| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC Accepted, being lowest and reasonable. |
| 2 | L2₹1.3 Cr+₹7.3 L (5.79%)Rejected-AOC C 101 ADG P CHENNAI | ₹1.3 Cr+₹7.3 L (5.79%) | L2 | Rejected-AOC Not accepted. |
| 3 | L3₹1.3 Cr+₹7.9 L (6.24%)Rejected-AOC C 234 ADG P CHENNAI | ₹1.3 Cr+₹7.9 L (6.24%) | L3 | Rejected-AOC Not accepted. |
| 4 | L4₹1.4 Cr+₹10.2 L (8.03%)Rejected-AOC | ₹1.4 Cr+₹10.2 L (8.03%) | L4 | Rejected-AOC Not accepted. |
| 5 | L5₹1.4 Cr+₹11.4 L (9.00%)Rejected-AOC | ₹1.4 Cr+₹11.4 L (9.00%) | L5 | Rejected-AOC Not accepted. |
| Sl No | Description | Qty | Unit | GMS Builders L3 | p.chinnasamy L5 | K.AYYAPPAN L6 | K S MUTHU CONSTRUCTTIONS L1 | M/s.Sai Agency L7 | G Perumal and co L4 | N SARAVANAN L8 | ACE PROMOTERS L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | RCC UG SUMP
Provision of semi UG sump of 42500 gallons with RCC framed construction including inlet and outlet DI pipe connections to existing pipe lines complete all as per specified in drawing No TD/ST/750 Sheet 1/4 to 4/4 and as directed. | 1 | EACH | 29,99,999 ₹29,99,999 | 32,00,000 ₹32,00,000 | 31,25,000 ₹31,25,000 | 29,60,000 ₹29,60,000 Lowest | 33,00,000 ₹33,00,000 | 32,50,000 ₹32,50,000 | 34,00,000 ₹34,00,000 | 35,00,000 ₹35,00,000 |
| 2.00 | PUMP HOUSE
Material and labour for construction of pump room with single storey framed structure of 25 Square Metre complete all as per specified in drawing No TD-610 Sheet 1/5 to 5/5 and as directed.
NOTE: Rtae quoted for Pump Room shall be excluding Internal Electric Supply and Internal Water Supply and items for such services shall be measured and paid separately under relevant of items of BOQ catered hereafter. | 1 | EACH | 8,21,111 ₹8,21,111 | 8,20,000 ₹8,20,000 | 8,10,000 ₹8,10,000 | 6,90,000 ₹6,90,000 Lowest | 8,70,000 ₹8,70,000 | 8,40,000 ₹8,40,000 | 8,00,000 ₹8,00,000 | 10,00,000 ₹10,00,000 |
| 2.01RETAINING WALL | |||||||||||
| 3.00 | Excavation by mechanical means (Hydraulic excavator) means over areas in all kind of soil (exceeding 30 cm in depth, 1.5 m in width as well as 10 Sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, complete all as specified and as directed. | 354.25 | CUBIC METRE | 418 ₹1,48,076.5 | 460 ₹1,62,955 | 375 ₹1,32,843.75 | 340 ₹1,20,445 Lowest | 450 ₹1,59,412.5 | 490 ₹1,73,582.5 | 450 ₹1,59,412.5 | 370 ₹1,31,072.5 |
| 4.00 | Material and labour plain cement concrete 1:4:8 type D-2 using 40 mm graded aggregate in foundations, filling and mass concrete complete all as specified and as directed. | 52.56 | CUBIC METRE | 6,180 ₹3,24,820.8 | 6,500 ₹3,41,640 | 5,900 ₹3,10,104 | 6,000 ₹3,15,360 | 6,350 ₹3,33,756 | 6,650 ₹3,49,524 | 7,000 ₹3,67,920 | 5,500 ₹2,89,080 Lowest |
| 5.00 | Material and labour Reinforced cement concrete (design mix) M-25 using 20 mm graded stone aggregates as in foundations, including rafts, footings, foundation beams, plinth beams, bases for columns, etc. basement slabs, under-reamed piles and mass concrete complete all as specified and as directed. | 93.8 | CUBIC METRE | 9,400 ₹8,81,720 Lowest | 10,500 ₹9,84,900 | 10,500 ₹9,84,900 | 9,500 ₹8,91,100 | 10,350 ₹9,70,830 | 10,150 ₹9,52,070 | 11,000 ₹10,31,800 | 11,000 ₹10,31,800 |
| 6.00 | Material and labour Reinforced cement concrete (design mix) M-25 using 20 mm graded stone aggregates as in walls, retaining walls, basement walls, ballast walls any thickness, above top of footings including attached pilasters and buttresses complete all as specified and as directed. | 83 | CUBIC METRE | 10,600 ₹8,79,800 | 9,800 ₹8,13,400 Lowest | 10,900 ₹9,04,700 | 9,900 ₹8,21,700 | 10,950 ₹9,08,850 | 11,600 ₹9,62,800 | 12,000 ₹9,96,000 | 11,800 ₹9,79,400 |
| 7.00 | Material and labour for steel formwork to sides of concrete foundations, footings, bases of columns, raft and raft beams, sides and soffits (if any) of foundation and plinth beams; and similar work; vertical or to batter, for Rough finished surfaces of concrete flat complete all as specified and as directed.. | 62.2 | SQUARE METRE | 650 ₹40,430 | 688 ₹42,793.6 | 675 ₹41,985 | 600 ₹37,320 | 650 ₹40,430 | 620 ₹38,564 | 700 ₹43,540 | 550 ₹34,210 Lowest |
| 8.00 | Material and labour for steel formwork to faces of walls, retaining walls, abutments, parapets and staircase railings and similar work including attached pillasters, buttresses, etc.; vertical or to batter, for fair finished surfaces of concrete flat complete all as specified and as directed. | 620.8 | SQUARE METRE | 690 ₹4,28,352 | 720 ₹4,46,976 | 690 ₹4,28,352 | 650 ₹4,03,520 | 650 ₹4,03,520 | 640 ₹3,97,312 | 750 ₹4,65,600 | 550 ₹3,41,440 Lowest |
| 9.00 | Supply and fix TMT bars Mild steel bars 10mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified and as directed. | 11,060 | Kilogram | 126 ₹13,93,560 | 128 ₹14,15,680 | 128 ₹14,15,680 | 120 ₹13,27,200 | 130 ₹14,37,800 | 122 ₹13,49,320 | 125 ₹13,82,500 | 110 ₹12,16,600 Lowest |
Tender Value
₹1.1 Cr
EMD Value
₹1.9 L
Closing Date
5 Nov 2025, 6:00 pmClosed
CWE Wellington
Headquarters Commander Works Engineers Wellington, Barracks Post The Nilgiris PIN 643 231
DEMOLITION OF DILAPIDATED OVERHEAD TANK OF CAPACITY 30000 GALLONS AND CONSTRUCTION OF SEMI UNDER GROUND SUMP AT MH WELLINGTON UNDER GE WELLINGTON
2025_MES_733346_1
83041/E8
Open Tender
Civil Works
Item Rate
365 days
WELLINGTON
As per NIT.
7 documents required · 7 mandatory
₹1,000
GE WELLINGTON
₹1.9 L
Yes
O/o CWE Wellington
8 Dec 2025
30 Sept 2025
7 Nov 2025
30 Sept 2025
5 Nov 2025
29 Oct 2025
1 Oct 2025 - 10 Oct 2025
11 Oct 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
CompleteTenderDocuments.pdf
Tender Documents • 1.53 MB
BOQ_821126.xls
BOQ • 0.33 MB
Drawings.pdf
Tender Documents • 5.66 MB
83041DateCorrigendum1.pdf
PDF • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .