| 1.00 | Earth work excavation in all classes ofsoil with intial lead and lift etc., completeas per SS 20 B for foundation. | 107.91 | cum | 245 ₹26,437.95 Lowest | 260 ₹28,056.6 |
| 2.00 | Supplying and Filling foundation and basement with filling M.sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 8.1 | cum | 1,490 ₹12,069 Lowest | 1,600 ₹12,960 |
| 3.00 | Cement concrete 1:4:8mix for foundation using 40mm HBG metal etc. complete. | 11.67 | cum | 5,040 ₹58,816.8 Lowest | 5,100 ₹59,517 |
| 4.00 | Reinforced Cement concrete 1:1.5:3 mix using 20mm HBG metal for foundation and basement etc. complete. | 44.97 | cum | 8,825 ₹3,96,860.25 Lowest | 9,100 ₹4,09,227 |
| 5.00 | Supplying and erecting centering of sides and soffits including supports and strutting up to height for plane surfaces in all floors etc. complete. | 229.86 | sqm | 515 ₹1,18,377.9 Lowest | 550 ₹1,26,423 |
| 6.00 | Supplying and fabrication of steel including cost and conveyance and cutting, bending, tying and placing in position | 3.2 | mt | 89,880 ₹2,87,616 Lowest | 91,000 ₹2,91,200 |
| 7.00 | Brick work in CM 1:5mix using country bricks ground moulded of size 23 x 11 x 7cm for the following including curing etc., complete complying with standard specifications | 62.57 | cum | 5,935 ₹3,71,352.95 Lowest | 6,100 ₹3,81,677 |
| 8.00 | Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers | 646 | sqm | 267.2 ₹1,72,611.2 Lowest | 280 ₹1,80,880 |
| 9.00 | Painting two coats with Plastic emulsion paint of approved colour over a priming coat including thorough scrapping, clean removal of dirt etc complete and including necessary plaster of paries, putty wherever necessary | 646 | sqm | 249 ₹1,60,854 Lowest | 260 ₹1,67,960 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.
{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount | 2,88,899.29 ₹2,88,899.29 Lowest | 2,98,422.11 ₹2,98,422.11 |
Tender Value
₹19 L
EMD Value
₹19,000
Closing Date
7 Jul 2025, 3:00 pmClosed
Block Development Officer (VP) Acharapakkam
Block Development Office (VP) Acharapakkam
Construction of Compound wall to Adhidravidarcolony Burial Ground in Theetalam Colony at Theetalam Panchayat at Acharapakkam Panchayat Union in Chengalpattu District Under ITPHIS
2025_RDTN_576603_1
DIPR/765/2025/A14
Open Tender
Civil Works
Item Rate
90 days
Theetalam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹19,000
Yes
Block Development Office (VP) Acharapakkam
20 Aug 2025
1 Jul 2025
7 Jul 2025
1 Jul 2025
7 Jul 2025
1 Jul 2025
2 Jul 2025
Amount
Earth work excavation in all classes ofsoil with intial lead and lift etc., completeas per SS 20 B for foundation.
Supplying and Filling foundation and basement with filling M.sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1:4:8mix for foundation using 40mm HBG metal etc. complete.
Reinforced Cement concrete 1:1.5:3 mix using 20mm HBG metal for foundation and basement etc. complete.
Supplying and erecting centering of sides and soffits including supports and strutting up to height for plane surfaces in all floors etc. complete.
Supplying and fabrication of steel including cost and conveyance and cutting, bending, tying and placing in position
Brick work in CM 1:5mix using country bricks ground moulded of size 23 x 11 x 7cm for the following including curing etc., complete complying with standard specifications
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers
Painting two coats with Plastic emulsion paint of approved colour over a priming coat including thorough scrapping, clean removal of dirt etc complete and including necessary plaster of paries, putty wherever necessary
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K.SEETHALAKSHMI (BID ID -1392673)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_689006.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .