Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹129.1 CrAdmitted-Finance 4TH FLOOR PLOT NO 814 UDHYOG VIHAR PHASE V GURGAON HARYANA 122016 | GURUGRAM | HARYANA | 122016 | L1 | Admitted-Finance | |
| 2 | L2₹139.3 Cr+₹10.1 Cr (7.82%)Admitted-Finance 249 NEW MODEL TOWN LUDHIANA | LUDHIANA | PUNJAB | 141001 | L2 | Admitted-Finance | |
| 3 | L3₹147.5 Cr+₹18.4 Cr (14.2%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹149.0 Cr+₹19.9 Cr (15.4%)Admitted-Finance 1 13 16 G KHAPARADEEH KOTHI CAMPUS CIVIL LINES AYODHYA UTTAR PRADESH 224001 | AYODHYA | AYODHYA | UTTAR PRADESH | 224001 | L4 | Admitted-Finance | |
| 5 | L5₹158.5 Cr+₹29.4 Cr (22.7%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | NARENDRA SHARMA L5 | M/S R and C INFRAENGINEERS PVT LTD L4 | S S BUILDERS L2 | M/s Skylark Infra Engineering Pvt. Ltd. L1 | LEKCON INFRASTRUCTURE PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 66+000 to km 81+000 (Design Chainage 65+923 to 80+930) of Dokmoka – LoringThepi Section (Section 3) of NH-29 in the state of Assam under Bharatmala Pariyojna on EPC mode | 1 | Lump Sum | 1,58,50,00,000 ₹1,58,50,00,000 | 1,49,00,00,009 ₹1,49,00,00,009 | 1,39,25,00,000 ₹1,39,25,00,000 | 1,29,14,46,000 ₹1,29,14,46,000 Lowest | 1,47,53,94,390 ₹1,47,53,94,390 |
Tender Value
₹165.6 Cr
Closing Date
6 Jul 2020, 11:00 amClosed
K C Bhatt
K.C.Bhatt DGM (Technical) National Highway and Infrastructure Development Corporation Ltd. PTI Building, 3rd Floor, 4 Parliament Street, New Delhi-110001
Widening/Improvement to 4 Lane with Paved Shoulder from km 66.000 to km 81.000 (Design Chainage 65.923 to 80.930) of Dokmoka LoringThepi Section3 of NH-29 in the state of Assam under Bharatmala Pariyojna on EPC mode
2020_NHIDC_557863_1
NHIDCL/Assam/NH-29/Dab-Man/ Pkg-3/2020
Open Tender
Civil Works
EPC Contract
548 days
Assam
Please refer Tender documents.
4 documents required · 4 mandatory
₹23,600
MD NHIDCL
Exempted
NHIDCL HQ
7 Aug 2020
5 May 2020
7 Jul 2020
5 May 2020
6 Jul 2020
22 Jun 2020
5 May 2020 - 12 Jun 2020
12 Jun 2020
Amount
Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 66+000 to km 81+000 (Design Chainage 65+923 to 80+930) of Dokmoka – LoringThepi Section (Section 3) of NH-29 in the state of Assam under Bharatmala Pariyojna on EPC mode
S S BUILDERS
LEKCON INFRASTRUCTURE PRIVATE LIMITED
M/S R and C INFRAENGINEERS PVT LTD
NARENDRA SHARMA
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .