Development of roads and Construction of drains in ward no 02, ward 04 in channamma nagar 3rd cross and Development of Roads in ward no 7 in Sunagar oni, ward no 9 near Taladamma temple, ward no 9 near Nagappa temple and Construction of drains in ward no 9 Gokar oni and ward no 10 in M K Hubli TP of Kittur Constituency
DMA/2025-26/OW/WORK_INDENT55507
DMA/2025-26/OW/WORK_INDENT55507
Open
Other Works
Two Tender Document System(Two Cover)
DMA Town Panchayat M K Hubli
₹2,030
₹1.6 L
25 Mar 2026
6 Mar 2026
26 Mar 2026
23 Mar 2026
Development of roads and Construction of drains in ward no 02, ward 04 in channamma nagar 3rd cross and Development of Roads in ward no 7 in Sunagar oni, ward no 9 near Taladamma temple, ward no 9 near Nagappa temple and Construction of drains in ward no 9 Gokar oni and ward no 10 in M K Hubli TP of Kittur Constituency
Earth work in surface excavation by manual means for lowering & levelling the ground by chiselling and wedging in Hard rock for all works other than foundation & depth not exceeding 100 mm as per draw...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and com...
Providing and laying 80mm thick factory made precast M -30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Commercial Traffic Axle load repetitions upto 10MSA & for Residential ...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work PWD SR Vol 3 P No 17, I No 3.1
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and laying in Reinforced cement concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/ trap/basalt crushed graded coarse aggregates a...
As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate as per table below For Drain form works Consider 35%
As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate as per table below For Drain form works Consider 50%
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Construction of un-reinforced plain cement concrete pavement using RMC M-30 grade with OPC @ 270 kg/m3 and GGBS@ 90 kg/m3(75:25 proportion) as per approved mix design procedure and thickness as per de...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
kw-3 -Pkg2.docx
Tender Document • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .