021_MES_413352_1
8226/E8
Open Tender
Electrical and Maintenance Works
Item Rate
330 days
GE I R and D Kanpur
As per NIT
8 documents required · 8 mandatory
₹500
GE I R and D Kanpur
₹20,700
Yes
18 May 2021
16 Jan 2021
15 Feb 2021
18 Jan 2021
13 Feb 2021
30 Jan 2021
Amount
SCHEDULE 'A PART II (LIFT AT 60 SCIENTIST HOSTEL ) Manning and operation of Lifts for 60 Scientist Hostel in three shift for operation of lifts including periodical maintenance, checking of installed components and testing as required as specified in particular specifications complete in three shift i.e. 0600 Hrs to 1400 Hrs & 1400 Hrs to 2200 Hrs,2200 Hrs to 0600 Hrs (No Lift operator shall work more than eight hours) including Sundays and holidays by deploying following staffs : - (a) One Semi-skilled lift operator having ITI qualified or minimum 03 years experience in that trade shall be deployed ( for 03 shifts) in each shifts including reliever lift operator as required and directed .
SCHEDULE 'A PART II (LIFT AT MATERIAL BUILDING AT TECHNICAL AREA) Manning and operation of Lifts for Material Building at Technical Area in one shift for operation of lifts including periodical maintenance, checking of installed components and testing as required as specified in particular specifications complete in one shift i.e. 0900 Hrs to 1700 Hrs (No Lift operator shall work more than eight hours) excluding Sundays and holidays by deploying following staffs : -
SCHEDULE 'A PART II (LIFT AT T&GS BUILDING AT TECHNICAL AREA) Manning and operation of Lifts at T&GS Building for operation of lifts including periodical maintenance, checking of installed components and testing as required as specified in particular specifications complete in one shift i.e. 0900 Hrs to 1700 Hrs (No Lift operator shall work more than eight hours) excluding Sundays and holidays by deploying following staffs : -
Note:-(a) One qualified semi-skilled Lift operator having ITI or minimum 3 years experience in the trade shall be deployed in each shift. (b) The staff engaged by contractor shall be well behaved and polite. Any misbehavior by any worker shall be taken up seriously. The concerned labour shall have to be removed immediately by the contractor and alternative arrangement for the same shall be made without any break. (c) Department shall not be responsible for any accident or injury to any labour while on work. It shall be the responsibility of the contractor to watch the welfare of the labour deployed by him. He shall keep a First Aid Box at site with all necessary medicines.
Kumar Electricals
Gupta Constructions
keerti trading corporation
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .