Loading…
Loading…
Tender Value
₹8.1 L
EMD Value
₹16,110
Closing Date
15 Jun 2026, 11:00 am
V.P. Sarpanch
V.P. Curca-Bambolim-Talaulim, Tiswadi-Goa 403108.
Reconstruction of Retaining Wall of Procession Bandh near Fofai bridge at Old Bambolim W No. 10, V.P. Curca-Bambolim-Talaulim, Tiswadi-Goa.
2026_VP_29500_1
VP/CBT/2026-27/653
Open Tender
Civil Works
60 days
V.P. Curca-Bambolim-Talaulim
2 documents required · 2 mandatory
₹5,000
₹16,110
4 Jun 2026
4 Jun 2026
17 Jun 2026
4 Jun 2026
15 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Demolishing cement concrete 1:3:6 or richer mix including disposal of material within 50 m lead | 43.5 | M3 | 1,122 | ₹48,807 |
| 2Earthwork in excavation by mechanical means (hydraulic excavator/ manual means in foundation pipeline trenches drain (not exceeding 1.5m in width or 10 sq.m on plan) including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. | |||||
| 2.01 | All kinds of Soil | 52.2 | M3 | 291 | ₹15,190.2 |
| 2.02 | Rubble packing with hard laterite stone under floors including watering ramming, and consolidating etc. in pipeline trenches and other foundation complete. | 11.6 | M3 | 2,211 | ₹25,647.6 |
| 3Providing and laying in position cement concrete 1:2:4 (1 cement:2 coarse sand :4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing: | |||||
| 3.01 | All works upto plinth level | 87.34 | M3 | 6,635 | ₹5,79,500.9 |
| 4Centering and shuttering including struttings propping etc. and removal of fromwork for: | |||||
| 4.01 | Foundation, footings, bases for columnsand mass concrete | 324.8 | M2 | 407 | ₹1,32,193.6 |
| 5Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge | |||||
| 5.01 | 75 mm dia | 22 | M2 | 182 | ₹4,004 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_29924.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid